
Sewage, garbage, dirty water: Theewaterskloof is in a mess after years of bad management
An 8% increase in the water tariff has since been passed, yet food and hospitality businesses have had to invest heavily in filtration systems or find alternative sources of water.
DA Councillor Piet Stander said the town used to have the best quality water in the Overberg, as it was gravity-fed from the perennial Olifants River in the adjacent mountains, to the reservoir. But Stander said lack of maintenance meant pipe breakages and leaks had not been fixed, so for the past four years, water had been pumped from the Sonderend River, which was polluted by upstream effluent and agricultural runoff, including pesticides. He said the cost of chemicals now needed to treat the water has exceeded what it would have cost to fix the pipes.
Riviersonderend is not the only town in the municipality in which the drinking water quality does not meet the minimum national standards.
Besides Riviersonderend, the municipality includes Caledon, Greyton, Genadendal, Tesselaarsdal, Botrivier, Villiersdorp, and Grabouw. Only Tesselaarsdal and Botriver have acceptable quality drinking water, according to the Department of Water and Sanitation's Integrated Regulatory Information System (IRIS). The rest are all failing the microbiological standards, having more faecal bacteria in the water than is allowed.
IRIS also shows that sewage treatment works in all eight towns are failing, and have been for years in most, releasing sewage that has not been properly treated into the streams and rivers in the area.
The Caledon sewage treatment works has just had a R56-million upgrade, paid for in this financial year. But there have been 32 high-level failures this year, with effluent spewed out with E. coli counts of more than double what is allowed, along with high levels of ammonia and other pollution indicators. A visit to the plant found that although new infrastructure and equipment was installed, only half of it appeared to be working. Of four aerators, only two were working, and of two clarifiers, only one was operational.
The landfill at Caledon was supposed to have been closed and rehabilitated years ago.Not only is it still in use, but the refuse dumped there is uncovered, with wind blowing plastic into the surrounding landscape.
The management of solid waste in Theewaterskloof is also problematic. The Caledon landfill, carved into the northern side of the Klein Swartberg mountain, is uncovered, and plastic waste is being blown across the landscape. It is also full. The municipality's Spatial Development Framework of 2023 states it should have been closed when a transfer station was completed in the 2020/21 financial year, and the landfill rehabilitated. The transfer station, from which waste is supposed to be taken to Karwyderskraal regional landfill site outside Hermanus, has been completed but is unused, with the paved road in the premises already needing repairs.
In Villiersdorp, a transfer station to take waste to Karwyderskraal was built, but has been stripped for use as building material in informal settlements. The Spatial Development Framework states the landfill has been closed and is to be rehabilitated, but as the transfer station is dysfunctional, the landfill, while officially closed, is still used. Residents still use it to dump rubble and garden refuse provided the road there has been graded and is passable. When it is not, they dump their rubbish in the bushes alongside the road. A resident, who asked not to be named, said household refuse is collected and taken to the Caledon landfill.
The crumbling pillars of municipal service are reflected in the lack of stability in municipal management. There have been four municipal managers in as many years since the municipal elections and the ousting of Danie Lubbe by the new coalition of the ANC, Patriotic Alliance (PA), EFF, and GOOD.
Lubbe was subsequently employed by Langeberg Municipality. The contrast between the two municipalities is stark. The Auditor-General doubts Theewaterskloof can be considered a going concern and racked up more than R300-million in irregular and unauthorised expenditure in 2023/24. But Langeberg received an unqualified audit and no irregular or unauthorised expenditure, and just R5,000 in fruitless and wasteful expenditure.
The ANC-led coalition, which was heavily reliant on GOOD joining in with its three seats in the 27-seat council, replaced Lubbe with Boy Manqoba Ngubo in June 2022. Manqoba Ngubo's position was finalised with a five-year contract in October that year, but he unexpectedly resigned five months later.
The ANC-led coalition then controversially appointed Wilfred Solomons-Johannnes ahead of a better-qualified candidate. Western Cape MEC for local government, Anton Bredell, challenged the appointment, and the high court duly ruled it was illegal. Solomons-Johannes stood down as municipal manager in June 2024. He remains in the municipality as director of community services, but in April was placed on suspension while R41-million in missing disaster relief funds for floods in September 2023 is investigated.
Reynold Stevens was then appointed in an acting position from July 2024 until replaced by Walter Hendricks in mid-February. Hendricks was officially appointed from his acting position on 30 May.
