
Posts falsely claim Ethiopian opposition parties held peace talks with ruling party
The headline of the post published on Facebook in Afaan Oromoo, one of Ethiopia's main languages, reads: 'Peace talks between OFC, OLF and PP parties has begun in Finfinnee.'
Image
Screenshot of the false post, taken on February 24, 2025
OFC and OLF stand for two opposition parties in the region: the Oromo Federalist Congress and the Oromo Liberation Front. PP stands for the country's ruling Prosperity Party.
Finfinnee is the Oromo name for Ethiopia's capital, Addis Ababa.
The post is accompanied by photos of Merara Gudina, Prime Minister Abiy Ahmed and Daud Ibsa, the leaders of the OFC, PP and OLF, respectively.
Similar claims were also shared here and here on Facebook.
Image
screenshots of the false posts, taken on February 24, 2025
Armed conflict
The Ethiopian army and the rebel Oromo Liberation Army (OLA) have been fighting each other in Oromia, Ethiopia's largest region, since 2018.
The armed conflict has caused severe humanitarian crises, according to the International Committee of the Red Cross (archived here).
Peace talks held in 2023 between the federal government and the OLA in Tanzania twice ended without agreement (archived here).
However, the claim that Oromo opposition parties held peace talks with the ruling Prosperity Party in Addis Ababa is false.
Joint conference
The opposition OLF and OFC parties, along with civil society organisations, conducted a four-day conference in Addis Ababa from February 19-22 to resolve the ongoing crisis in the Oromia region (archived here).
In a resolution written during the conference and sent to AFP Fact Check, the two parties announced a roadmap for the formation of a 'transitional government of national unity of Oromia'.
The resolution lists the 16 political and civil society organisations that participated in the conference. The ruling Prosperity Party was not on the list.
In addition, the leaders of the OLF and OFC confirmed to AFP Fact Check that the ruling party did not participate and that the opposition parties have not held separate peace talks with the ruling party, either.
'PP was not invited and did not participate in this joint conference. We also have not held any peace talks with the ruling party,' Lemi Gemechu, a spokesperson for OLF, told AFP Fact Check.
AFP Fact Check contacted the ruling PP for comment and will update this story when an answer is received.

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


AFP
3 days ago
- AFP
Compilation of clips shows dams in South Africa and Brazil, not Ethiopia's new Nile River project
Ethiopian Prime Minister Abiy Ahmed announced in July 2025 that the multi-billion-dollar Great Ethiopian Renaissance Dam (GERD) project would be inaugurated in September 2025. Following this announcement, a post published on Facebook claims to show footage of the dam in operation ahead of its inauguration. However, this is misleading; the video shows dams in South Africa and Brazil. The post contains a text overlay in Amharic, which translates to: 'This is happening in Meskrem 2018 E.C: the inauguration of the GERD dam and the start of oil production will take place together.' Meskerem 2018 in the Ethiopian calendar is equivalent to September 2025. Image Screenshot of the misleading post, taken on July 15, 2025 The post was originally published on TikTok and has been shared more than 110 times since it was reposted to Facebook on July 4, 2025. The 53-second video features a male news presenter reporting on an announcement made by Abiy in early July. Footage of various dam facilities display on the screen over the audio. 'Ethiopian Prime Minister Abiy Ahmed told members of parliament during the 42nd ordinary session that Ethiopia will begin marketing oil starting next September,' the presenter says. 'In addition, he confirmed that the Grand Ethiopian Renaissance Dam will be inaugurated this coming September.' The GERD On July 3, 2025, Abiy announced the completion of the multi-billion-dollar mega-dam on the Blue Nile and said it would be officially inaugurated in September 2025 (archived here). Launched in 2011 with a $4 billion budget, the GERD is considered Africa's largest hydroelectric project. The dam wall spans 1.8 kilometres (1.1 miles) and is 145 metres (475 feet) high. While Addis Ababa views the dam as essential to its national electrification program, it has been a source of tension with downstream countries Egypt and Sudan, who fear it could threaten their water supply from the Nile (archived here). However, the video does not show Ethiopia's new dam, set for inauguration in September. Gariep Dam AFP Fact Check used the video verification tool InVID-WeVerify to conduct reverse image searches on keyframes from the video and established that none of the clips featured show the GERD. Search results indicate that the first 12 seconds of the video show the Gariep Dam, located between the Free State and Eastern Cape provinces in South Africa. The footage was published on TikTok on January 