
ITR Filing 2025 Begins: Who Needs To File Income Tax Return? All You Need To Know
ITR filing for FY 2024-25 has begun, with a deadline of September 15 for non-audit ITRs; check a detailed guide on who needs to file the income tax return.
ITR Filing 2025: The filing of income tax returns has commenced for the financial year 2024-25 (assessment year 2025-26), with a deadline of 15 September for non-audit ITRs. The Income Tax Department permitted Excel Utility-based return filing on 30 May, but online filing is yet to begin. As of 10:30 am on 2 June, a total of 54,389 income tax returns have been filed, of which 48,975 have been verified. Who needs to file an ITR? Here's a detailed guide:
Whether you are a salaried employee, a freelancer, a business owner, or even someone without taxable income, there are several situations where filing an ITR is either mandatory or highly recommended.
1. Income Above Basic Exemption Limit
For AY 2025-26, the basic exemption limit under the new tax regime is Rs 4 lakh, applicable to all individuals irrespective of age. Under the old tax regime, the exemption limits remain at Rs 2.5 lakh for individuals below 60 years, Rs 3 lakh for senior citizens, and Rs 5 lakh for super senior citizens.
(Note: Under the old tax regime, these limits apply before claiming deductions under sections like 80C, 80D, etc.)
Who Should Voluntarily File ITR?
According to income tax experts, even if you are not legally required to, filing an ITR can be extremely beneficial:
To claim income tax refunds (e.g., TDS deducted from salary or bank interest).
For visa or loan applications (ITR is accepted as proof of income).
To carry forward losses (only allowed if ITR is filed on time).
To build financial credibility (helps in business registration, securing funding, or applying for tenders).
ITR-1 To ITR-7: Which ITR Form To Choose?
ITR-1 (Sahaj): For resident individuals (not HUFs) with income up to Rs 50 lakh from salary, long-term capital gains tax up to Rs 1.25 lakh under Section 112A, one house property, other sources (interest, etc.), and no capital gains or business income.
ITR-2: For individuals and HUFs with income from capital gains, more than one house property, foreign income/assets, but no business or professional income.
ITR-3: For individuals and HUFs with income from a business or profession, including partners in firms.
ITR-4 (Sugam): For resident individuals, HUFs, and firms (other than LLPs) with presumptive income under sections 44AD, 44ADA, or 44AE, and income up to Rs 50 lakh (for individuals).
ITR-5: For partnership firms, LLPs, AOPs, BOIs, cooperative societies, and other persons not filing ITR-7.
ITR-6: For companies other than those claiming exemption under section 11 (income from charitable or religious activities).
ITR-7: For persons including trusts, political parties, research institutions, universities, or funds claiming exemption under sections 139(4A) to 139(4F).
Due Date for Filing ITR for AY 2025-26
Individual taxpayers not subject to audit: September 15, 2025
Businesses requiring audit: October 31, 2025.
Late filing attracts a penalty under Section 234F and may delay refunds.
Frequently Asked Questions (FAQs)
A: No, unless you fall under specific cases like high-value transactions or owning foreign assets.
A: Yes, it is recommended for refunds, visas, loans, and establishing a financial history.
Q: I'm a student earning via freelancing. Should I file ITR?
A: Yes, if your income exceeds Rs 4 lakh or TDS has been deducted.
top videos
View all
Q: What if I miss the deadline?
A: You can file a belated return until 31 December 2025, with a penalty and interest.
Location :
New Delhi, India, India
First Published:
June 02, 2025, 10:54 IST
News business » tax ITR Filing 2025 Begins: Who Needs To File Income Tax Return? All You Need To Know

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


Mint
an hour ago
- Mint
Telecom testing just got cheaper as govt slashes certification fees by up to 95%
India has slashed the security certification fee for telecom equipment makers, the latest in a series of regulatory moves to ease business compliance requirements for companies importing or making telecom and tech equipment or products indigenously. Companies such as Nokia, Ericsson, Cisco Systems Inc., HFCL Ltd, and Dixon Technologies (India) Ltd will benefit from the government's decision to cut the fee by up to 95% for more than 50 categories of telecom and tech products. These include routers, connected devices, satellite equipment, smart meters, optical fiber cables, and 5G and WiFi gear, according to a government official and an internal document reviewed by Mint. 'Testing of telecom equipment is a key requirement," the official said, declining to be identified. 'The current downward revision in pricing pertains to the fee paid by the companies to the government to get certification, which is also known as security test report evaluation fee." A telecom or tech equipment maker or importer needs to engage a lab designated by the government to test its products and ensure the devices are safe for users and secure for communication networks. The government will later issue a security certificate if satisfied with the lab's report. Effective 1 August, the cost for this certification has been slashed to ₹10,000-50,000 per equipment model from ₹2-3.5 lakh. The National Centre for Communication Security (NCCS) on 30 June circulated a note to Department of Telecommunications officials informing about the reduction in the security test report evaluation fee. 'On an average, the overall cost for testing comes to ₹60-65 lakh per unit, which largely includes the third-party lab-testing costs," said Paritosh Prajapati, chief executive and founder of Sweden-based broadband equipment maker GX Group, which is a beneficiary of India's productivity-linked incentive scheme for the telecom sector. 