logo
#

Latest news with #AlstomInnoviaAPM300R

New KLIA Aerotrain praised for comfort and efficiency by passengers
New KLIA Aerotrain praised for comfort and efficiency by passengers

The Sun

time2 days ago

  • Business
  • The Sun

New KLIA Aerotrain praised for comfort and efficiency by passengers

SEPANG: Travellers using the newly upgraded KLIA Aerotrain at Kuala Lumpur International Airport (KLIA1) today commended its enhanced comfort, modern design, and operational efficiency. The service resumed full operations this morning following a RM456 million upgrade, part of the RM742 million KLIA transformation project to elevate the airport's status as a regional aviation hub. Syazwan Misbah, 32, noted the train's improved efficiency, stating, 'This new one is more efficient because it runs non-stop every two minutes and we don't have to wait long.' He added that the convenience of boarding within the satellite building eliminated the hassle of long walks previously required for bus transfers. Nazihah Abdullah, 35, highlighted the spaciousness and clearer information displays. 'The train space is a bit more spacious and has a clear display. The old one didn't have a display like this,' she said, praising the reduced waiting time and a journey duration of under three minutes. Dr Inglish Huang, a Taiwanese traveller and president of the International Korfball Federation (IKF) Asia, shared his delight at experiencing the relaunch. 'Previously, we had to rely on the bus transit and wait longer, but now we are lucky to have this. The air-conditioning is good, and it's very fast and efficient. Honestly, the ride feels almost romantic,' he remarked. The upgraded Aerotrain, featuring the Alstom Innovia APM 300R train set, can carry 270 passengers per three-car unit and travels at 56 km/h, cutting transit time between terminals to under three minutes. Advanced monitoring systems aim to minimise disruptions and boost passenger comfort.

Anwar tests revamped KLIA Aerotrain, praises performance
Anwar tests revamped KLIA Aerotrain, praises performance

The Star

time2 days ago

  • Business
  • The Star

Anwar tests revamped KLIA Aerotrain, praises performance

SEPANG: "Good… faster than before," was how Prime Minister Datuk Seri Anwar Ibrahim described his ride on the newly upgraded KLIA Aerotrain during a walkabout at Terminal 1 of Kuala Lumpur International Airport (KLIA1) on Tuesday (July 1). Anwar arrived at the terminal at 1pm, accompanied by Transport Minister Anthony Loke Siew Fook, Malaysia Airports Holdings Bhd (MAHB) managing director Datuk Mohd Izani Ghani and senior MAHB officials. The Prime Minister tested the enhanced Aerotrain service firsthand, travelling from the Contact Pier to the Satellite Building, where he received a briefing on the system's upgrades under MAHB's Airport Regeneration Plan. The driverless train service resumed full operations this morning following a RM456mil upgrade under MAHB's RM742mil transformation initiative aimed at future-proofing KLIA as a premier regional aviation hub. An iconic feature of KLIA since its opening in 1998, the Aerotrain now features Alstom Innovia APM 300R trainsets. Each three-car unit can accommodate up to 270 passengers and travel at speeds of up to 56km per hour, reducing travel time between the main terminal and the satellite terminal to under three minutes. With advanced condition monitoring systems, the new trains are designed to minimise service disruptions, enhance operational efficiency and improve passenger comfort. According to Mohd Izani, the upgraded system underwent six months of rigorous testing and commissioning by the Land Public Transport Agency (APAD) from January to June this year, including extensive technical and safety assessments. KLIA Terminal 1 currently records over 100,000 passenger movements daily. The Aerotrain remains a vital link, especially for international transit passengers connecting through the satellite terminal, which hosts most of the airport's long-haul carriers. With operations now fully restored, MAHB said the upgraded Aerotrain system will boost KLIA's readiness for growing passenger traffic ahead of Visit Malaysia Year 2026 and support its full recovery to pre-pandemic levels. – Bernama

PM Anwar tests revamped KLIA aerotrain, praises performance
PM Anwar tests revamped KLIA aerotrain, praises performance

New Straits Times

time2 days ago

  • Business
  • New Straits Times

PM Anwar tests revamped KLIA aerotrain, praises performance

SEPANG: "Good… faster than before," was how Prime Minister Datuk Seri Anwar Ibrahim described his ride on the newly upgraded KLIA Aerotrain during a walkabout at Terminal 1 of Kuala Lumpur International Airport (KLIA1) today. Anwar arrived at the terminal at 1 pm, accompanied by Transport Minister Anthony Loke Siew Fook, Malaysia Airports Holdings Bhd (MAHB) managing director Datuk Mohd Izani Ghani and senior MAHB officials. The Prime Minister tested the enhanced Aerotrain service firsthand, travelling from the Contact Pier to the Satellite Building, where he received a briefing on the system's upgrades under MAHB's Airport Regeneration Plan. The fully modernised, driverless train service resumed full operations this morning following a RM456 million upgrade under MAHB's RM742 million transformation initiative aimed at future-proofing KLIA as a premier regional aviation hub. An iconic feature of KLIA since its opening in 1998, the Aerotrain now features Alstom Innovia APM 300R trainsets. Each three-car unit can accommodate up to 270 passengers and travel at speeds of up to 56 kilometres per hour, reducing travel time between the main terminal and the satellite terminal to under three minutes. With advanced condition monitoring systems, the new trains are designed to minimise service disruptions, enhance operational efficiency and improve passenger comfort. According to Mohd Izani, the upgraded system underwent six months of rigorous testing and commissioning by the Land Public Transport Agency (APAD) from January to June this year, including extensive technical and safety assessments. KLIA Terminal 1 currently records over 100,000 passenger movements daily. The Aerotrain remains a vital link, especially for international transit passengers connecting through the satellite terminal, which hosts most of the airport's long-haul carriers. With operations now fully restored, MAHB said the upgraded Aerotrain system will boost KLIA's readiness for growing passenger traffic ahead of Visit Malaysia Year 2026 and support its full recovery to pre-pandemic levels. – BERNAMA

