logo
Sheikh Hamdan reviews progress of key strategic road corridors

Sheikh Hamdan reviews progress of key strategic road corridors

TAG 91.105-05-2025
Major infrastructure and mobility projects have been reviewed by the Crown Prince of Dubai, as part of efforts to support the city's growing population and long-term urban development goals.
The projects, part of Dubai's Roads and Transport Authority (RTA) 2025–2027 plan, include the development of 226 km of roads and 115 bridges, aimed at serving over 8 million residents by 2040.
Among the most prominent initiatives are upgrades to the Umm Suqeim – Al Qudra Corridor, Hessa Street, Latifa bint Hamdan Street (from Al Khail Road to Emirates Road), Al Meydan Street, Al Mustaqbal Street, the Dubai World Trade Centre roundabout, and Al Fay Road — an extension of Al Khail Road from its intersection with Sheikh Mohammed bin Zayed Road through Sheikh Zayed bin Hamdan Al Nahyan Street to Emirates Road.
These upgrades are expected to significantly increase traffic capacity and reduce travel times.
His Highness Sheikh Hamdan bin Mohammed bin Rashid Al Maktoum, Crown Prince of Dubai, Deputy Prime Minister Defence Minister, also reviewed plans for autonomous taxis, with 60 vehicles set to begin road mapping ahead of a planned 2026 launch, as well as the expansion of Dubai's cycling infrastructure, which currently spans 557 km, with further additions underway. As part of the emirate's smart mobility strategy, advanced technologies such as artificial intelligence, drones, and dynamic tolling systems are already enhancing traffic flow and project oversight.
Additionally, Sheikh Hamdan was updated on the Al Barsha 2 Model District project, which aims to promote sustainable living through integrated pedestrian and cycling networks, expanded green spaces, and access to essential services within a 20-minute radius, in line with the Dubai 2040 Urban Master Plan.
Model District in Al Barsha 2
The Model District Project in Al Barsha 2, which is designed to enhance liveability, expand green and open spaces, improve pedestrian infrastructure, and promote sustainable mobility.
Cycling tracks
The emirate currently boasts of 557 km of… pic.twitter.com/TqRMrH45gw
— Dubai Media Office (@DXBMediaOffice) May 4, 2025
Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

New 4-lane underpass to cut travel time between Dubai's key roads by 61%
New 4-lane underpass to cut travel time between Dubai's key roads by 61%

ARN News Center

time4 hours ago

  • ARN News Center

New 4-lane underpass to cut travel time between Dubai's key roads by 61%

Dubai's Roads and Transport Authority (RTA) has opened an 800-metre four-lane underpass that will cut travel time between Sheikh Mohammed bin Zayed and Al Khail roads by 61 per cent, dropping from 9.7 minutes to 3.8 minutes. It's part of the Umm Suqeim Street Development Project that aims to enhance connectivity between four strategic corridors - Sheikh Zayed Road, Al Khail Road, Sheikh Mohammed bin Zayed Road and Emirates Road. Making the announcement on Sunday, Mattar Al Tayer, Director General, Chairman of the Board of Executive Directors of RTA, said the underpass will "increase the capacity of Umm Suqeim Street to 16,000 vehicles per hour in both directions and improve traffic flow". It will also "serve several residential and development areas, including Al Barsha South 1, 2, and 3, Dubai Hills, Arjan, and Dubai Science Park, home to a population of over one million". Dubai's Roads and Transport Authority opens an 800-metre tunnel with four lanes in each direction, as part of the Umm Suqeim Street Development Project, which extends from the intersection with Al Khail Road to the intersection with Sheikh Mohammed bin Zayed Road. The project… — Dubai Media Office (@DXBMediaOffice) August 3, 2025 Al Taye added that 'the Umm Suqeim Street Development Project extends from the intersection with Al Khail Road to the intersection with Sheikh Zayed Road, covering a distance of 4.6 km". It also "included upgrading the intersection of Umm Suqeim Street with Al Barsha South Street, near Kings' School and "a signalised surface-level intersection". He added that the 'completed project is part of a comprehensive plan to develop the Umm Suqeim–Al Qudra corridor, which extends from the intersection with Jumeirah Street to the intersection with Emirates Road, spanning a total of 16 km". It is "considered one of the most important strategic projects for developing transverse east–west roads to enhance connectivity with vertical north–south roads". Deploying smart tech The RTA used drones to analyse construction data using artificial intelligence, enhancing operational efficiency on-site, accelerating decision-making, and providing real-time, highly accurate information. These technologies also doubled on-site presence, reduced the duration of field surveys by 60 per cent, and improved overall monitoring. Additionally, time-lapse imaging was employed to continuously track construction progress, increasing monitoring efficiency by 40 per cent.