New municipal manager Walter Hendricks is the fourth municipal manager since Daniel Lubbe was ousted after the 2021 local government elections. Hendricks hopes to get the municipality back on an even financial keel so that municipal services can be improved.
Hendricks is frank about the challenges the municipality faces.
'We're in a mess, we don't have money,' Hendricks told GroundUp. 'The first thing we need to do is remain within the boundaries of the law.'
Besides the coffers being left empty, he said there were internal challenges with certain people appointed who 'don't add the kind of value you need'.
He said his aim was to focus on the municipality's core functions of water, electricity, roads and stormwater, refuse and waste water.
'Luckily, I have a mayor who has bought into that.'
He said he was working closely with provincial and National Treasury officials and master plans were in place.
Once Theewaterskloof was financially stable again, they could start looking at reinstituting facilities such as swimming pools in the towns, upgrading sports fields and improving libraries.
'We have to eat the elephant bit by bit.'
Hashtags

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


Daily Maverick
5 hours ago
- Daily Maverick
South Africa secures $40m grant to enhance nature-based climate resilience for vulnerable communities
A new defence against climate disasters in South Africa is in the pipeline, backed by a $40.1m (more than R700m) grant from the Green Climate Fund to assist in the country's climate change adaptation efforts. As South Africa battles against climate-intensified disaster risks, the country is now set to bolster its defences with a substantial grant of more than $40-million (over R700-million) from the Green Climate Fund (GCF) for an eight-year project that looks to enhance climate resilience for over five million vulnerable South Africans. This funding supports an eight-year nature-based project to reduce disaster risks, ' Scaling up Ecosystem-based Approaches to managing climate-intensified disaster risks in vulnerable regions of South Africa ', or more easily known as the Eco-DRR project, led by the South African National Biodiversity Institute (Sanbi). The project will take place across four climate-vulnerable district municipalities in Eastern Cape, Limpopo, Mpumalanga and North West provinces — and will apply to climate change adaptation responses across the country. Those living in areas most vulnerable to climate change impacts, such as floods, droughts, and wildfires, have suffered immensely in South Africa in recent years, facing a devastating cycle of climate-related disasters that have claimed lives, destroyed homes, and shattered livelihoods. In provinces like KwaZulu-Natal, catastrophic floods have become terrifyingly frequent. The 2022 floods in Durban resulted in hundreds of deaths, displaced tens of thousands of people as their informal and formal homes were washed away, and crippled essential infrastructure like roads, bridges, and water systems. This left already impoverished communities isolated, without access to food, schools or employment. Prolonged and severe droughts, particularly in the Western, Eastern, and Northern Cape, have threatened life and national food security. Water sources have dwindled, leading to critical shortages for both households and agriculture. Subsistence farmers have lost their crops and livestock, often their only source of income and sustenance, while commercial farms have faced massive economic losses, affecting farmworkers and the wider economy. At the same time, hotter and drier conditions have fuelled an increase in the frequency and intensity of wildfires, especially in the Western Cape. These fires have raged through informal and formal settlements built on the urban fringe, leaving thousands homeless. Beyond the destruction of property, entire communities have faced the trauma of displacement and the health impacts of smoke inhalation. The country's high levels of inequality mean that the poorest and most marginalised citizens, often living in poorly built housing on unsuitable land, bear the brunt of these impacts. Without proactive adaptation measures (taking action to prepare for and adjust to the current and projected impacts of climate change), development gains are continuously eroded, and the cycle of poverty is entrenched. What is the Eco-DRR project? This is part of what the Eco-DRR project looks to address. It is being managed by Sanbi, in partnership with the Department of Forestry, Fisheries and the Environment (DFFE) and the South African Local Government Association (Salga), and was officially ratified by the Green Climate Fund board on 1 July 2025 in Papua New Guinea. It is an eight-year project with an anticipated 20-year impact, aiming to directly benefit about 366,000 people and indirectly reach more than 5.1 million South Africans, particularly those vulnerable to floods, droughts, and wildfires. Sanbi CEO Shonisani Munzhedzi said: 'The role of biodiversity in South Africa's response to climate change is at the heart of this project.' Munzhedzi said healthy ecosystems acted as natural buffers against climate extremes, protecting lives, infrastructure and livelihoods — and this project represented a major step forward in climate adaptation financing for South Africa. The project's core objective is to scale up ecosystem-based approaches to manage climate-intensified disaster risks. This involves rehabilitating vulnerable catchments, supporting locally led adaptation and natural resource-based livelihoods, improving community-level disaster preparedness and response, and mainstreaming Eco-DRR considerations into asset management and maintenance, and settlement policy and planning. The biodiversity institute explained that by restoring and protecting critical ecosystems such as catchments, wetlands, and forests, the project would reduce communities' exposure to extreme weather events, enhance water security, and promote sustainable, nature-based livelihoods. It said the project would also empower local