Revamped KLIA Aerotrain to resume service tomorrow, launch by PM Anwar
Revamped KLIA Aerotrain to resume service tomorrow, launch by PM Anwar

The Star

time2 days ago

  • Business
  • The Star

Revamped KLIA Aerotrain to resume service tomorrow, launch by PM Anwar

PUTRAJAYA: After nearly 28 months of suspension, Malaysia Airports Holdings Bhd (MAHB) is set to relaunch the fully modernised KLIA Aerotrain service tomorrow (July 1), marking a significant milestone in the country's airport transformation agenda. Prime Minister Datuk Seri Anwar Ibrahim is scheduled to officiate the launch at the Kuala Lumpur International Airport Terminal 1 (KLIA T1), where the upgraded automated people mover system will resume full operations at 10am. A long-standing icon of KLIA since 1998, the Aerotrain service has undergone a RM456mil overhaul to replace its ageing fleet and infrastructure under MAHB's RM742mil Airport Regeneration Plan, aimed at future-proofing one of the region's busiest aviation hubs. Now equipped with state-of-the-art Alstom Innovia APM 300R trainsets, the system features three-car driverless units capable of transporting up to 270 passengers at speeds of 56 kilometres per hour. Hence the train journey between the main terminal and the satellite building is now reduced to under three minutes. Each train is fitted with advanced condition monitoring systems to reduce service disruptions, boost operational efficiency and enhance passenger safety and comfort -- addressing past concerns over frequent breakdowns that plagued the ageing system. The new system underwent six months of rigorous testing and commissioning by the Land Public Transport Agency (Apad) between January and June 2025. MAHB managing director Datuk Mohd Izani Ghani was reported as saying that extensive technical and safety tests were implemented to ensure fault-free operations. Originally slated for completion in March 2025, the project faced delays due to global supply chain issues, system integration challenges and the complexity of installing a new driverless system while keeping KLIA operational. KLIA T1 currently manages more than 100,000 passenger movements daily, with the Aerotrain playing a pivotal role in maintaining smooth connectivity, especially for international transfer passengers. The satellite terminal houses many long-haul international carriers, making fast terminal transfers essential in reducing missed connections and ensuring seamless passenger journeys. With the Aerotrain now back online, the airport is better positioned to cater to rising passenger volumes, especially in anticipation of Visit Malaysia 2026 and KLIA's projected recovery to pre-pandemic traffic levels.- Bernama

Revamped KLIA Aerotrain to resume service tomorrow, launched by PM Anwar
Revamped KLIA Aerotrain to resume service tomorrow, launched by PM Anwar

Borneo Post

time2 days ago

  • Business
  • Borneo Post

Revamped KLIA Aerotrain to resume service tomorrow, launched by PM Anwar

A long-standing icon of KLIA since 1998, the Aerotrain service has undergone a RM456 million overhaul to replace its ageing fleet and infrastructure. – Bernama photo PUTRAJAYA (June 30): After nearly 28 months of suspension, Malaysia Airports Holdings Bhd (MAHB) is set to relaunch the fully modernised KLIA Aerotrain service tomorrow, marking a significant milestone in the country's airport transformation agenda. Prime Minister Datuk Seri Anwar Ibrahim is scheduled to officiate the launch at the Kuala Lumpur International Airport Terminal 1 (KLIA T1), where the upgraded automated people mover system will resume full operations at 10 am. A long-standing icon of KLIA since 1998, the Aerotrain service has undergone a RM456 million overhaul to replace its ageing fleet and infrastructure under MAHB's RM742 million Airport Regeneration Plan, aimed at future-proofing one of the region's busiest aviation hubs. Now equipped with state-of-the-art Alstom Innovia APM 300R trainsets, the system features three-car driverless units capable of transporting up to 270 passengers at speeds of 56 kilometres per hour. Hence the train journey between the main terminal and the satellite building is now reduced to under three minutes. Each train is fitted with advanced condition monitoring systems to reduce service disruptions, boost operational efficiency and enhance passenger safety and comfort — addressing past concerns over frequent breakdowns that plagued the ageing system. The new system underwent six months of rigorous testing and commissioning by the Land Public Transport Agency (APAD) between January and June 2025. MAHB managing director Datuk Mohd Izani Ghani was reported as saying that extensive technical and safety tests were implemented to ensure fault-free operations. Originally slated for completion in March 2025, the project faced delays due to global supply chain issues, system integration challenges and the complexity of installing a new driverless system while keeping KLIA operational. KLIA T1 currently manages more than 100,000 passenger movements daily, with the Aerotrain playing a pivotal role in maintaining smooth connectivity, especially for international transfer passengers. The satellite terminal houses many long-haul international carriers, making fast terminal transfers essential in reducing missed connections and ensuring seamless passenger journeys. With the Aerotrain now back online, the airport is better positioned to cater to rising passenger volumes, especially in anticipation of Visit Malaysia 2026 and KLIA's projected recovery to pre-pandemic traffic levels. – Bernama

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into a world of global content with local flavor? Download Daily8 app today from your preferred app store and start exploring.
app-storeplay-store