logo
84 inquiries for projects at Grangemouth received by Government, MSPs told

84 inquiries for projects at Grangemouth received by Government, MSPs told

The Scottish Government has received 84 inquiries about projects for Grangemouth, MSPs have been told.
The refinery on the site was converted into an import terminal earlier this year, with the loss of more than 400 jobs.
The decision was announced last year by owner Petroineos, citing the financial unsustainability of the facility.
In response to the impending closure, the UK Government, the Scottish Government and Petroineos started work on what became known as Project Willow, a report which laid out the potential future of the site in areas such as sustainable aviation fuel.
Speaking at a meeting of the Economy and Fair Work Committee in the Scottish Parliament, Jan Robertson, the Grangemouth director for Scottish Enterprise, said: 'As of today, we've had 84 inquiries and we've been working through and triaging them.'
Ms Robertson told the committee there was a 'mixture of inquiries', including those interested in the site as well as some which 'have a good opportunity to become projects in the relatively near-term'.
'What I mean by that is the next three to four years,' she said.
'Our approach very much at the moment is working with those and working as closely and quickly as we can to make the progress that we want to see in Grangemouth.'
Speaking later in the session, Holyrood acting Net Zero Secretary Gillian Martin said the 'door's not closed' to companies and inquiries could still be made about working at Grangemouth, adding that Petroineos had also received approaches.
Ms Martin said she was hopeful for the future of Grangemouth.
'We could look back five years and start pointing fingers, but the most important thing is that in the last year – actually the last six months – Project Willow and the task force have moved things along in a way that's been swift, agile, focused,' she said.
'I am feeling so much more confident than I did this time last year in the prospects for that site.'
Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

Updated plans submitted for Dumbarton shopping centre redevelopment
Updated plans submitted for Dumbarton shopping centre redevelopment

Glasgow Times

time17 minutes ago

  • Glasgow Times

Updated plans submitted for Dumbarton shopping centre redevelopment

An application to improve the existing shopfronts at the Artizan Centre located on College Way, which was previously granted by the local planning department, will also see the creation of a new town square, an open space and play space. The plans are part of a wider masterplan to regenerate the area, which is being considered as a separate application in principle, which looks to redevelop the site and partially repurpose the existing buildings where possible. The masterplan seeks to create a new high-quality public realm which will be used for residential, retail, leisure/food and beverage purposes and provide a healthcare facility. It comes after West Dunbartonshire Council successfully applied to the UK Government's Levelling Up Fund to tackle the decline of Dumbarton Town Centre and deliver three key projects in the town, one of which is the Artizan Centre. Proposals for the initial stage of the masterplan were approved last November subject to conditions that meant that during the period of construction, all audible work and ancillary operations should be carried out between 8am and 6pm Monday to Friday and between 8am and 1pm on Sunday unless otherwise approved. This was applied 'to ensure that the development does not adversely affect the amenity of neighbouring properties by creating excessive noise and disturbance at unsocial hours.' The developer has now requested a change in these conditions that allows the hours of working to be amended, which will be presented to members of the planning committee next Wednesday. If approved, work can be carried out between the hours submitted on the approved schedule in addition to the standard working hours previously agreed. There will be no working on Sundays or public holidays and where changes to the programme are required, an amended schedule shall be submitted to the planning authority prior to the changes being made.

Renewables and fossil fuels not ‘either-or', says Reeves after Trump comments
Renewables and fossil fuels not ‘either-or', says Reeves after Trump comments