governments and communities through training and resources to lead disaster preparedness and climate adaptation efforts. Just looking at the Eastern Cape flooding events of June 2025, this is sorely needed, and it's needed at a local, community level to prevent the loss of lives. The project also seeks to develop the evidence base for Eco-DRR interventions and work with the South African government to implement these practices at scale. The exact intervention locations where these will be taking place will be determined during the operationalisation phase at the project's start, but so far the proposed project sites have been identified across four districts: Alfred Nzo District (Umzimvubu and Ntabankulu Local Municipalities) in the Eastern Cape. Sekhukune District (Makhuduthamaga Local Municipality) in Limpopo. Ehlanzeni District (Bushbuckridge Local Municipality) in Mpumalanga. Ngaka Modiri Molema District (Ramotshere Moiloa Municipality) in North West. Sanbi spokesperson Nontsikelelo Mpulo said that these project sites were identified through vulnerability assessments that combined climate science and stakeholder processes that were supported by the target provinces and district municipalities. Further site and activity refinement was expected to take place during the early stages of implementation through co-creation processes. Mpulo said the project would directly benefit people by enhancing their protection from floods, droughts and wildfires through a set of interventions that improved the health of ecosystems and ecological infrastructure, thus boosting their ability to buffer communities from these impacts. 'This will be complemented by activities that improve disaster preparedness and response in the target district municipalities, enabling communities to review and interpret early warning messages timeously,' she said. This project takes a three-pronged approach to building climate resilience: On-the-ground action: This looks at integrated landscape management to enhance the resilience of ecological infrastructure and climate-vulnerable communities in the four district municipalities. The goal is to strengthen ecological infrastructure like wetlands and forests, making them and the vulnerable communities that depend on them better able to withstand climate impacts across four district municipalities. Proactive safety measures: Transforming how communities prepare for and respond to climate-driven disasters. This involves practical steps to reduce the destructive impact of hazards on buildings, infrastructure, and especially on at-risk communities. S upporting long-term change: Concentrates on creating the right conditions for sustained investment from both government and private companies. This will be achieved by building a stronger evidence base and improving how knowledge about nature-based disaster reduction is shared and used. In a statement, Dion George, the Minister of Forestry, Fisheries and the Environment, said: 'The increasing frequency of floods, droughts and wildfires poses a serious threat to South Africa's communities, especially those in rural and peri-urban areas. 'This investment will support our efforts to strengthen ecological infrastructure, reduce disaster risk, and build adaptive capacity where it is needed most.' A strategic advantage in accessing global climate finance The issue of global climate finance to countries in the Global South remains a hot topic. While South Africa is a significant recipient of international climate funding, particularly through the Just Energy Transition Partnership, there remain several problems. This relates mainly to most climate finance in the country being loan heavy, insufficient, slow to arrive, and inadequately focused on the profound social adjustments required, raising fears of a transition that could leave the most vulnerable communities behind and deepen the nation's debt. The primary point of contention is that the majority of the climate finance offered to South Africa, including the initial $8.5-billion for the Just Energy Transition Partnership, consists of a lot of concessional and commercial loans, not grants. This has raised significant concerns that the transition is being financed by indebting the nation, which could exacerbate fiscal pressure on an already strained economy. Now Sanbi and the DFFE believe that the institute's accreditation as a Direct Access Entity of the Green Climate Fund, since 2016, gives South Africa a strategic advantage in accessing global climate finance. What this means is that resources are available to support local priorities and needs, build institutional capacity, and to ensure that climate change adaptation is driven by South Africans, for South Africans. 'This accreditation enables the South African National Biodiversity Institute to ensure that resources are channelled efficiently into projects that address national priorities. As a result, South Africa is better positioned to strengthen institutional capacity, advance climate change adaptation goals, and deliver tangible benefits to communities most affected by climate change,' the institute said in a statement. The Development Bank of Southern Africa and the institute are the only South African institutions accredited by the Green Climate Fund. 