Latest news with #CaribooGoldProject
Yahoo
12-06-2025
- Business
- Yahoo
Osisko Development Files NI 43-101 Feasibility Study Technical Report for the Cariboo Gold Project
MONTREAL, June 11, 2025 (GLOBE NEWSWIRE) -- Osisko Development Corp. (NYSE: ODV, TSXV: ODV) ("Osisko Development" or the "Company") announces the filing of a technical report (the "Technical Report") prepared in accordance with National Instrument 43-101 – Standards of Disclosure for Mineral Projects ("NI 43-101") in respect of the feasibility study ("2025 FS") for its permitted, 100%-owned Cariboo Gold Project (the "Cariboo Gold Project"), located in central British Columbia, Canada. The Technical Report, titled "NI 43-101 Technical Report, Feasibility Study for the Cariboo Gold Project, District of Wells, British Columbia, Canada" and dated June 11, 2025 (with an effective date of April 25, 2025), was prepared in accordance with NI 43-101 by independent representatives of BBA Engineering Ltd., as lead independent consultant, and supported by other independent engineering firms, including InnovExplo Inc., Alius Mine Consulting Ltd., Falkirk Environmental Consultants Ltd., WSP Canada Inc., M.A. O'Kane Consultants Inc., Integrated Sustainability Consultants Ltd., Clean Energy Consulting Inc., and JDS Energy & Mining Inc., each of whom is a "qualified person" (within the meaning of NI 43-101) and independent of Osisko Development (within the meaning of Section 1.5 of NI 43-101). The Technical Report supports the disclosure made by the Company in its news release dated April 28, 2025 (titled "Osisko Development Announces Optimized Feasibility Study for Permitted Cariboo Gold Project with C$943 Million After-Tax NPV5% and 22.1% IRR at US$2,400/oz Base Case Gold Price; at US$3,300/oz Spot Gold C$2.1 Billion After-Tax NPV5% and 38.0% IRR") announcing the results of the 2025 FS. The Technical Report supersedes the technical report titled "NI 43-101 Technical Report, Feasibility Study for the Cariboo Gold Project, District of Wells, British Columbia" (as amended) dated January 12, 2023 (with an effective date of December 30, 2022), which should no longer be replied upon. The Technical Report is intended to be read as a whole, and sections should not be read or relied upon out of context. Reference should be made to the full text of the Technical Report, including all assumptions, qualifications and limitations therein, which is available electronically on SEDAR+ ( and on EDGAR ( under Osisko Development's issuer profile and on the Company's website at ABOUT OSISKO DEVELOPMENT CORP. Osisko Development Corp. is a continental North American gold development company focused on past-producing mining camps located in mining friendly jurisdictions with district scale potential. The Company's objective is to become an intermediate gold producer by advancing its flagship permitted 100%-owned Cariboo Gold Project, located in central B.C., Canada. Its project pipeline is complemented by the Tintic Project in the historic East Tintic mining district in Utah, U.S.A., and the San Antonio Gold Project in Sonora, Mexico—brownfield properties with significant exploration potential, extensive historical mining data, access to existing infrastructure and skilled labour. The Company's strategy is to develop attractive, long-life, socially and environmentally responsible mining assets, while minimizing exposure to development risk and growing mineral resources. For further information, visit our website at or contact: Sean Roosen Philip Rabenok Chairman and CEO Vice President, Investor Relations Email: sroosen@ Email: prabenok@ Tel: +1 (514) 940-0685 Tel: +1 (437) 423-3644 Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this news release. No stock exchange, securities commission or other regulatory authority has approved or disapproved the information contained herein.