New four-lane tunnel opens in Dubai to reduce traffic congestion
New four-lane tunnel opens in Dubai to reduce traffic congestion

The National

time6 hours ago

  • The National

New four-lane tunnel opens in Dubai to reduce traffic congestion

An 800-metre tunnel with four lanes in each direction has opened in Dubai as part of a project to ease traffic flow in the city. The tunnel extends from the junction with Al Khail Road to the intersection with Sheikh Mohammed bin Zayed Road as part of the Umm Suqeim Street development project. The project is part of plans by the emirate's Roads and Transport Authority (RTA) to enhance traffic flow and upgrade road infrastructure in line with Dubai's sustained urban and population growth. 'The Umm Suqeim Street development project extends from the intersection with Al Khail Road to the intersection with Sheikh Mohammed bin Zayed Road, covering a distance of 4.6km," said Mattar Al Tayer, RTA director general, on Sunday. "The works included upgrading the intersection of Umm Suqeim Street with Al Barsha South Street, near Kings' School, where an 800-metre-long underpass with four lanes in each direction was constructed, in addition to a signalised surface-level intersection. "This development is considered one of the most important strategic projects for developing transverse east-west roads to enhance connectivity with vertical north-south roads. The completion of the project complements RTA's efforts to upgrade this corridor." The tunnel is part of plans to develop the Umm Suqeim-Al Qudra corridor, which extends from the intersection with Jumeirah Street to the junction with Emirates Road, spanning a total of 16km.

Dubai's RTA opens new tunnel to ease traffic, reduces travel time to 3.8 minutes
Dubai's RTA opens new tunnel to ease traffic, reduces travel time to 3.8 minutes

Al Etihad

time6 hours ago

  • Al Etihad

Dubai's RTA opens new tunnel to ease traffic, reduces travel time to 3.8 minutes

3 Aug 2025 13:20 DUBAI (WAM)Dubai's Roads and Transport Authority (RTA) has officially opened a new 800-metre tunnel with four lanes in each direction, designed to significantly improve traffic flow along Umm Suqeim tunnel forms a key part of the Umm Suqeim Street Development Project, which runs from the intersection with Al Khail Road to the junction with Sheikh Mohammed bin Zayed upgraded road network is expected to benefit more than one million residents across several major communities, including Al Barsha South 1, 2, and 3, Dubai Hills, Arjan, and Dubai Science Park. Mattar Al Tayer, Director General and Chairman of the Board of Executive Directors at RTA, said: "The project enhances connectivity between four strategic corridors in Dubai: Sheikh Zayed Road, Al Khail Road, Sheikh Mohammed bin Zayed Road, and Emirates Road."It increases the capacity of Umm Suqeim Street to 16,000 vehicles per hour in both directions, improves traffic flow, and reduces travel time between Sheikh Mohammed bin Zayed Road and Al Khail Road by 61% from 9.7 minutes to 3.8 minutes."Al Tayer also noted that RTA employed advanced smart technologies throughout the project. Drones equipped with artificial intelligence (AI) were used to collect and analyse construction data in real time, enhancing decision-making, boosting site efficiency, and reducing field survey time by 60%."Additionally, time-lapse imaging was employed to continuously track construction progress, increasing monitoring efficiency by 40%," he current development builds on earlier phases of the project. In 2013, RTA completed Phase I, which covered the section from Sheikh Zayed Road to Al Khail Road. This phase included the construction of two bridges, each comprising three lanes in both directions, the first crossing the eastern street parallel to Al Asayel Street, and the second crossing the western street parallel to First Al Khail phase also included the development of two signalised intersections at the intersections of Umm Suqeim Street with Al Asayel Street and First Al Khail Road, in addition to three pedestrian bridges along Umm Suqeim Street to ensure safe crossing between Al Quoz and Al Barsha areas. In 2020, RTA also completed a 500-metre bridge at the intersection of Umm Suqeim Street and the entrance to Dubai Hills and Al Barsha South, as part of infrastructure upgrades for Dubai Hills Mall. This bridge features four lanes in each direction, and handles up to 16,000 vehicles per hour-matching the capacity of the newly opened tunnel.

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into a world of global content with local flavor? Download Daily8 app today from your preferred app store and start exploring.
app-storeplay-store