logo
Govt ramps up heatwave response

Govt ramps up heatwave response

New Straits Times17 hours ago
SHAH ALAM: The government has intensified emergency measures to address extreme heat and the prolonged dry weather, activating over 3,300 tube wells nationwide and conducting cloud seeding over drought-hit areas.
Deputy Prime Minister Datuk Seri Dr Ahmad Zahid Hamidi said the Fire and Rescue Department had been instructed to clean and operate the tube wells, especially in high-risk, fire-prone zones, as the Southwest Monsoon persists with lower rainfall and soaring temperatures.
"These wells were prepared earlier and have now been readied for operations," Zahid said after overseeing a cloud-seeding operation at the Subang Air Force Base yesterday.
"I've directed the fire department to carry out cleaning and fire prevention operations, particularly in areas prone to forest and peat fires when temperatures rise."
Zahid, who chairs the National Disaster Management Committee, said fast operational response was being coordinated through the fire department and district-level disaster management committees.
The monsoon season is expected to last until mid-October and authorities remain on high alert.
Zahid said the government had successfully carried out a cloud-seeding mission over the critically low Bukit Merah Dam in Gunung Semanggol, Perak, where heavy rainfall was reported just 45 minutes after the operation.
"The dam's water level had fallen to a critical 12.21 per cent, or 19.8 feet (6 metres), by July 31 due to prolonged dry conditions."
He added that the dam was important for padi irrigation, domestic supply, fisheries and flood mitigation.
He said the Meteorological Department (MetMalaysia) had identified suitable cloud formations inland from the Strait of Malacca, prompting the deployment of a Royal Malaysian Air Force C-130 Hercules aircraft.
The aircraft released 6,000 litres of sodium chloride solution into the clouds, resulting in the desired rainfall.
"This is a scientifically guided operation. With God's will, it brought the outcome we hoped for. We expect it will help ease pressure on local agriculture and water supply."
Zahid also voiced concern over rising temperatures nationwide, highlighting that several areas, including Bandar Baharu in Kedah, Selama in Perak, Temerloh in Pahang, Limbang in Sarawak, and Tenom and Pitas in Sabah had recorded extreme heat for three consecutive days.
MetMalaysia and the Drainage and Irrigation Department were monitoring other reservoir zones and potential hotspots for further intervention, he said.
"Our focus is on areas critical for domestic, agricultural and industrial water needs. We will not wait for formal requests. Action will be taken when ground monitoring shows water levels have dropped below 30 per cent."
Zahid said the Health Ministry would issue public advisories to limit heat exposure, especially for schoolchildren.
Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

Cloud seeding fails to lift dam levels, Kerian Irrigation still halted
Cloud seeding fails to lift dam levels, Kerian Irrigation still halted

New Straits Times

time10 hours ago

  • New Straits Times

Cloud seeding fails to lift dam levels, Kerian Irrigation still halted

IPOH: Irrigation supply to the Kerian Irrigation Scheme remains suspended as Bukit Merah Dam water levels stay at the cut-off point, despite heavy rainfall from a recent cloud seeding operation. State Infrastructure, Energy, Water, and Public Transport committee chairman Datuk Seri Mohammad Nizar Jamaluddin said the existing standard operating procedure (SOP) for irrigation from the dam's lake remains in effect, which sets the cut-off level at 20 feet (6.09 metres). "As of 8am today, the water level at the dam recorded an increase from 19.80 feet to 20.00 feet, and the dam's storage capacity also rose from 6.65 million cubic metres (12.2 per cent) to 7.25 million cubic metres (13.31 per cent)," Mohammad Nizar said in a statement today. "However, the dam's current status remains at the Irrigation Supply Cut-off Level as set in the existing SOP. "The increase in dam storage capacity helps somewhat to extend the availability of water for domestic use, but the supply for irrigation to the Kerian Irrigation Scheme still cannot be resumed," he added. The cloud-seeding operation, which was conducted around 12pm yesterday, led to effective rainfall in several catchment areas of the Bukit Merah Dam, with a noticeable increase in inflow at the Pondok Tanjung Station. The dam is located in Bagan Serai. The operation was led by the National Disaster Management Agency (Nadma) in collaboration with the Malaysian Meteorological Department (MetMalaysia), the Royal Malaysian Air Force, and other relevant agencies. Mohammad Nizar said the dam's catchment area has reached the irrigation cut-off level of 20.00 feet since July 22, and based on the dam's operational SOP, the water supply to paddy fields has been temporarily halted to prioritise raw water supply. Deputy Prime Minister Datuk Seri Dr Ahmad Zahid Hamidi, who joined the aerial operation alongside senior officials from Nadma and MetMalaysia, said the operation was triggered by severe water shortages affecting surrounding communities and agricultural zones.