'This is a monumental achievement for South Africa and a testament to the South African National Biodiversity Institute's expertise as a Direct Access Entity to the Green Climate Fund,' said George. The minister said that as a Direct Access Entity, the institute had shown 'remarkable leadership' in securing this substantial funding, marking a milestone for both it and the nation. Project proposal development The Green Climate Fund is the world's largest dedicated climate fund and serves as an operating entity of the financial mechanism of the United Nations Framework Convention on Climate Change, supporting both the Paris Agreement and the global effort to help developing countries address climate change. It is funded primarily by voluntary contributions from national governments, with additional support from regional governments and cities. The main contributors are developed countries, but several developing countries also provide funding. Money is distributed from international climate funds to developing countries through accredited entities. The role of an accredited entity is to prepare and submit project proposals, disburse funding to projects, oversee implementation, monitor progress and report on project performance to the climate funds. Sanbi has been accredited with both the Adaptation Fund (established in 2001 in response to the Kyoto Protocol) since 2011, and the Green Climate Fund since 2016. In 2018, the institute initiated the development of a national pipeline of project proposals for the Green Climate Fund and invited Expressions of Interest from across the country. This led to the fund's approval of three concept notes, which are now being developed into comprehensive funding proposals. The projects currently in development are: Scaling up ecosystem-based approaches to managing climate-intensified disaster risks in vulnerable regions of South Africa (Eco-DRR): With a requested grant of $40-million, this project seeks to use nature-based solutions to mitigate the effects of extreme weather events, directly benefiting approximately 366,000 people and indirectly reaching about 5.1 million. Ecosystem-based approaches for transforming smallholder farming systems that are vulnerable to the impacts of climate change in South Africa (EbA-Farm): This $25-million project will use participatory, ecosystem-based methods to improve the resilience of 60,000 smallholder farmers and their communities across four provinces. Ecosystem-based adaptation for water security in South Africa (EbA-Water): Requesting $25-million, this initiative looks to safeguard 11 of the nation's strategic water source areas, ultimately affecting an estimated 17.1 million people. Sanbi said it was also actively working with various national and provincial partners to develop more projects for future consideration. DM


The South African
2 days ago
- The South African
Action taken against invasive hyacinth at Vaalkop Dam
Deputy Minister of Water and Sanitation, Sello Seitlholo, has committed to take decisive and sustained action to address the growing infestation of invasive alien vegetation at Vaalkop Dam in Rustenburg in the North West province. During a two-day oversight working visit from 27 to 28 June 2025, Seitlholo announced the establishment of a multi-stakeholder working group and committed to personally overseeing the complete removal of the infestation from the dam. 'I am taking personal responsibility to ensure that the infestation at Vaalkop Dam is eradicated,' Seitlholo said. The infestation, primarily caused by water hyacinth and Salvinia minima, has severely impacted the operations of the Vaalkop Water Treatment Works, posing serious threat to water abstraction, treatment capacity, and regional water supply. The Deputy Minister attributed the explosion of invasive weeds to a combination of factors, including heavy rainfall, which carried high concentrations of nutrients from upstream sources into the dam. These include discharges from wastewater treatment plants, agricultural runoff, urban drainage, and pollution from informal settlements and mining activities. 'Nutrients from bottom sediment recirculation have also added to the dam's ecological load. The combination of historically low water levels, the presence of invasive seeds, and nutrient flooding created ideal conditions for the aggressive spread of the aquatic weeds. The Deputy Minister also announced his intention to formally propose that water pollution be declared a national crisis, warning that South Africa can no longer afford to treat pollution as a localised or isolated problem. 'We cannot allow pollution and negligence to cripple our water systems any further. I will also be proposing that water pollution be declared a national crisis. It is time we recognise that this threat affects the health, economy, and future of our nation,' Seitlholo said. Declaring a national crisis, he said, is necessary to unlock the urgency, coordination, and resources required to protect South Africa's already stressed water systems. The Deputy Minister also issued a stern warning to municipalities that fail to meet their wastewater management responsibilities. 'Let me be very clear, municipalities that continue to pollute our rivers and dams with untreated waste are directly contributing to the destruction of our water resources. This negligence will not be tolerated,' Seitlholo warned. He announced that the department will intensify compliance monitoring, and where wrongdoing is found, 'there will be serious consequences.' The Deputy Minister's planned working group will bring together representatives from the Department of Water and Sanitation, Magalies Water, affected municipalities, environmental scientists, and other critical partners. 'The group will assess the scale of the infestation, recommend both immediate and long-term interventions, and oversee the implementation of recovery plans for the dam and surrounding systems,' Seitlholo said. He emphasised that this initiative is part of a broader departmental effort to strengthening environmental enforcement, restoring infrastructure resilience, and addressing the growing national threat posed by pollution and invasive species. Since assuming office nearly a year ago, Seitlholo has led numerous oversight inspections across the country, confronting issues of water pollution and infrastructure failure head-on. He has consistently called for accountability and improved service delivery. The Deputy Minister is expected to soon announce a set of coordinated and strategic national interventions to tackle the pollution of South Africa's water sources and restore the health of critical water ecosystems. Let us know by leaving a comment below, or send a WhatsApp to 060 011 021 1 Subscribe to The South African website's newsletters and follow us on WhatsApp, Facebook, X and Bluesky for the latest news.