Yahoo
12-06-2025
- Business
- Yahoo
Osisko Development Files NI 43-101 Feasibility Study Technical Report for the Cariboo Gold Project
MONTREAL, June 11, 2025 (GLOBE NEWSWIRE) -- Osisko Development Corp. (NYSE: ODV, TSXV: ODV) ("Osisko Development" or the "Company") announces the filing of a technical report (the "Technical Report") prepared in accordance with National Instrument 43-101 – Standards of Disclosure for Mineral Projects ("NI 43-101") in respect of the feasibility study ("2025 FS") for its permitted, 100%-owned Cariboo Gold Project (the "Cariboo Gold Project"), located in central British Columbia, Canada. The Technical Report, titled "NI 43-101 Technical Report, Feasibility Study for the Cariboo Gold Project, District of Wells, British Columbia, Canada" and dated June 11, 2025 (with an effective date of April 25, 2025), was prepared in accordance with NI 43-101 by independent representatives of BBA Engineering Ltd., as lead independent consultant, and supported by other independent engineering firms, including InnovExplo Inc., Alius Mine Consulting Ltd., Falkirk Environmental Consultants Ltd., WSP Canada Inc., M.A. O'Kane Consultants Inc., Integrated Sustainability Consultants Ltd., Clean Energy Consulting Inc., and JDS Energy & Mining Inc., each of whom is a "qualified person" (within the meaning of NI 43-101) and independent of Osisko Development (within the meaning of Section 1.5 of NI 43-101). The Technical Report supports the disclosure made by the Company in its news release dated April 28, 2025 (titled "Osisko Development Announces Optimized Feasibility Study for Permitted Cariboo Gold Project with C$943 Million After-Tax NPV5% and 22.1% IRR at US$2,400/oz Base Case Gold Price; at US$3,300/oz Spot Gold C$2.1 Billion After-Tax NPV5% and 38.0% IRR") announcing the results of the 2025 FS. The Technical Report supersedes the technical report titled "NI 43-101 Technical Report, Feasibility Study for the Cariboo Gold Project, District of Wells, British Columbia" (as amended) dated January 12, 2023 (with an effective date of December 30, 2022), which should no longer be replied upon. The Technical Report is intended to be read as a whole, and sections should not be read or relied upon out of context. Reference should be made to the full text of the Technical Report, including all assumptions, qualifications and limitations therein, which is available electronically on SEDAR+ ( and on EDGAR ( under Osisko Development's issuer profile and on the Company's website at ABOUT OSISKO DEVELOPMENT CORP. Osisko Development Corp. is a continental North American gold development company focused on past-producing mining camps located in mining friendly jurisdictions with district scale potential. The Company's objective is to become an intermediate gold producer by advancing its flagship permitted 100%-owned Cariboo Gold Project, located in central B.C., Canada. Its project pipeline is complemented by the Tintic Project in the historic East Tintic mining district in Utah, U.S.A., and the San Antonio Gold Project in Sonora, Mexico—brownfield properties with significant exploration potential, extensive historical mining data, access to existing infrastructure and skilled labour. The Company's strategy is to develop attractive, long-life, socially and environmentally responsible mining assets, while minimizing exposure to development risk and growing mineral resources. For further information, visit our website at or contact: Sean Roosen Philip Rabenok Chairman and CEO Vice President, Investor Relations Email: sroosen@ Email: prabenok@ Tel: +1 (514) 940-0685 Tel: +1 (437) 423-3644 Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this news release. No stock exchange, securities commission or other regulatory authority has approved or disapproved the information contained herein.
Yahoo
12-06-2025
- Business
- Yahoo
Osisko Development Files NI 43-101 Feasibility Study Technical Report for the Cariboo Gold Project
MONTREAL, June 11, 2025 (GLOBE NEWSWIRE) -- Osisko Development Corp. (NYSE: ODV, TSXV: ODV) ("Osisko Development" or the "Company") announces the filing of a technical report (the "Technical Report") prepared in accordance with National Instrument 43-101 – Standards of Disclosure for Mineral Projects ("NI 43-101") in respect of the feasibility study ("2025 FS") for its permitted, 100%-owned Cariboo Gold Project (the "Cariboo Gold Project"), located in central British Columbia, Canada. The Technical Report, titled "NI 43-101 Technical Report, Feasibility Study for the Cariboo Gold Project, District of Wells, British Columbia, Canada" and dated June 11, 2025 (with an effective date of April 25, 2025), was prepared in accordance with NI 43-101 by independent representatives of BBA Engineering Ltd., as lead independent consultant, and supported by other independent engineering firms, including InnovExplo Inc., Alius Mine Consulting Ltd., Falkirk Environmental Consultants Ltd., WSP Canada Inc., M.A. O'Kane Consultants Inc., Integrated Sustainability Consultants Ltd., Clean Energy Consulting Inc., and JDS Energy & Mining Inc., each of whom is a "qualified person" (within the meaning of NI 43-101) and independent of Osisko Development (within the meaning of Section 1.5 of NI 43-101). The Technical Report supports the disclosure