30, 2021, with the English caption: 'Gariep Dam 30/01/2021, 114% Full.' The length of the video also exactly matches the footage in the misleading clip. Search results also led to similar videos here and here showing the Gariep Dam overflowing (archived here and here). AFP Fact Check further verified the dam's location by comparing features visible in the video with satellite imagery on Google Maps (archived here). The spillway, crest and surrounding greenery all align with features visible in the video. Image Screenshots of the misleading clip (top) and Google Maps showing Gariep Dam, taken on July 15, 2025 Pictures of the Gariep Dam wall on stock photo site Shutterstock also match the structure in the clip (archived here). Funil hydro plant Search results confirmed that the portion of the clip from 13 to 40 seconds features the Funil Hydroelectric Power Plant — a Brazilian dam located on the Paraíba do Sul River in Resende, Rio de Janeiro. The segment was uploaded to YouTube on October 6, 2023, with the title, 'Opening of the spillway gate at the Funil hydroelectric plant in Rio de Janeiro, Brazil' (archived here). It was also published on X on November 3, 2023, with the caption: 'Spillway gates at the Funil Hydroelectric Power Plant in Rio de Janeiro, Brazil, serve the crucial function of releasing surplus water from the reservoir (archived here).' Spillway gates at the Funil Hydroelectric Power Plant in Rio de Janeiro, Brazil, serve the crucial function of releasing surplus water from the reservoir — Science girl (@gunsnrosesgirl3) November 3, 2023 AFP Fact Check again corroborated these findings by comparing features visible in the video with satellite imagery on Google Maps. The dam's distinctive circular spillway gate, the large road in front of the spillway, and the surrounding forest all match the footage. Image Meanwhile, AFP file photos of the GERD taken during construction in 2022 show that it is structurally different from the dams seen in the Facebook clip.


AFP
10-07-2025
- AFP
Old video report misleadingly used to claim Ethiopian oil supplied to market
Ethiopian Prime Minister Abiy Ahmed recently announced that his country will supply domestically produced natural gas to the market from next September. A post shared on Facebook after this announcement claims that Ethiopian crude oil is currently being sold, with a video as evidence. However, this is misleading: the video includes a clip from a news report about oil testing from more than seven years ago and an unrelated clip about a sewage leak in the United States. The country has not made crude oil available to the market yet. The post in Amharic, published on Facebook on June 27, 2025, reads: 'Ethiopian oil has become available to the market'. Image Screenshot of the misleading post, taken on July 9, 2025 'Ethiopian oil production has been increased and made available to the market,' adds the post, which has been shared more than 240 times since. The post contains a six-second clip divided into two sections: the top half of the screen shows a news anchor speaking in Amharic while the bottom half shows thick black liquid bubbling out of the ground. On July 3, 2025, Ethiopian Prime Minister Abiy Ahmed announced that in September, Ethiopia will begin supplying domestically produced natural gas to the market for the first time in the country's history (archived here). However, the video does not show that Ethiopian oil has already been supplied to the market. Unrelated clips There have been no official announcements about Ethiopian oil being made available to the market. Prime Minister Abiy's recent announcement said that his country would supply natural gas to the market in September. AFP Fact Check used the video verification tool InVID-WeVerify to conduct reverse image searches on keyframes from the video. The search results for the footage of the news anchor established that it was originally published on the official channel of the Ethiopian Broadcasting Corporation back in June 2018 (archived here). The original video is over 29 minutes long and features an anchor presenting various news items, including a segment on Ethiopian crude oil production. Between the 50- and 56-second mark, the anchor says in Amharic: 'Ethiopian Prime Minister Abiy Ahmed announced that Ethiopia will begin testing oil production starting tomorrow.' The misleading clip was extracted from this portion of the broadcast. In July 2018, Ethiopia tested the production of crude oil in partnership with Chinese company Poly-GCL Petroleum Investments Limited from two reserves in the Ogaden Basin — the Kalub and Hilala fields in the eastern part of the country (archived here). Image Screenshots of the original video (left) and the misleading post, taken on July 9, 2025 Search results for the second clip revealed that it shows a sewage leak in the US, not oil in Ethiopia (archived here). AFP Fact Check previously debunked the clip in January 2024. Experts confirmed that visual clues indicated the liquid in the video was not oil.


