logo
BBMF Lancaster sends emergency alert after suffering engine issue

BBMF Lancaster sends emergency alert after suffering engine issue

BBC News14 hours ago
An investigation has been launched after a Battle of Britain Memorial Flight (BBMF) Lancaster bomber suffered an engine problem earlier, the RAF has confirmed.The Avro Lancaster PA474, which had been taking part in the RAF Waddington Families Day in Lincolnshire, sent a general emergency alert as black smoke was seen coming from one of its four engines.According to the RAF, the crew of the iconic World War Two aircraft "diagnosed unusual engine behaviour" and returned to its base at RAF Coningsby "as a precautionary measure".An RAF spokesperson added: "Crew are well trained to handle such events, and an investigation of the aircraft has been launched."
None of the aircrew were injured and it's not known if the investigation will impact upcoming scheduled appearances.The BBMF also operates five Spitfires, two Hurricanes and a C47 Dakota.The Lancaster is the most famous and successful RAF bomber of World War Two. Out of 7,377 that were built, the PA474 is one of only two airworthy Lancasters left in the world.
Listen to highlights from Lincolnshire on BBC Sounds, watch the latest episode of Look North or tell us about a story you think we should be covering here.
Download the BBC News app from the App Store for iPhone and iPad or Google Play for Android devices
Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

The only time a ‘sorry' expresses true regret
The only time a ‘sorry' expresses true regret

The Independent

timean hour ago

  • The Independent

The only time a ‘sorry' expresses true regret

Academics have found that Britons use the word "sorry" in as many as 15 different ways. Only one of these uses expresses true regret, which is when someone is genuinely sorry to hear another person's bad news. The term "sorry" is frequently employed as a social lubricant, for politeness, or to ease awkward situations, rather than as a literal apology. This unique multifunctionality of "sorry" can cause confusion for foreigners who might assume a genuine apology is being made. A previous survey suggested Britons say "sorry" on average up to nine times a day.

Woolwich foot tunnel lift repair to start shortly, council says
Woolwich foot tunnel lift repair to start shortly, council says

BBC News

timean hour ago

  • BBC News

Woolwich foot tunnel lift repair to start shortly, council says

Work to repair a lift in a tunnel linking two London boroughs on either side of the River Thames should begin "shortly".The northern lift of the Woolwich foot tunnel, which runs from Old Woolwich in Greenwich to North Woolwich in Newham, has been out of service since August repair, which will be funded by both councils equally, was originally hoped to have been completed by January councillor Sarah Ruiz, who is responsible for sustainable transport, said the work would be completed "sometime within the next year". The tunnel is open 24 hours day, seven days a week and is used by an estimated 300,000 pedestrians and cyclists each the north and south entrances, built by London County Council and opened in October 1912, are Grade II listed buildings. Both councils have an equal financial responsibility for the 112-year-old on 3 July, an update to Greenwich council's transport scrutiny panel suggested the authority was waiting for Newham council to sign an said the council was "currently awaiting Newham to respond on Woolwich foot tunnel and sign deed of adherence to Woolwich tunnel parts replacement maintenance cost sharing". The Local Democracy Reporting Service said neither council would comment on why the agreement had not yet been signed or why work had not yet begun – but both said they were committed to sharing the costs.A Greenwich council spokesperson said: "We have received a commitment from Newham Council, to split costs 50/50 and get the lifts up and running. We will be sharing plans on next steps and timelines, in due course."Ms Ruiz, for Newham, said: "We are pleased to say that work should be getting under way shortly to repair the northern lift shaft."Both Newham and Greenwich are sharing the cost of repairs, which fall outside of the routine maintenance agreement for the tunnel. We hope to have the works completed sometime within the next year."

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into a world of global content with local flavor? Download Daily8 app today from your preferred app store and start exploring.
app-storeplay-store