made by the Company in its news release dated April 28, 2025 (titled "Osisko Development Announces Optimized Feasibility Study for Permitted Cariboo Gold Project with C$943 Million After-Tax NPV5% and 22.1% IRR at US$2,400/oz Base Case Gold Price; at US$3,300/oz Spot Gold C$2.1 Billion After-Tax NPV5% and 38.0% IRR") announcing the results of the 2025 FS. The Technical Report supersedes the technical report titled "NI 43-101 Technical Report, Feasibility Study for the Cariboo Gold Project, District of Wells, British Columbia" (as amended) dated January 12, 2023 (with an effective date of December 30, 2022), which should no longer be replied upon. The Technical Report is intended to be read as a whole, and sections should not be read or relied upon out of context. Reference should be made to the full text of the Technical Report, including all assumptions, qualifications and limitations therein, which is available electronically on SEDAR+ ( and on EDGAR ( under Osisko Development's issuer profile and on the Company's website at ABOUT OSISKO DEVELOPMENT CORP. Osisko Development Corp. is a continental North American gold development company focused on past-producing mining camps located in mining friendly jurisdictions with district scale potential. The Company's objective is to become an intermediate gold producer by advancing its flagship permitted 100%-owned Cariboo Gold Project, located in central B.C., Canada. Its project pipeline is complemented by the Tintic Project in the historic East Tintic mining district in Utah, U.S.A., and the San Antonio Gold Project in Sonora, Mexico—brownfield properties with significant exploration potential, extensive historical mining data, access to existing infrastructure and skilled labour. The Company's strategy is to develop attractive, long-life, socially and environmentally responsible mining assets, while minimizing exposure to development risk and growing mineral resources. For further information, visit our website at or contact: Sean Roosen Philip Rabenok Chairman and CEO Vice President, Investor Relations Email: sroosen@ Email: prabenok@ Tel: +1 (514) 940-0685 Tel: +1 (437) 423-3644 Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this news release. No stock exchange, securities commission or other regulatory authority has approved or disapproved the information contained in retrieving data Sign in to access your portfolio Error in retrieving data Error in retrieving data Error in retrieving data Error in retrieving data
Yahoo
03-06-2025
- Business
- Yahoo
Golden Cariboo Launches Ground Geophysical Survey to Delineate Critical Contacts and Potential Mineralization Adjacent the Halo Zone
VANCOUVER, BRITISH COLUMBIA - June 3, 2025 (NEWMEDIAWIRE) - Golden Cariboo Resources Ltd. (the "Company") (CSE:GCC) (OTC:GCCFF) (WKN:A402CQ) (FSE:3TZ) announces the commencement of a spontaneous or self-potential ("SP") geophysical survey adjacent the mineralized geological trend of the Halo and Main zones of its Quesnelle Gold Quartz Mine property (the "Property"), located about 4 km (2.5 miles) northeast of Hixon, British Columbia, Canada. This initiative is set to assist with identifying the near surface contact between metasedimentary lithologies, namely the argillite, and greenstone as well as pinpoint any fault offsets. Recent step-out drilling at the Halo zone confirms the Company's geological model of a strongly mineralized area associated with the lithological contact between argillite and greenstones (May 27, 2025 News Release). The SP geophysical method may assist with accurately identifying the near surface location and extent of this important contact as it is known for detecting subtle electrical potential differences in the ground which can be correlated to variations between rock lithology and may also correlate to mineralized zones. Golden Cariboo's experienced team has a proven track record with this technique. In its discovery year, the team successfully applied the SP method at Osisko's Bonanza Ledge Mine, delineating the near surface footprint of gold mineralization with remarkable precision. This success not only confirmed the method's effectiveness but also led to the identification of several additional targets, which subsequently became the focus of further exploration. This historical achievement underscores the reliability of this method in the Cariboo Gold District. The initiative reaffirms the Company's strategic commitment to integrating proven technology into every phase of its exploration program. Preliminary survey results will immediately be integrated into drilling and trenching campaigns, contributing to a robust geological model that will highlight priority target areas. About Golden Cariboo Resources Ltd. Golden Cariboo Resources Ltd. is rediscovering the Cariboo Gold Rush by proceeding with highly targeted drilling and trenching programs on its Quesnelle Gold Quartz Mine property which is bordered by Osisko Development, partly intertwined with them at the north end of the Cariboo Gold Project, and located along a favorable corridor adjacent to the Spanish and Eureka thrust faults over a 94,899 hectare (234,501 acre) area. Historically, over 101 placer gold creeks on the 90-kilometer (56-mile) trend from the Cariboo Hudson mine north to the Quesnelle Gold