logo
#

Latest news with #MRE

Getchell Gold Corp. Commences Drill Program at Fondaway Canyon, Nevada
Getchell Gold Corp. Commences Drill Program at Fondaway Canyon, Nevada

Cision Canada

time5 hours ago

  • Business
  • Cision Canada

Getchell Gold Corp. Commences Drill Program at Fondaway Canyon, Nevada

VANCOUVER, BC, July 23, 2025 /CNW/ - Getchell Gold Corp. (CSE: GTCH) (OTCQB: GGLDF) (FWB: GGA1) ("Getchell" or the"Company") is pleased to announce that it has commenced the 2025 drill program at the Company's 100% owned Fondaway Canyon gold project (" Project") in Nevada. Key Highlights Large gold mineral resource Robust preliminary economic assessment Mineralization open for expansion 10-hole 3,000m (10,000 ft) drill program Designed to extend gold mineralization and increase mineral resource Fondaway Canyon The Project is located 140 kilometers ("km") (87 miles) northeast of Reno, and 58 km (36 miles) northeast of Fallon, Nevada. The Project covers a total claim area of 4,623 acres (1,871 hectares) and extends 7 km east-west encompassing the entirety of the Fondaway Canyon gold corridor. Moreover, the extent of the claim package offers ample area to support resource growth and the infrastructure required for future development. The Project contains a large mineral resource (news release dated September 11, 2024) comprising an Indicated Mineral Resource of 13.5 million tonnes at an average grade of 1.49 g/t Au, totaling 648,000 ounces of gold and an Inferred Mineral Resource estimated at 44.8 million tonnes at 1.16 g/t Au, amounting to 1,670,100 ounces of gold ("MRE"). Notably, gold mineralization starts at surface and remains open in most directions for further expansion. Following the MRE, a positive Preliminary Economic Assessment ("PEA") on the Project was completed and filed (news release dated February 7, 2025). The PEA outlined an open-pit mining operation coupled with a conventional 8,000 tonne per day milling process, projecting an initial mine life of approximately 10.5 years. The economic analysis highlighted robust project economics, with a pre-tax Net Present Value ("NPV") of US$ 546 million and 51.2% Internal Rate of Return ("IRR"), and after-tax NPV of US$ 474 million and 46.7% IRR, at a conservative 10% discount and gold price of US$ 2,250 per ounce. 2025 Drill Program Given that the mineral resource remains open in most directions, an initial 10-hole 3,000-metre (10,000 foot) drill program has been designed to further extend the mineralization, along strike and dip (Fig. 1), with the intent to increase the mineral resource, enlarge the open pit model, and substantially enhance the Project's overall value. For the first series of drill holes, the drill will be stationed in the Colorado Pit (Fig. 1) designed to expand the mineralization up-dip to the northeast, then progressing to test the northwestern strike extent, with the balance of the drilling designed to expand the mineralization down dip to the southwest (highlighted in Figure 2). Private Placement of Units The Company announces that it has issued an additional 1,000,000 units pursuant to its previously announced private placement financing of units (" Units") at a price of $0.20 per Unit. The additional subscription was not included in the original closing due to an administrative error. Each Unit is comprised of one common share of the Company and one-half of one common share purchase warrant. Each whole warrant is exercisable into one common share of the Company at an exercise price of $0.30 per share until July 22, 2028. Together with this additional subscription, the Company raised an aggregate of $4,200,000 under the private placement (the " Offering"), and the Company intends to use the proceeds of the Offering to spearhead the 2025 exploration program at the Fondaway Canyon gold project, as set out in greater detail in the Company's news release dated May 26, 2025. The additional securities issued under the Offering are subject to a four month hold period, expiring on November 23, 2025, in accordance with applicable Canadian securities laws." Notes on the PEA The PEA is preliminary in nature, includes Inferred Mineral Resources that are considered too speculative geologically to have economic considerations applied to them that would enable them to be categorized as Mineral Reserves, and there is no certainty that PEA results will be realized. Mineral Resources are not Mineral Reserves and do not have demonstrated economic viability. All amounts are in United States dollars unless otherwise specified. Base case parameters assume a gold price of $2,250 per ounce. NPV is calculated as of the commencement of construction and excludes all pre-construction costs. All figures are displayed on a 100% ownership basis. (1) Operating costs consist of mining costs, processing costs and mine site G&A. (2) Cash costs consist of operating costs plus treatment and refining charges and royalties. The PEA was prepared by Forte Dynamics Inc., of Fort Collins, Colorado ("Forte Dynamics") as the lead consultant in accordance with National Instrument 43-101 - Standards of Disclosure for Mineral Projects ("NI 43-101"). Forte Dynamics was the lead study manager for mine planning, design parameters, and operating and capital cost estimates. The PEA was supported by Forte Analytical