AFP
08-07-2025
- AFP
Clips of unrelated pipelines falsely depicted as part of Ethiopian gas export project
The Ethiopian government recently shelved plans to pipe natural gas from the Ogaden Basin to Djibouti because of financial constraints and project delays. But posts circulating on Facebook claim to show the ongoing construction of Ethiopia's export pipeline. However, this is false: the video shows a compilation of unrelated clips, including footage from India and Australia. Construction on the planned Ogaden-Djibouti pipeline never started. An Amharic post published on Facebook and shared more than 480 times reads: 'Amazing Ethiopian pipeline that transports gas to the port.' Image Screenshot of the false post, taken on July 4, 2025 The post, published on June 27, 2025, includes a 30-second video that shows the construction of various pipelines and refineries while a male voice narrates in the background. 'Ethiopia is building a large gas pipeline that will transport gas from the Ogaden Basin for export,' the narrator says. Ogaden Basin is found in Ethiopia's Somali region and holds significant reserves of crude oil and natural gas. 'The gas pipeline is 767 kilometres long and connects the gas directly to the Red Sea for transport,' the video's narrator adds. 'The construction of the pipeline, which was interrupted several times in the past, has now been resumed at full capacity.' He further claims that the pipeline is being constructed by a Chinese company and will transport more than 12 billion cubic meters of natural gas annually. Similar posts were also shared here and here on Facebook. Ethiopian gas Ethiopia has been actively exploring oil and natural gas in partnership with Chinese companies. Early attempts were marred by tragedy when, in 2007, more than 65 Ethiopians and Chinese workers were killed by Ethiopian rebels from the Ogaden National Liberation Front (ONLF) at an oil field in the Ogaden Basin (archived here). In 2018, following the election of Prime Minister Abiy Ahmed, Ethiopia trialled the production of crude oil for the first time from two reserves in the Ogaden Basin — the Kalub and Hilala fields in the eastern part of the country (archived here). The exploration and production of both natural gas and crude oil in the Ogaden Basin have been carried out in partnership with the Chinese company Poly-GCL Petroleum Investment Limited. In 2019, Ethiopia and Djibouti signed a multi-billion dollar agreement to lay down a 760-kilometre-long natural gas pipeline from Kalub and Hilala to Djibouti Port (archived here). However, the video does not show this proposed project. Nonexistent pipelines Keyword searches reveal that the pipeline's construction never got off the ground. AFP Fact Check found a speech Abiy gave to parliament in early June 2025 when he said the country would begin gas production for domestic use in September (archived here). His announcement followed the May 2025 release of a 41-page report titled 'Ethiopian Energy Outlook 2025' in which the Ministry of Water and Energy confirmed that the government has cancelled the planned natural gas extraction in the Ogaden region and a pipeline project to Djibouti for export as liquefied natural gas (archived here). According to the report, the cancellation was a result of financial constraints and delays in project implementation as well as a shift toward domestic consumption. On June 28, 2025, local media reported that the decision to terminate the natural gas pipeline project was already taken in 2022 and only recently made public (archived here). Unrelated videos AFP Fact Check also used the video verification tool InVID-WeVerify to conduct reverse image searches on keyframes from the video. The search results included a link to an Instagram video showing the Arab Crude Oil Pipeline Project in India, involving a 489-kilometre pipeline connecting Mundra in Gujarat to the Barmer refinery in Rajasthan. It was posted by Megha Engineering and Infrastructures Ltd, the company responsible for constructing the pipeline (archived here). Further searches revealed part of the footage was also published by the same company on YouTube in October 2023 (archived here). AFP Fact Check matched screengrabs from the original Instagram video to frames from the clip in the false post. Image Screenshots of the orginal video (left) and the false post, taken on July 7, 2025 The search results further revealed that other parts of the false video were taken from footage of the 'Fortescue River Gas Pipeline Construction Project' published on YouTube in February 2015 (archived here). The project saw the construction of a 270 kilometre pipeline connecting the Dampier Bunbury Natural Gas Pipeline to TransAlta's Solomon Power Station in Western Australia (archived here). Image Screenshots of the original video from February 2015 (left) and the false post, taken on July 07, 2025 None of the images featured in the video support the claim that they show the construction of an Ethiopian gas pipeline.