Powys County Times

time15 hours ago

  • Powys County Times

Renewables and fossil fuels not ‘either-or', says Reeves after Trump comments

Renewable and non-renewable energy sources are not an 'either-or', Rachel Reeves has said after Donald Trump described North Sea oil as a 'treasure chest'. On a visit to Lossiemouth on the North Sea coast in Moray, the Chancellor described oil and gas as 'incredibly important for the UK and our energy security'. Her appearance in Scotland followed a five-day visit from the US president, who called on the UK Government to 'incentivise the drillers, fast'. Mr Trump wrote on Truth Social: 'North Sea oil is a treasure chest for the United Kingdom. 'The taxes are so high, however, that it makes no sense.' Asked whether she would 'unlock' the 'treasure chest', Ms Reeves told the PA news agency: 'Oil and gas are incredibly important for the UK and our energy security. 'And oil and gas is going to play an important role in our energy mix for decades to come. 'It's why, alongside the private sector, we're investing in carbon capture and storage, which is absolutely essential for supporting energy intensive industries. 'But it's not either-or. 'At the same time, we're investing in clean homegrown energy, including at Berwick Bank in Scotland, which will create thousands of new jobs and power millions of homes. 'And that's what we need to do to make sure that our economy has this energy security that we need, that we bring down bills and bring more good jobs to Scotland.' Berwick Bank in the North Sea has this week received a green light from the Scottish Government. The proposed wind farm, off the coast of East Lothian, could add more than 4.1 gigawatts of capacity, which according to developer SSE Renewables is enough electricity to power more than six million homes annually. But Mr Trump criticised existing wind farms during his visit, when he said: 'When we go to Aberdeen, you'll see some of the ugliest windmills you've ever seen, the height of a 50-storey building.' Gesturing with his hands, he added: 'You can take 1,000 times more energy out of a hole in the ground this big.' Conservative shadow Scottish secretary Andrew Bowie has written to Prime Minister Sir Keir Starmer, calling for a review of policies affecting the oil and gas industry. 'As President Trump has said, the UK's 'very high' tax on oil and gas companies is a deterrent to investment,' he wrote. Following his flying visit to Aberdeenshire with President Trump earlier this week, I've written to the Prime Minister urging him to heed the calls of all those he met on the EPL, overturn ban on licenses, ensure a future for our region & secure Britain's energy 👇 — Andrew Bowie (@AndrewBowie_MP) August 1, 2025 'The extension of the energy profits levy (EPL), coupled with uncertainty around future licensing and investment signals, has created a climate of instability that threatens jobs, innovation and the region's economic resilience. 'President Donald Trump's remarks during your visit – calling Aberdeen the 'oil capital of Europe' and urging the UK to 'bring it back' – reflect a sentiment shared by many in the region. 'May I urge you to consider the president's call to 'incentivise' domestic production of hydrocarbons? 'Oil and gas still have a vital role to play in our energy mix and economic future; British people would rather see the UK benefit from domestic exploration and drilling than import more from Norway and Qatar.'

More than 300 car parking spaces at revamped Hairmyres station
More than 300 car parking spaces at revamped Hairmyres station

Daily Record

time16 hours ago

  • Daily Record

More than 300 car parking spaces at revamped Hairmyres station

Huge boost in South Lanarkshire with new park and ride unveiled Major new parking provision has been unveiled at a new £16m train station in South Lanarkshire and can accommodate more than 300 vehicles. ‌ Park and Ride facilities at the new Hairmyres rail station in East Kilbride have been completed. ‌ The north car park is now open, offering an extra 321 spaces and 23 motorcycle spaces in addition to the 194 spaces available in the south car park. ‌ The new £16 million train station was officially opened in May, with South Lanarkshire Council delivering a £7.2million interchange as part of the project. As well as the park and ride and bus facilities, the interchange includes traffic signal-controlled junctions to access the car parks. ‌ There will also be new active travel connections and cycle parking, as well as an upgraded junction nearby and a new pedestrian crossing on Eaglesham Road. The new station is 600 metres west of its original site and features modern waiting areas and step-free access to ensure a safe, comfortable and accessible journey for everyone. The whole project was a partnership between the council, Scottish Government, Transport Scotland, Network Rail, Strathclyde Partnership for Transport and the Glasgow City Region City Deal. He said: 'The completion of the north car park means even more accessibility to the new station for the people of East Kilbride and beyond. 'The whole project is a great example of partnership working. ‌ 'The passenger experience has been enhanced significantly by the improvements to Hairmyres and adds further to the provision of public transport in East Kilbride.'

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into a world of global content with local flavor? Download Daily8 app today from your preferred app store and start exploring.
app-storeplay-store