Inc. (metallurgical studies, process design, process facilities, and plant site infrastructure) and APEX Geoscience Ltd. (mineral resource estimate). The effective date of the PEA is January 15, 2025, and a technical report titled "The Preliminary Economic Assessment of the Getchell Gold Corp. Fondaway Canyon Project, Nevada, USA" has been filed on the System for Electronic Document Analysis and Retrieval (SEDAR). Notes on the Mineral Resource Estimate: Mineral Resources, which are not Mineral Reserves, do not have demonstrated economic viability. There has been insufficient exploration to define the Inferred Resources tabulated above as an Indicated or Measured Mineral Resource; however, it is reasonably expected that the majority of the Inferred Mineral Resources could be upgraded to Indicated Mineral Resources with continued exploration. There is no guarantee that any part of the Mineral Resources discussed herein will be converted into a Mineral Reserve in the future. The estimate of Mineral Resources may be materially affected by environmental, permitting, legal, marketing, or other relevant issues. The Mineral Resources herein were estimated using the Canadian Institute of Mining, Metallurgy and Petroleum standards on mineral resources and reserves, definitions, and guidelines prepared by the CIM standing committee on reserve definitions and adopted by the CIM council (CIM 2014 and 2019). The Mineral Resources Estimate is underpinned by data from 527 reverse circulation and diamond drillholes totaling 55,870m of drilling that intersected the mineralized domains. The mineral resource is reported at a lower cut-off of 0.3 g/t Au for the conceptual open pit and 1.75 g/t Au for the conceptual underground extraction scenario. The lower cut-off grades and potential mining scenarios were calculated using the following parameters: mining cost = US$2.70/t (open pit); G&A = US$2.00/t; processing cost = US$15.00/t; recoveries = 92%, gold price = US$1,950.00/oz; royalties = 1%; and minimum mining widths = 1.5 metres (underground) in order to meet the requirement that the reported Mineral Resources show "reasonable prospects for eventual economic extraction". A density of 2.74 g/cm3 was used for the mineralized zones. The author is not aware of any known environmental, permitting, legal, title-related, taxation, socio-political or marketing issues or any other relevant issue not reported in the technical report that could materially affect the mineral resource estimate. The Qualified Persons The independent and qualified person for the mineral resource estimate, as defined by NI 43-101, is Michael Dufresne, from APEX Geoscience Ltd. The qualified person overseeing the minable resource estimate used for the economic analysis is Jonathan R. Heiner, SME-RM, from Forte Dynamics, Inc. The qualified person overseeing the metallurgical testing and mineral processing is Deepak Malhotra, SME-RM, from Forte Dynamics, Inc. The qualified person overseeing the overall Preliminary Assessment and the economic analysis is Donald E. Hulse, SME-RM, from Forte Dynamics, Inc. The Qualified Person (as defined in NI 43-101) who reviewed and approved the scientific and technical information in the news release is Patrick McLaughlin, Senior Project Manager at Getchell Gold Corp. and is non-independent. About Getchell Gold Corp. The Company is a Nevada focused gold exploration company trading on the CSE: GTCH, OTCQB: GGLDF, and FWB: GGA1. Getchell Gold Corp. is primarily directing its efforts on its most advanced stage asset, Fondaway Canyon, a past gold producer with a large mineral resource estimate and recently published Preliminary Economic Assessment. The Canadian Securities Exchange has not reviewed this press release and does not accept responsibility for the adequacy or accuracy of this news release. Certain information contained herein constitutes "forward-looking information" under Canadian securities legislation. Forward-looking information includes, but is not limited to, statements with respect to the drill program, the mineralization extent and results, including statements respecting the ability of Getchell to extend the Project's gold mineralization and increase the mineral resource. Generally, forward-looking information can be identified by the use of forward-looking terminology such as "will" or variations of such words and phrases or statements that certain actions, events or results "will" occur. Forward-looking statements are based on the opinions and estimates of management as of the date such statements are made, and they are subject to known and unknown risks, uncertainties and other factors that may cause the actual results to be materially different from those expressed or implied by such forward-looking statements or forward-looking information. Although management of Getchell have attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking statements or forward-looking information, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that such statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements and forward-looking information. The Company will not update any forward-looking statements or forward-looking information that are incorporated by reference herein, except as required by applicable securities laws. SOURCE Getchell Gold Corp.