'While this reduction in certification fee now is a breather, there is also a need for the government to increase testing labs and increase their capacity," he added. A time-consuming process The relaxation in testing and certification costs for telecom companies comes at a time when India is engaged in key trade negotiations with the United States, even as the US announced a 25% tariff plus a penalty on Indian goods from 1 August. In March, the US Trade Representative (USTR) had raised concerns about India's testing and certification system. The concerns included limited testing capacity, a slow and complex registration process, cancellations over non-safety issues, and high compliance costs. 'The US government has recommended that the Indian Government recognize internationally accredited labs, harmonize labeling requirements withglobal practices, harmonize the validity period of test reports and certification, and eliminate retesting requirements," USTR said in its report. India has seven designated telecom security testing labs, and has issued 92 security certificates so far, NCCS data show. HFCL, Cisco, Dixon Electro Appliances, and Hewlett Packard Enterprise, among others, have applied and received security certifications for different products. While India launched the Communication Security Certification Scheme in 2020 to streamline the process, there have been delays in implementing rules related to certification. Also, as telecom equipment makers raised complaints about inadequate testing capacity and a cumbersome registration process, the scheme has not been universally applied across the telecom ecosystem. While the government's decision to reduce the security certification fee will help the industry, 'the more challenging part is the time consumed in this process of testing, which also needs to be brought down", said Konark Trivedi, founder and managing director of telecom equipment maker Frog Cellsat Ltd. The industry also needs a system to ensure that every equipment entering the country meets the government's security criteria, he added. Ease of doing business, but at what cost? Apart from a security certificate, telecom companies are also required to obtain a trusted source certification from the National Security Council Secretariat, and mandatory testing and certification of telecom equipment, which is issued by the Telecommunication Engineering Centre. On 7 April, the National Centre for Communication Security excluded products related to optical network terminals and optical line terminals from mandatory testing and security certification, and including them under the voluntary security certification regime till 31 August. NCCS also waived administrative and security test evaluation fees for the period. An optical line terminal is the main device at a telecom provider's end that manages data flow over fiber networks. An optical network terminal is the device at the customer's home that converts fiber signals into internet and other services. The fee reductions were part of the government's efforts towards improving ease of doing business in India for global telecom equipment makers. On 15 July, Mint reported that India had dropped its demand that telecom equipment suppliers hand over proprietary source code, a key piece of software that controls the working of an equipment. Instead, manufacturers are required to provide just a summary of internal security test results. However, local gear makers expressed concerns sustained pressure from multinational companies may have influenced the government's decision to relax its source code sharing and certification requirements.


Time of India
an hour ago
- Time of India
From shopfloor to C-suite: Mahindra offers Diwali Esops to 14,000 employees
The Mahindra Group has announced a one-time employee stock ownership plan (Esop) grant for 12,000-14,000 employees, including shop floor workers for the first time ever. The move across three core companies—Mahindra & Mahindra (auto and farm sector), Mahindra Electric Automobile and Mahindra Last Mile Mobility —comes amid surging sales and profit on the back of hit products such as the Thar driving the M&M stock up more than 12 times in five years. Mahindra has also overtaken Hyundai to become the country's second biggest manufacturer of passenger vehicles, thanks to its range of SUVs. Explore courses from Top Institutes in Please select course: Select a Course Category Project Management Product Management MBA Data Science Healthcare healthcare Leadership Others Technology Artificial Intelligence Finance Data Analytics Operations Management Digital Marketing others Degree CXO MCA Design Thinking Public Policy Management Data Science Cybersecurity PGDM Skills you'll gain: Portfolio Management Project Planning & Risk Analysis Strategic Project/Portfolio Selection Adaptive & Agile Project Management Duration: 6 Months IIT Delhi Certificate Programme in Project Management Starts on May 30, 2024 Get Details Skills you'll gain: Project Planning & Governance Agile Software Development Practices Project Management Tools & Software Techniques Scrum Framework Duration: 12 Weeks Indian School of Business Certificate Programme in IT Project Management Starts on Jun 20, 2024 Get Details The Esops will help broad-based wealth creation, the tractor-to-technology conglomerate said in an internal circular. ET has seen the note. It did not reveal how many shares the group will earmark for this purpose, but people in the know estimate the total outflow to be in the range of Rs 400-450 crore. While granting Esops to keep employees motivated is not unusual, this could be the first time a large Indian conglomerate extends these benefits to shopfloor workers. The Esops, structured as restricted stock units (RSUs). by Taboola by Taboola Sponsored Links Sponsored Links Promoted Links Promoted Links You May Like Indonesia: Unsold Sofas at Bargain Prices (Prices May Surprise You) Sofas | Search Ads Search Now Undo Productivity Boost? The grant is being positioned as a reward for long-term contribution and a tool to align employees with value creation. 