Quartz Mine property have recorded production and successful placer mining continues to this day. Golden Cariboo's Quesnelle Gold Quartz Mine property is 4 kilometers (2.5 miles) northeast of, and road accessible from, Hixon in central British Columbia. The Property includes the Quesnelle Quartz gold-silver deposit, which was discovered in 1865 in conjunction with placer mining activities. Hixon Creek, which dissects the old workings, is a placer creek which has seen small-scale placer production since the mid 1860s. For further information please contact: GOLDEN CARIBOO RESOURCES LTD "J. Frank Callaghan" J. Frank Callaghan, President & CEOTel: 604-669-6463 VISIT OUR WEBSITE FOR MORE LIKE AND FOLLOWInstagram, Facebook, X (Twitter), LinkedIn Neither the "CSE" Canadian Securities Exchange nor its Regulation Service Provider (as that term is defined in the policies of the Canadian Securities Exchange) accepts responsibility for the adequacy or accuracy of this release. Cautionary Statements: This news release contains statements which constitute "forward-looking information" within the meaning of applicable securities laws, including statements regarding the plans, intentions, beliefs and current expectations of the Company with respect to future business activities and plans of the Company. Forward-looking information is often identified by the words "may", "would", "could", "should", "will", "intend", "plan", "anticipate", "believe", "estimate", "expect" or similar expressions and includes information regarding; the expectation that the Company will receive all necessary exemptions and approvals to complete the Offering; the expectation that the Company will complete the Offering on the terms disclosed, or at all; the expectation that the proceeds will be used for property exploration and for general working capital; the Company's exploration plans with respect to its Quesnelle Gold Quartz Mine property; and the anticipated participation of the insider in the Offering. Such forward-looking statements are based on a number of assumptions of management, including, without limitation, that the Company will receive all necessary exemptions and approvals to complete the Offering; that the Company will complete the Offering on the terms disclosed, or at all; that the proceeds will be used for property exploration and for general working capital; that the Company will have the resources required to proceed with its exploration plans; that the Company will not run into regulatory or other barriers in carrying out its business plans; that the insider will participate in the Offering, on the terms and conditions and in the amount currently expected by management; and that the Company will be able to rely on the exemption from the formal valuation and minority shareholder approval requirements on the basis anticipated. Additionally, forward-looking information involve a variety of known and unknown risks, uncertainties and other factors which may cause the actual plans, intentions, activities, results, performance or achievements of the Company to be materially different from any future plans, intentions, activities, results, performance or achievements expressed or implied by such forward-looking statements. Such risks include, without limitation: that the Company will not receive the necessary exemptions and approvals to complete the Offering; that the Company will not complete the Offering on the terms disclosed, or at all; that the Company will be unable to use the proceeds for property exploration and for general working capital; that the Company may incur unanticipated costs; that the Company may not have the resources required to pursue its exploration plans; that the Company's operations could be adversely affected by possible future government legislation policies and controls or by changes in applicable laws and regulations; that the insider may not participate in the Offering on the terms and conditions and in the amount currently expected by management, or at all; and that the Company may not be able to rely on the exemption from the formal valuation and minority shareholder approval requirements on the basis currently expected. Such forward-looking information represents management's best judgment based on information currently available. No forward-looking statement can be guaranteed and actual future results may vary materially. Accordingly, readers are advised not to place undue reliance on forward-looking statements or information. Neither the Company nor any of its representatives make any representation or warranty, express or implied, as to the accuracy, sufficiency or completeness of the information in this news release. Neither the Company nor any of its representatives shall have any liability whatsoever, under contract, tort, trust or otherwise, to you or any person resulting from the use of the information in this news release by you or any of your representatives or for omissions from the information in this news release. The forward-looking statements herein speak only as of the date they were originally made. The Company has no intention and undertakes no obligation to update or revise any forward-looking statements, whether as a result of new information, future events or otherwise, except as required by law.