Osisko Metals Gaspé Copper Project Intersects 645 Metres Averaging 0.28% Cu
Osisko Metals Gaspé Copper Project Intersects 645 Metres Averaging 0.28% Cu

Hamilton Spectator

timea day ago

  • Business
  • Hamilton Spectator

Osisko Metals Gaspé Copper Project Intersects 645 Metres Averaging 0.28% Cu

MONTREAL, July 22, 2025 (GLOBE NEWSWIRE) — Osisko Metals Incorporated (the 'Company' or 'Osisko Metals') ( TSX-V: OM ; OTCQX: OMZNF ; FRANKFURT: 0B51 ) is pleased to announce new drill results from the Gaspé Copper Project, located in the Gaspé Peninsula of Eastern Québec. Osisko Metals Chief Executive Officer Robert Wares commented: ' These new results underscore the overall large-scale potential of mineralization at Gaspé Copper, with drill hole 1082 cutting 853 metres of continuous mineralization, including the bottom 424 metres being located immediately below and outside the 2024 MRE model. Furthermore, drill hole 1088 intersected new mineralization 80 metres southwest of the 2024 MRE model, emphasizing the excellent potential for increasing the size of the known deposit at depth and to the south. ' Significant new analytical results are presented below (see Table 1) and include 35 mineralized intercepts from ten drill holes. Infill intercepts are all located inside the 2024 Mineral Resource Estimate model ('MRE', see November 14, 2024 news release ), and are focused on upgrading inferred mineral resources to measured or indicated categories, as applicable. Expansion intercepts are all located outside the 2024 MRE model and may potentially lead to additional resources that will be classified appropriately within the next MRE update. Some of the reported intercepts have contiguous shallower infill as well as deeper expansion (noted on Table 1 below as 'Both**'). Maps showing hole locations are available at . Highlights: Table 1: Infill and Expansion Drilling Results * Please see explanatory notes below on copper equivalent values and Quality Assurance / Quality Control. ** 'Both' indicates these drill holes have contiguous shallower infill as well as deeper expansion intercepts. Discussion Drill hole 30-0974 was an extension of a shallow (300 m) hole drilled in 2019, located near the southwestern margin of the 2024 MRE model. It returned 295.5 metres averaging 0.29% Cu and 1.88 g/t Ag (infill) followed by a second intercept of 351.2 metres averaging 0.20% Cu and 1.72 g/t Ag (expansion) and a third deeper intercept of 48.0 metres averaging 0.32% Cu and 2.00 g/t Ag (expansion), extending mineralization to a vertical depth of 780 metres. Drill hole 30-1082, located on top of Copper Mountain near the central part of the 2024 MRE model, intersected 48.0 metres averaging 0.19% Cu and 1.46 g/t Ag (infill), followed by a second intercept of 147.5 metres averaging 0.19% Cu and 1.86 g/t Ag (infill), followed by a third deeper intercept of 853.5 metres averaging 0.20% Cu, 1.43 g/t Ag and 0.023% Mo. The latter incudes an expansion lower intercept, below the base of the 2024 MRE model, of 424.0 metres averaging 0.21% Cu, 1.33 g/t Ag and 0.026% Mo. This hole extends mineralization near the centre of the deposit to a vertical depth of 1140 metres. Drill hole 30-1083, located in the south-central part of the 2024 MRE model, intersected two short 36 metre-long mineralized zones followed by 153.0 metres averaging 0.18% Cu and 1.56 g/t Ag (infill), followed by a deeper intercept of 427.5 metres averaging 0.26% Cu, 1.54 g/t Ag and 0.021% Mo. The latter incudes an expansion lower intercept, below the base of the 2024 MRE model, of 328.0 metres averaging 0.24% Cu, 1.43 g/t Ag and 0.020% Mo. This was followed by a final intercept of 55.5 metres averaging 0.16% Cu and 1.34 g/t Ag. This hole extends mineralization to a vertical depth of 900 metres. Drill hole 30-1087, located in the south-central part of the 2024 MRE model, intersected a short 40 metre-long mineralized zone followed by 334.5 metres averaging 0.23% Cu, 1.93 g/t Ag and 0.011% Mo (infill). This was followed by 74.5 metres averaging 0.62% Cu and 3.19 g/t Ag and then by another 48.3 metres averaging 0.36% Cu and 2.83 g/t Ag (both expansion), extending mineralization to a vertical depth of 598 metres. Drill hole 30-1088, located 80 metres outside the southwestern limit of the 2024 MRE model, intersected 42.0 metres averaging 0.32% Cu and 2.20 g/t Ag followed by 122.7 metres averaging 0.24% Cu and 2.63 g/t Ag. A third intersection at depth comprised 79.5 metres averaging 0.31% Cu and 2.19 g/t Ag (all expansion). Previously undocumented mineralization in this sector reached a vertical depth of 524 metres. Drill hole 30-1089, located in the south-central part of the 2024 MRE model, intersected 91.5 metres averaging 0.21% Cu and 1.54 g/t Ag (infill), followed by two short 26 to 27 metre-long mineralized zones, followed by 645.0 metres averaging 0.28% Cu, 1.46 g/t Ag and 0.023% Mo. The latter incudes an expansion lower intercept, below the base of the 2024 MRE model, of 396.7 metres averaging 0.30% Cu, 1.34 g/t Ag and 0.023% Mo. This hole extends mineralization to a vertical depth of 965 metres. Drill hole 30-1091, located in the southeastern part of the 2024 MRE model, intersected two short 23 to 26 metre-long mineralized zones, followed by 210.0 metres averaging 0.21% Cu and 2.10 g/t Ag (infill). This was followed by 38.0 metres averaging 0.22% Cu and 1.50 g/t Ag and then by another 42.6 metres averaging 1.14% Cu and 5.86 g/t Ag (both expansion), extending mineralization