'This special grant reflects the organisation's appreciation for your efforts, makes you a co-owner of this enterprise, and gives you a share in the value that you have helped co-create,' said Anish Shah, group chief executive and managing director of M&M, in a note to employees. Live Events Rajiv Agarwal, department chair for strategy at leading B-school SPJMR, said with this move, Mahindra is fostering a productive environment, where labour participation drives higher overall productivity. 'This approach not only supports the company's growth but also allows employees to benefit from the rise in the stock price,' Agarwal said. 'It's a smart strategy — compensating workers not just with their salaries for the hours they work, but also rewarding them when the company does well. This dual benefit truly aligns employees' interests with the company's success.' The Esop scheme comes on the back of a sharp surge in valuations of Mahindra Electric and Mahindra Last Mile as well. Both have seen over 10x growth in the past five years, supported by strong execution, strategic focus and new business momentum. M&M's shares closed at Rs 3,160 on the BSE on Friday, down 1.35% from its previous close. Its market cap stood at Rs 3,92,925 crore. The Esop shares will be granted to employees on permanent payrolls with at least 12 months' tenure in the group as of the announcement date. Depending on their income tax bracket, the beneficiaries may have to pay tax on the profits they make when they sell their Esop shares. However, shopfloor workers who earn below the taxable income limit won't have to pay any tax on these gains. The Mahindra Group communication credited executive chairman Anand Mahindra and executive director Rajesh Jejurikar for steering the transformation, while thanking employees' families and retired leaders for their support.


Time of India
an hour ago
- Time of India
AMC's poor planning halts city's longest flyover
Ahmedabad: In what has become a recurring pattern of poor planning and execution, the Ahmedabad Municipal Corporation (AMC) has once again stumbled in delivering critical infrastructure. This time its the city's longest flyover, the 2.5-km Naroda Patiya flyover, which now mired in delays due to unresolved land and environmental clearance issues. Progress on the project, hailed as a major development for eastern Ahmedabad, has been halted by the forest department, which has refused to allow further construction until compensation for 1.3 hectares of forest land is provided. In addition, 143 trees located on the designated land cannot be felled until re-plantation land is allocated, in accordance with state forest regulations. This bureaucratic stand-off, stemming from the AMC's failure to secure the necessary clearances before starting construction, now threatens to derail the project timeline and inconvenience thousands of commuters. You Can Also Check: Ahmedabad AQI | Weather in Ahmedabad | Bank Holidays in Ahmedabad | Public Holidays in Ahmedabad The flyover — from Naroda Patiya to Galaxy Char Rasta — was approved on Aug 23, 2021, by the AMC's road and building committee at an estimated cost of Rs 197.98 crore. It was conceived as a merger of three earlier proposed flyovers in the eastern corridor. Construction began on July 17, 2023, with a 36-month deadline set for July 2026. But as of March 1, 2025, only 36.8% of the work had been completed. "The bridge alignment cuts through forest land near Devi Cinema, and without fulfilling the re-plantation and land compensation clauses, the forest department has rightly refused to permit further work," an AMC official admitted. While work continues on other sections, the deadlock over forest land casts serious doubt on whether the project will be completed on time. The Naroda Patiya debacle is far from an isolated case. Over the past decade, AMC and AUDA (Ahmedabad Urban Development Authority) have routinely failed to deliver flyovers, underpasses, and railway bridges on schedule. Cost overruns, design changes mid-construction, and inter-agency coordination failures plague nearly every project. The Income Tax flyover was delayed due to post-approval design changes, inflating costs by Rs 10 crore. The Ranip GST flyover was held up for two years due to issues with railway land acquisition. The Ajit Mill Junction flyover faced a year-long delay due to flawed design. The Pallav Crossroads and Dahegam Circle flyovers were both delayed by over two years due to utility and land clearance hurdles. The Panjrapol flyover suffered a late start and ongoing delays due to changes in direction and design. Each project follows a similar script — work begins with much fanfare, foreseeable issues are overlooked, deadlines are missed, budgets balloon, and commuters are left to suffer the consequences. Box: Sinking credibility Infrastructure Start Date Proposed Duration Progress (%) Sattadhar Flyover Bridge Aug 28, 2023 26 months 55 Naroda Patiya Junction Flyover July 17, 2023 36 months 37 Bootbhawani Railway Overbridge Aug 8, 2023 26 months 53 Makarba-SG Highway Bridge Sep 30, 2022 26 months 89 Hebatpur Railway Overbridge Feb 13, 2023 26 months 60 Vadaj Junction Flyover Bridge July 28, 2023 30 months 23 Panjrapol Junction Flyover Bridge Mar 16, 2024 26 months 0.75 Vandemataram Railway Underpass Mar 16, 2024 18 months 2 Ellisbridge Repair and Rehabilitation Sep 11, 2024 12 months 26