Water levels at Bukit Merah Dam rise slightly after cloud seeding
Water levels at Bukit Merah Dam rise slightly after cloud seeding

The Star

time11 hours ago

  • The Star

Water levels at Bukit Merah Dam rise slightly after cloud seeding

IPOH: The recent cloud seeding operation conducted over Bukit Merah Dam has led to a slight improvement in water levels, but irrigation supply to the Kerian Irrigation Scheme remains suspended due to ongoing drought conditions. Perak water committee chairman Datuk Seri Mohammad Nizar Jamaluddin said the operation was carried out on Aug 4 following prolonged dry weather brought on by the Southwest Monsoon, which has severely affected catchment areas in Bagan Serai. 'Bukit Merah Dam had reached its irrigation supply cut-off level of 6.096m (20feet) on July 22 due to the lack of rainfall. 'According to standard operating procedures, irrigation supply was halted to prioritise raw water needs,' he said in a statement Tuesday (Aug 5). Mohammad Nizar said the cloud seeding exercise was led by the National Disaster Management Agency (Nadma), with support from the Malaysian Meteorological Department (MetMalaysia), Royal Malaysian Air Force (RMAF), and other related agencies. He said Deputy Prime Minister and National Disaster Committee chairman Datuk Seri Dr Ahmad Zahid Hamidi was present to observe the operation via an aerial monitoring flight over the dam. 'According to the Drainage and Irrigation Department (DID), the operation brought effective rainfall to several catchment areas between 12pm and 2pm, with increased water inflow recorded at the Pondok Tanjung Station from 3pm onwards. 'As of 8am on Aug 5, the water level at the dam rose from 6.035m to 6.096m. Its storage capacity also increased from 12.2% to 13.31%,' he said. He added that despite the improvement, the dam's status remains at the irrigation cut-off level. 'DID said the increased storage would help extend domestic water supply, but irrigation to padi fields under the Kerian scheme could not yet be resumed. 'The department will continue to closely monitor the situation and coordinate with relevant agencies to ensure water supply remains at a safe and sustainable level,' he added.

Nine dead, over 58,000 affected by floods in Laos
Nine dead, over 58,000 affected by floods in Laos

The Star

time11 hours ago

  • The Star

Nine dead, over 58,000 affected by floods in Laos

Laos vice president Pany Yathotou (third from right) distributing food and clothing to villagers affected by flooding in the Xiengkhouang province. - Vientiane Times/ANN JAKARTA: Heavy rains from the Southwest Monsoon and Typhoon Wipha have left nine people dead and four missing in Laos as of July 31, according to the Asean Coordinating Centre for Humanitarian Assistance (AHA Centre). To date, the disaster has impacted more than 58,000 people from 34,000 families across 10 provinces, the centre said in its weekly update. The damage and losses caused by the devastating effects of the severe weather conditions amount to about US$13 million, according to the Laos National Disaster Management Office (NDMO), said the AHA Centre. Acting as the secretariat of the National Committee for Disaster Management, the country's Social Welfare Department is leading a nationwide needs assessment in collaboration with the Inter-Agency Standing Committee to address urgent humanitarian needs and support recovery efforts. Furthermore, in response to a formal request from NDMO, three members of the Asean Emergency Response and Assessment Team (Asean-ERAT) have been deployed to assist national authorities. The members, experts in rapid assessment and information management, will provide their support to the affected areas for six days, until Aug 9. Over the past week, data from the Asean Specialised Meteorological Centre showed that heavy rainfall occurred across Indonesia, Laos, Malaysia, Myanmar, the Philippines and Vietnam. Tropical cyclones Bailu, Krosa and 14W, currently in the western Pacific Ocean, are forecast to head north-northwest, moving away from the Asean region, the AHA Centre added. - Bernama

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into a world of global content with local flavor? Download Daily8 app today from your preferred app store and start exploring.
app-storeplay-store