to a vertical depth of 583 metres where the hole was stopped in an open stope of historical E Zone mining operations. Drill hole 30-1093, located near the southeastern margin of the 2024 MRE model, intersected 112.0 metres averaging 0.25% Cu and 2.73 g/t Ag (infill), followed by four short 23 to 67 metre-long mineralized zones (all expansion), which extended mineralization to a vertical depth of 834 metres. Drill hole 30-1094, located near the southern limit of the 2024 MRE model, intersected 227.5 metres averaging 0.26% Cu and 2.11 g/t Ag (infill), followed by 57.0 metres averaging 0.13% Cu and 1.33 g/t Ag (infill), followed by two short 26 to 50 metre-long mineralized zones (both expansion), which extended mineralization to a vertical depth of 561 metres. Mineralization occurs as disseminations and stockworks of chalcopyrite with pyrite or pyrrhotite and minor bornite and molybdenite. At least five retrograde vein/stockwork mineralizing events have been recognized at Copper Mountain, which overprint earlier prograde skarn and porcellanite-hosted mineralization throughout the Gaspé Copper system. Porcellanite is a historical mining term used to describe bleached, pale green to white potassic-altered hornfels. Subvertical stockwork mineralization dominates at Copper Mountain whereas prograde bedded replacement mineralization, which is mostly stratigraphically controlled, dominates in the area of Needle Mountain, Needle East and Copper Brook. High molybdenum grades (up to 0.5% Mo) were locally obtained in both the C Zone and E Zone skarns away from Copper Mountain. The 2022 to 2024 Osisko Metals drill programs were focused on defining open-pit resources within the Copper Mountain stockwork mineralization ( see May 6, 2024 MRE press release ). Extending the resource model south of Copper Mountain into the poorly-drilled prograde skarn/porcellanite portion of the system subsequently led to a significantly increased resource, mostly in the Inferred category ( see November 14, 2024 MRE press release ). The current drill program is designed to convert of the November 2024 MRE to Measured and Indicated categories, as well as test the expansion of the system deeper into the stratigraphy and laterally to the south and southwest towards Needle East and Needle Mountain respectively. The November 2024 MRE was limited at depth to the base of the L1 skarn horizon (C Zone), and all mineralized intersections below this horizon represent potential depth extensions to the deposit, to be included in the next scheduled MRE update in Q1 2026. All holes are being drilled sub-vertically into the altered calcareous stratigraphy which dips 20 to 25 degrees to the north. The L1 (C Zone) and the L2 (E Zone) skarn/marble horizons were intersected in most holes, as well as intervening porcellanites that host the bulk of the disseminated copper mineralization. Table 2: Drill hole locations Explanatory note regarding copper-equivalent grades Copper Equivalent grades are expressed for purposes of simplicity and are calculated taking into account: 1) metal grades; 2) estimated long-term prices of metals: US$4.25/lb copper, $20.00/lb molybdenum and US$24/oz silver; 3) estimated recoveries of 92%, 70% and 70% for Cu, Mo and Ag respectively; and 4) net smelter return value of metals as percentage of the price, estimated at 86.5%, 90.7% and 75.0% for Cu, Mo and Ag respectively. Qualified Person The scientific and technical content of this news release has been reviewed, prepared, and approved by Mr. Bernard-Olivier Martel, P. Geo. (OGQ 492), an independent 'qualified person' as defined by National Instrument 43-101 – Standards of Disclosure for Mineral Projects ('NI 43-101'). Quality Assurance / Quality Control Mineralized intervals reported herein are calculated using an average 0.12% CuEq lower cut-off over contiguous 20-metre intersections (shorter intervals as the case may be at the upper and lower limits of reported intervals). Intervals of 20 metres or less are reported unless indicating significantly higher grades . True widths are estimated at 90 – 92% of the reported core length intervals. Osisko Metals adheres to a strict QA/QC program for core handling, sampling, sample transportation and analyses, including insertion of blanks and standards in the sample stream. Drill core is drilled in HQ or NQ diameter and securely transported to its core processing facility on site, where it is logged, cut and sampled. Samples selected for assay are sealed and shipped to ALS Canada Ltd.'s preparation facility in Sudbury. Sample preparation details (code PREP-31DH) are available on the ALS Canada website. Pulps are analyzed at the ALS Canada Ltd. facility in North Vancouver, BC. All samples are analyzed by four acid digestion followed by both ICP-AES and ICP-MS for Cu, Mo and Ag. About Osisko Metals Osisko Metals Incorporated is a Canadian exploration and development company creating value in the critical metals sector, with a focus on copper and zinc. The Company acquired a 100% interest in the past-producing Gaspé Copper mine from Glencore Canada Corporation in July 2023. The Gaspé Copper mine is located near Murdochville in Québec ' s Gaspé Peninsula. The Company is currently focused on resource expansion of the Gaspé Copper system, with current Indicated Mineral Resources of 824 Mt averaging 0.34% CuEq and Inferred Mineral Resources of 670 Mt averaging 0.38% CuEq (in compliance with NI 43-101). For more information, see Osisko Metals' November 