logo
#

Latest news with #KarthikMurgod

Anchatgeri Oni road in disrepair despite years of complaints
Anchatgeri Oni road in disrepair despite years of complaints

Time of India

time28-05-2025

  • General
  • Time of India

Anchatgeri Oni road in disrepair despite years of complaints

Hubballi: Anchatgeri Oni Road, one of the busiest roads near Janata Bazaar in HDMC Ward No. 65, remains in poor condition. It was dug up for underground drainage and water pipeline works. The condition of the road worsened due to the recent rains. Despite repeated complaints by locals, no permanent solution has been provided so far. According to sources, Anchatgeri Oni is located in the heart of the city. Families have lived there for many years. There are about 50 houses on this road. It connects Tadapatri Gali, Dajiban Peth, and many other roads. The road is always busy and there are many temples on the stretch. There have been incidents of motorists getting injured due to stagnant water in the potholes. Roads that were damaged in last year's monsoon have not yet been repaired. This year, motorists complain that the problem has risen again due to untimely rains. Locals demand the construction of a permanent CC road. Work on the UGD started six months ago. Road has been dug to install the drinking water pipeline. The road from Janata Bazaar to Tadapatri Gali deteriorated due to the recent rainfall. by Taboola by Taboola Sponsored Links Sponsored Links Promoted Links Promoted Links You May Like Villa For Sale in Dubai Might Surprise You Villas in Dubai | Search ads Learn More Undo Because of various reasons, the road construction was also delayed. Nagendra Habib, a resident of Anchatgeri Oni, told TOI that it has been six months since the road was dug up. Despite several requests to HDMC, no action was taken to repair it. After many complaints, patch-up work is ongoing but not providing a permanent solution. A CC road should be constructed soon, he demanded. Karthik Murgod, another Hubballi local, said that due to the lack of quality roads, the problem recurs every year, leading to hardship for commuters. Due to a lack of coordination between various departments, including Hescom and LT company, the roads are being dug up again and again, to install drinking water pipes, sewage pipes, and cables. The road should be constructed soon, he urged. Sunitha Burbure, corporator of HDMC Ward No. 65, told that the UGD work was carried out and later the drinking water pipeline was installed. Earlier, the road was repaired, however, due to various reasons, the CC road work was delayed. The cost of constructiong a CC Road is estimated at around Rs 15 lakh, and the road will be constructed soon, she assured. Vijay Kumar, HDMC's superintending engineer, said that a tender worth Rs 1.13 crore was called to close potholes in Hubballi South Zone. A total of Rs 2.81 crore will be spent to close potholes in North Zone, and Rs 1.82 crore in Dharwad Zone. Most of the work in Dharwad Zone was completed, he said.

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into a world of global content with local flavor? Download Daily8 app today from your preferred app store and start exploring.
app-storeplay-store