Yahoo
14-04-2025
- Business
- Yahoo
Osisko Development Announces Supplemental Listing of Warrants
MONTREAL, April 14, 2025 (GLOBE NEWSWIRE) -- Osisko Development Corp. (NYSE: ODV, TSXV: ODV) ("Osisko Development" or the "Company") is pleased to announce that its common share purchase warrants (the "Warrants") issued pursuant to private placements completed by the Company between October and November of 2024 will be listed for trading on the TSX Venture Exchange (the "TSXV") under the symbol " The Warrants are expected to be listed for trading on the TSXV effective as of the opening of markets on April 17, 2025. An aggregate of 51,109,776 Warrants will be listed on the TSXV, which were issued pursuant to (i) a non-brokered private placement of units of the Company that closed in two tranches on October 1, 2024, and October 11, 2024, and (ii) a brokered private placement of units of the Company that closed on November 12, 2024. The Warrants are governed by the terms of a warrant indenture dated October 1, 2024, as amended and supplemented on October 11, 2024, and further amended and supplemented on November 12, 2024, between the Company and TSX Trust Company, as warrant agent (the "Warrant Indenture"). Each Warrant entitles the holder thereof to purchase one common share of the Company (each, a "Common Share") at an exercise price of US$3.00 per Common Share on or prior to October 1, 2029. The Warrants will be trading on the TSXV in U.S. dollars. A copy of the Warrant Indenture is available on SEDAR+ ( under Osisko Development's issuer profile. The Company also anticipates listing the Warrants on the New York Stock Exchange (the "NYSE") in due course, subject to satisfying certain regulatory conditions and requirements in connection thereof. This news release does not constitute an offer to sell or a solicitation of an offer to buy any securities of the Company. ABOUT OSISKO DEVELOPMENT CORP. Osisko Development Corp. is a North American gold development company focused on past-producing mining camps located in mining friendly jurisdictions with district scale potential. The Company's objective is to become an intermediate gold producer by advancing its flagship fully permitted 100%-owned Cariboo Gold Project, located in central B.C., Canada. Its project pipeline is complemented by the Tintic Project in the historic East Tintic mining district in Utah, U.S.A., and the San Antonio Gold Project in Sonora, Mexico—brownfield properties with significant exploration potential, extensive historical mining data, access to existing infrastructure and skilled labour. The Company's strategy is to develop attractive, long-life, socially and environmentally responsible mining assets, while minimizing exposure to development risk and growing mineral resources. For further information, visit our website at or contact: Sean Roosen Philip Rabenok Chairman and CEO Vice President, Investor Relations Email: sroosen@ Email: prabenok@ Tel: +1 (514) 940-0685 Tel: +1 (437) 423-3644 CAUTION REGARDING FORWARD LOOKING STATEMENTS All statements, other than statements of historical fact, contained in this news release including, but not limited to, those which are discussed under the "About Osisko Development Corp." paragraph which essentially describes the Corporation's outlook and objectives as well as statements relating to the expectation to list the Warrants on the TSXV and/or the NYSE (and the timing thereof) constitute "forward-looking information" or "forward-looking statements" within the meaning of certain securities laws, and are based on expectations, estimates and projections as of the time of this press release. Forward-looking statements are necessarily based upon a number of estimates and assumptions that, while considered reasonable by the Corporation as of the time of such statements, are inherently subject to significant business, economic and competitive uncertainties and contingencies. These estimates and assumptions may prove to be incorrect. Moreover, these forward-looking statements were based upon various underlying factors and assumptions, including the current conditions and expected future developments, results of operation outcomes of the Corporation's mineral projects, timing to advance mineral projects, the Corporation's business prospects and opportunities and estimates of the operational and financial performance, the ability and timing to obtain additional financing, if needed, and are not guarantees of future performance. Forward-looking information and statements are subject to known or unknown risks and uncertainties that may cause actual results, performance and achievements of the Corporation, its projects or industry result to differ materially from those anticipated or implied in the forward-looking information and statements. These statements reflect the Corporation's current expectations regarding future events, performance and results and speak only as of the date of this release. Risk factors that could cause actual results or events to differ materially from current expectations include, among others the ability and timing of the listing of the Warrants on the TSXV and the NYSE, successful implementation its strategic initiatives and whether such strategic initiatives will yield the expected benefits, the availability of financing or financing on favourable terms for the Corporation, the impact of inflation on costs, the risks of obtaining the necessary permits, the operating performance of the Corporation's assets and businesses, competitive factors in the gold mining and production industry, changes in laws and regulations affecting the Corporation's businesses, political and social acceptability risk, environmental regulation risk, currency and exchange rate risk, technological developments, the impacts of any health crises and pandemics and the governments' responses thereto, and general economic conditions, as well as earnings, capital expenditure, cash flow and capital structure risks and general business risks. For a more detailed discussion of such risks and other factors that could cause actual results to differ materially from those expressed or implied by such forward-looking statements, refer to the Corporation's filings with Canadian and United States securities regulators, including the Corporation's most recent annual information form, available on SEDAR+ at and on the SEC's website at The Corporation disclaims any intention or obligation to update or revise any forward-looking statements or to explain any material difference between subsequent actual events and such forward-looking statements, except to the extent required by applicable law. Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this news release. No stock exchange, securities commission or other regulatory authority has approved or disapproved the information contained herein.