14, 2024 news release entitled 'Osisko Metals Announces Significant Increase in Mineral Resource at Gaspé Copper'. Gaspé Copper hosts the largest undeveloped copper resource in eastern North America, strategically located near existing infrastructure in the mining-friendly province of Québec. In addition to the Gaspé Copper project, the Company is working with Appian Capital Advisory LLP through the Pine Point Mining Limited joint venture to advance one of Canada ' s largest past-producing zinc mining camps, the Pine Point project, located in the Northwest Territories. The current mineral resource estimate for the Pine Point project consists of Indicated Mineral Resources of 49.5 Mt averaging 5.52% ZnEq and Inferred Mineral Resources of 8.3 Mt averaging 5.64% ZnEq (in compliance with NI 43-101). For more information, see Osisko Metals ' June 25, 2024 news release entitled 'Osisko Metals releases Pine Point mineral resource estimate: 49.5 million tonnes of indicated resources at 5.52% ZnEq'. The Pine Point project is located on the south shore of Great Slave Lake, NWT, close to infrastructure, with paved road access, an electrical substation and 100 kilometers of viable haul roads. For further information on this news release, visit or contact: Don Njegovan, President Email: info@ Phone: (416) 500-4129 Cautionary Statement on Forward-Looking Information This news release contains 'forward-looking information' within the meaning of applicable Canadian securities legislation based on expectations, estimates and projections as at the date of this news release. Any statement that involves predictions, expectations, interpretations, beliefs, plans, projections, objectives, assumptions, future events or performance (often, but not always, using phrases such as 'expects', or 'does not expect', 'is expected', 'interpreted', 'management's view', 'anticipates' or 'does not anticipate', 'plans', 'budget', 'scheduled', 'forecasts', 'estimates', 'potential', 'feasibility', 'believes' or 'intends' or variations of such words and phrases or stating that certain actions, events or results 'may' or 'could', 'would', 'might' or 'will' be taken, occur or be achieved) are not statements of historical fact and may be forward-looking information and are intended to identify forward-looking information. This news release contains forward-looking information pertaining to, among other things: the tax treatment of the FT Units; the timing of incurring the Qualifying Expenditures and the renunciation of the Qualifying Expenditures; the ability to advance Gaspé Copper to a construction decision (if at all); the ability to increase the Company's trading liquidity and enhance its capital markets presence; the potential re-rating of the Company; the ability for the Company to unlock the full potential of its assets and achieve success; the ability for the Company to create value for its shareholders; the advancement of the Pine Point project; the anticipated resource expansion of the Gaspé Copper system and Gaspé Copper hosting the largest undeveloped copper resource in eastern North America. Forward-looking information is not a guarantee of future performance and is based upon a number of estimates and assumptions of management, in light of management's experience and perception of trends, current conditions and expected developments, as well as other factors that management believes to be relevant and reasonable in the circumstances, including, without limitation, assumptions about: the ability of exploration results, including drilling, to accurately predict mineralization; errors in geological modelling; insufficient data; equity and debt capital markets; future spot prices of copper and zinc; the timing and results of exploration and drilling programs; the accuracy of mineral resource estimates; production costs; political and regulatory stability; the receipt of governmental and third party approvals; licenses and permits being received on favourable terms; sustained labour stability; stability in financial and capital markets; availability of mining equipment and positive relations with local communities and groups. Forward-looking information involves risks, uncertainties and other factors that could cause actual events, results, performance, prospects and opportunities to differ materially from those expressed or implied by such forward-looking information. Factors that could cause actual results to differ materially from such forward-looking information are set out in the Company's public disclosure record on SEDAR+ ( under Osisko Metals' issuer profile. Although the Company believes that the assumptions and factors used in preparing the forward-looking information in this news release are reasonable, undue reliance should not be placed on such information, which only applies as of the date of this news release, and no assurance can be given that such events will occur in the disclosed time frames or at all. The Company disclaims any intention or obligation to update or revise any forward- looking information, whether as a result of new information, future events or otherwise, other than as required by law. Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accept responsibility for the adequacy or accuracy of this news release. No stock exchange, securities commission or other regulatory authority has approved or disapproved the information contained herein. Photos accompanying this announcement are available at:

New Found Gold Expands and Confirms Continuity of High-Grade Gold Mineralization at the Keats West Zone
New Found Gold Expands and Confirms Continuity of High-Grade Gold Mineralization at the Keats West Zone

Cision Canada

time09-07-2025

  • Business
  • Cision Canada

New Found Gold Expands and Confirms Continuity of High-Grade Gold Mineralization at the Keats West Zone

VANCOUVER, BC, July 9, 2025 /CNW/ - New Found Gold Corp. (" New Found Gold" or the " Company") (TSXV: NFG) (NYSE-A: NFGC) is pleased to announce the first drill results from the Company's 2025 Work Program at its 100%-owned Queensway Gold Project (" Queensway" or the " Project") in Newfoundland and Labrador, Canada. Highlights - Keats West 1 in the AFZ Core: Keats West open pit infill drilling: 55.0 g/t of Au over 35.05 m (NFGC-24-2254) 2 20.7 g/t Au over 18.05 m (NFGC-24-2258). 15.4 g/t Au over 16.70 m (NFGC-24-2260). Confirms continuity of multiple domains of high-grade gold within Keats West. Defines regions of new gold mineralization within the proposed Keats West open pit that are currently outside of the MRE 3 block model. Keats West UG 4 infill drilling: 7.08 g/t Au over 15.55 m (NFGC-24-2243A). Demonstrates potential to expand high-grade mineralization beyond the current open pit extents. Melissa Render, President of New Found Gold stated:"Today's results confirm the continuity and high-grade tenor of gold mineralization at Keats West, as well as the in-pit and near-pit expansion potential. These domains of high-grade mineralization start at surface and remain above a vertical depth of 150 metres and are located in proximity to other key zones, such as Iceberg and Keats in the AFZ Core area. Project advancement following the release of the initial MRE in March 2025 is focused on derisking high priority open pits, like Keats West with infill drilling targeting the higher-grade portions to start." Results Summary This news release includes results from 2,691 m of drilling in 22 diamond drill holes (" DDH") completed in Q2/25 as part of an infill program at Keats West in the AFZ Core (Tables 1 to 3). The program has been designed to target mineralization within the Keats West MRE open pit constraints, first focussing on converting resource blocks to indicated classification thereby increasing the confidence level in high-grade domains. In addition, results are reported from infill drilling, completed immediately beyond the south end of the proposed Keats West open pit within a preliminary UG panel. Keats West Open Pit Infill: Keats West highlight infill holes targeting the high-grade domains announced today include 55.0 g/t Au over 35.05 m (NFGC-25-2254), 20.7 g/t Au over 18.05 m (NFGC-25-2258), 15.4 g/t Au over 16.70 m (NFGC-25-2260) and 13.1 g/t Au over 10.60 m (NFGC-25-2245). These intercepts demonstrate the strong continuity of the high-grade corridors within the hosting Keats West fault zone that has a mineralized footprint of 315 m wide by 305 m long, with true widths averaging 20 m and ranging up to 50 m (Figure 1). Multiple regions within the Keats West open pit tested by the infill program intercepted significant mineralization outside of the current MRE block model. Intervals in these regions include 4.29 g/t Au over 22.00 m (NFGC-25-2242), 2.85 g/t Au over 33.85 m (NFGC-25-2247), 1.31 g/t Au over 30.00 m (NFGC-25-2257) and 10.6 g/t Au over 4.85 m (NFGC-25-2245) (Figure 2). Overall, the results correlate well to the MRE block model, with local fluctuations where grades were either higher or lower than anticipated. Keats West mineralization occurs within a gently south-southwest dipping fault zone that hosts a series of stacked and cross-cutting gold-bearing quartz veins on the west side of the AFZ in the AFZ Core area. The high-grade mineralization starts at surface and extends to depths of 150 m vertical, a shallowly positioned gold system. Keats West UG Infill: 7.08 g/t Au over 15.55 m (NFGC-25-2243A) was intersected at the south end of the Keats West zone, immediately beyond the proposed open pit, within the extents of one 50 m long preliminary UG panel that contributed to the MRE in the Keats West area (Figures 1 and 2). Follow up drilling has been completed in this sparsely tested region; results of this program are pending. Looking Ahead The Company will continue the work program at Keats West in H2/25 to complete infill drilling targeting the remaining domains of lower grade material in addition to expansion drilling in new areas of mineralization within the open pit. Subject to obtaining positive results from the UG follow-up program, drilling at Keats West will work to expand the deeper portions of this zone. Infill drilling has also been completed at the Lotto and Lotto North zones, while step-out and infill drilling is ongoing at the Iceberg, K2, Dome-Lotto and Dropkick zones, as well as at AFZ Peripheral conceptual and early-stage exploration target areas. The channel sampling at the Iceberg excavation that began in May 2025 is nearly complete. Results from ongoing work will be released as they become available. Excavation of the Lotto Zone (' Lotto") is underway. The