The Citizen
5 days ago
- The Citizen
King Cetshwayo District outlines comprehensive bulk water plan
WATER woes will soon be a thing of the past in King Cetshwayo District Municipality (KCDM). This is according to KCDM spokesperson Thami Shangase, who says the municipality is implementing various strategic infrastructure projects. ALSO READ: Youth urged to rise to the call These include the construction of regional bulk infrastructure, refurbishment and upgrading of rudimentary water schemes, drilling and equipping of boreholes, especially in underserved areas, and replacement of old and inefficient generators to improve system reliability. He explained that these interventions are part of the municipality's broader strategy to provide reliable water services to all residents.'These efforts will significantly reduce and ultimately eliminate the need for water tanker services,' said Shangase. Various water projects under way 1. Nkandla Vutshini Bulk Water upgrade In Nkandla, Shangase says a permanent solution to water shortages is being delivered through the R99-million Nkandla Vutshini Bulk Water Upgrade Project, which is set to benefit wards 8, 10, 11, 12 and 13, impacting more than 3 890 households. 'The project is nearing completion, and we look forward to the water commissioning set for the end of July. The tankers previously serving parts of these Nkandla wards will be redirected to other areas still awaiting permanent access to clean, running water,' he said. 2. Phobane Water Purification Plant upgrade In uMlalazi Municipality, construction of a 10Ml clear water reservoir has been completed as part of the upgrade of the Phobane Water Purification Plant to 50Ml/day. 'This project is set to benefit wards 7, 9, 10, 11, 12, 13, 14, 16, 17, 21, 24, 26, 27 and 28, covering 4 964 households. Water commissioning is scheduled for December.' 3. KwaHlokohloko Bulk Water Supply upgrade He added that the Phobane Water initiative runs concurrently with the KwaHlokohloko Bulk Water Supply Upgrade from Thintumkhaba to Mpehlele, which was split into four major contracts with a combined project value of about R213-million. This upgraded pipeline will be served by the bigger Phobane Reservoir. 4. eShowe SSA1 Bulk Water Supply Project upgrade This upgrade, costing about R92-million, is currently under construction and set to improve supply to eShowe town and surrounding suburbs in wards 9, 10, 7,13, 14, 16 and 17 of uMlalazi. 5. KwaHlokohloko SSA1 Water Reticulation Zones 1A and 1C This project, valued at about R120-million, will benefit wards 9 and 10, serving the traditional areas of iNkosi Mpungose, iNkosi Zulu, iNkosi Mzimela and iNkosi Biyela. Shangase says progress is going well and it is now 38% complete. 'All these projects are expected to be commissioned by December, delivering clean, running water to all aforementioned wards of uMlalazi,' he said. 6. Greater Mthonjaneni SSA2 Bulk Water SupplyMUnder Mthonjaneni, this R96.2-million project is under way, consisting of of 2.5Ml and 2Ml reservoirs and pipelines. 7. Mthonjaneni SSA 2 Phase 1B2 This R40.3-million project consists of construction of pipelines, a 500kl reservoir and pump station. 8. Zimela Pump Station SSA2 Phase 1B2 'The R8.4-million [project] is now completed and commissioned. More water supply improvement is to be realised on the completion of a 2.5Ml reservoir in Nogajuka in Ward 6, which has just been provisionally re-awarded,' he said. Don't have the ZO app? Download it to your Android or Apple device here: HAVE YOUR SAY Like our Facebook page and follow us on Twitter. For news straight to your phone invite us: WhatsApp – 060 784 2695 Instagram – zululand_observer At Caxton, we employ humans to generate daily fresh news, not AI intervention. Happy reading!