
Can Sanchari Cauvery solve Bengaluru's water crisis?

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


New Indian Express
4 days ago
- New Indian Express
Illegal connections: BWSSB sends notices to 338 homes
BENGALURU: The Bangalore Water Supply and Sewerage Board (BWSSB), which had claimed it is struggling financially and making efforts to shape up, has begun sending notices to 383 homes and apartment complexes over unauthorised water connections, and urged them to get the connections regularised by paying fees along with penalties. Board Chairman Ram Prasath Manohar said untreated water from apartments is a big challenge to the board, so they have imposed penalties ranging from a few lakhs to Rs 1crore, depending on the size of the complex. 'By regularizing these connections and imposing penalties, BWSSB is hoping to generate Rs 200 crore in revenue,' he said, adding that since the past 15 days, BWSSB is disconnecting services, and in the next 15 days, the process of regularization will be taken up. The chairman also stated that the BWSSB team used Bangalore Electricity Supply Company (Bescom) connection data and probed unauthorized BWSSB connections. So far, it has recorded 43,000 such connections across Bengaluru, and officials are following up cases to ensure owners get their connections regularized. A senior official from the BWSSB waste water management said the crackdown on large apartment complexes is to ensure that untreated water comes into the BWSSB's record so plans can be made to ensure contaminated water is treated before it reaches storm water drains and lakes.


Business Standard
26-07-2025
- Business Standard
Va Tech Wabag wins work order of Rs 380 cr
From Bangalore Water Supply and Sewerage Board Va Tech Wabag has secured secured a Design, Build, Operate ('DBO') order funded by World Bank, worth about Rs 380 crore from the Bangalore Water Supply and Sewerage Board (BWSSB) towards Design, Engineering, Construction and Commissioning (EPC) of Wastewater Treatment Plants (WWTPs) with Tertiary Treatment Facility, Biogas Generation, Solar Sludge Drying Beds and Intermediate Pumping Stations along with associated piping works, scheduled to be completed over 30 months, followed by 10 years of Operation and Maintenance (O&M). These advanced WWTPs, located at four sites in Bommanahalli under the Karnataka Water Security and Disaster Resilience Program, are vital for the region's long-term water sustainability. Utilizing cutting-edge treatment technologies, they enable industrial reuse of tertiary-treated wastewater, reducing freshwater demand and strengthening Bengaluru's water security. The project's green initiative includes anaerobic digestion of sludge to generate biogas, which powers plant operations, lowers external energy use, improves efficiency, and supports broader sustainability goals.


Business Standard
25-07-2025
- Business Standard
Enviro Infra Engineers wins projects worth Rs 221.25 cr
From Bangalore Water Supply and Sewerage Board Enviro Infra Engineers has received letter of acceptances for two EPC projects worth Rs 221.25 crore from Bangalore Water Supply and Sewerage Board. These projects include: 1. Design, Engineering construction and commissioning of wastewater Treatment Plant with Tertiary Treatment Facility and Intermediate Sewage Pumping Station along with Operation & Maintenance thereof for ten years for Byatarayanapura Zone (DBO mode) in 110 village areas(Phase-II) under Karnataka Water Security and Disaster Resilience Program (KWSDRP). 2. Design, Engineering construction and commissioning of wastewater Treatment Plants with Tertiary Treatment Facility, Solar Panels along with Operation & Maintenance thereof for ten years (Works-A) and procurement and construction of Raising Main, main sewers and laterals including machine holes and lift sewage pumping stations (Works-B) hybrid mode for Mahadevapura zone in 110 village areas (Phase-II) under Karnataka Water Security and Disaster Resilience Program(KWSDRP).