objective of this work is to expose a 210 m long segment of Lotto to add certainty to the geological model and assess grade continuity. Excavating will be followed by detailed mapping, channel sampling and additional definition drilling. Tightly spaced definition drilling targeting key segments of the Keats-Baseline Fault Zone that have been excavated will also commence in Q3/25 starting at Keats, followed by Iceberg. On November 6, 2024, the Company announced it had engaged SLR Consulting (Canada) Ltd (" SLR") to deliver an initial MRE and preliminary economic assessment (" PEA"). The MRE was announced on March 24, 2025, and a PEA is ongoing with a revised target completion date of early Q3/25. This is an important milestone for the Project as it will provide preliminary project economics in addition to defining the work programs that will allow the Company to advance the Project. Mine design and planning, metallurgical processing and economic optimizations will be conducted by SLR to complete the PEA. Table 1: Drill Result Highlights Note that the host structures are interpreted to be moderately to steeply dipping. Infill veining in secondary structures with multiple orientations crosscutting the primary host structures are commonly observed in drill core which could result in additional uncertainty in true width. Composite intervals reported carry a minimum weighted average of 1 g/t Au diluted over a minimum core length of 2 m with a maximum of 4m consecutive dilution when above 200 m vertical depth and 2 m consecutive dilution when below 200 m vertical depth. Included high-grade intercepts are reported as any consecutive interval with grades greater than 10 g/t Au. Grades have not been capped in the averaging and intervals are reported as drill thickness. Details of all 22 drill holes are included in Table 2 and Table 3 below. Table 2: Summary of composite results reported in this news release for Keats West. Note that the host structures are interpreted to be moderately to steeply dipping. Infill veining in secondary structures with multiple orientations crosscutting the primary host structures are commonly observed in drill core which could result in additional uncertainty in true width. Composite intervals reported carry a minimum weighted average of 1 g/t Au diluted over a minimum core length of 2 m with a maximum of 4 m consecutive dilution when above 200 m vertical depth and 2 m consecutive dilution when below 200 m vertical depth. Included high-grade intercepts are reported as any consecutive interval with grades greater than 10 g/t Au. Grades have not been capped in the averaging and intervals are reported as drill thickness. Table 3: Details of drill holes reported in this news release. Sampling, Sub-sampling, and Laboratory All drilling recovers HQ core. For deep holes, the core size may be reduced to NQ at depth. The drill core is split in half using a diamond saw or a hydraulic splitter for rare intersections with incompetent core. A geologist examines the drill core and marks out the intervals to be sampled and the cutting line. Sample lengths are mostly 1.0 meter and adjusted to respect lithological and/or mineralogical contacts and isolate narrow (<1.0m) veins or other structures that may yield higher grades. Technicians saw the core along the defined cutting line. One-half of the core is kept as a witness sample and the other half is submitted for analysis. Individual sample bags are sealed and placed into totes, which are then sealed and marked with the contents. New Found Gold has submitted samples for gold determination by PhotonAssay™ to ALS Canada Ltd. ("ALS") since February 2024. ALS operates under a commercial contract with New Found Gold. Drill core samples are shipped to ALS for sample preparation in Thunder Bay, Ontario. ALS does not currently have accreditation for the PhotonAssay™ method at their Thunder Bay, ON laboratory. They do however have ISO/IEC 17025 (2017) accreditation for gamma ray analysis of samples for gold at their Australian labs with this method, including the Canning Vale lab in Perth, WA. Samples submitted to ALS beginning in February 2024, received gold analysis by photon assay whereby the entire sample is crushed to approximately 70% passing 2 mm mesh. The sample is then riffle split and transferred into jars. For "routine" samples that do not have VG identified and are not within a mineralized zone, one (300-500g) jar is analyzed by photon assay. If the jar assays greater than 0.8 g/t, the remaining crushed material is weighed into multiple jars and submitted for photon assay. For samples that have VG identified, the entire crushed sample is riffle split and weighed into multiple jars that are submitted for photon assay. The assays from all jars are combined on a weight-averaged basis. Select samples prepared at ALS are also analyzed for a multi-element ICP package (ALS method code ME-ICP61) at ALS Vancouver. Drill program design, Quality Assurance/Quality Control, and interpretation of results are performed by qualified persons employing a rigorous Quality Assurance/Quality Control program consistent with industry best practices. Standards and blanks account for a minimum of 10% of the samples in addition to the laboratory's internal quality assurance programs. Quality Control data are evaluated on receipt from the laboratories for failures. Appropriate action is taken if assay results for standards and blanks fall outside allowed tolerances. All results stated have passed New Found's quality control protocols. New Found's quality control program also includes submission of the second half of the core for approximately 2% of the drilled intervals. In addition, approximately 1% of sample pulps for mineralized samples are submitted for re-analysis to a second ISO-accredited laboratory for check assays. The Company does not recognize any factors of drilling, sampling, or recovery that could materially affect the accuracy or reliability of the assay data disclosed. The assay data disclosed in this press release have been verified by the Company's Qualified Person against the original assay certificates. The Company notes that it has not completed any economic evaluations of the Project and that the Project does not have any reserves. Qualified Person The scientific and technical information disclosed in this press release was reviewed and approved by Melissa Render, P. Geo., President, and a Qualified Person as defined under National Instrument 43-101. Ms. Render consents to the publication of this press release, by New Found Gold. Mrs. Render certifies that this press release fairly and accurately represents the scientific and technical information that forms the basis for this press release. About New Found Gold Corp. New Found Gold holds a 100% interest in Queensway, located in Newfoundland and Labrador, a Tier 1 jurisdiction with excellent infrastructure and a skilled local workforce. The Company has completed an initial MRE at Queensway (see New Found Gold news release dated March 24, 2025). A preliminary economic assessment is underway, with completion scheduled for early Q3/25. Recent drilling continues to yield new discoveries along strike and down dip of known gold zones, pointing to the district-scale potential of the 175,450 hectare project that covers a 110 km strike extent along two prospective fault zones. New Found Gold has a new management team in place, a solid shareholder base, which includes a 19% holding by Eric Sprott, and is focused on growth and value creation at Queensway. Please see the Company's website at and the Company's SEDAR+ profile at Keith Boyle Chief Executive Officer New Found Gold Corp. Follow us on social media at Acknowledgements New Found Gold acknowledges the financial support of the Junior Exploration Assistance Program, Department of Natural Resources, Government of Newfoundland and Labrador. Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release. Forward-Looking Statement Cautions This press release contains certain "forward-looking statements" within the meaning of Canadian securities legislation, relating to exploration, drilling and mineralization on the Project; the interpretation of the results and benefits of drilling programs; future drilling and the timing and expected benefits thereof; excavation and channel sampling; the initial resource estimate; potential resource expansion; potential resource conversion; the preliminary economic assessment and the expected funding, timing and benefits thereof; assay results; the interpretation of drilling and assay results, the extent of mineralization and the discovery of zones of high-grade gold mineralization; future exploration and the focus and timing of same; the merits of the Project; future press releases by the Company; and funding of the drilling program. Although the Company believes that such statements are reasonable, it can give no assurance that such expectations will prove to be correct. Forward-looking statements are statements that are not historical facts; they are generally, but not always, identified by the words "expects", "plans", "anticipates", "believes", "interpreted", "intends", "estimates", "projects", "aims", "suggests", "indicate", "often", "target", "future", "likely", "encouraging", "pending", "potential", "goal", "objective", "opportunity", "prospective", "possibly", "preliminary", and similar expressions, or that events or conditions "will", "would", "may", "can", "could" or "should" occur, or are those statements, which, by their nature, refer to future events. The Company cautions that forward-looking statements are based on the beliefs, estimates and opinions of the Company's management on the date the statements are made, and they involve a number of risks and uncertainties. Consequently, there can be no assurances that such statements will prove to be accurate and actual results and future events could differ materially from those anticipated in such statements. Except to the extent required by applicable securities laws and the policies of the TSX Venture Exchange, the Company undertakes no obligation to update these forward-looking statements if management's beliefs, estimates or opinions, or other factors, should change. Factors that could cause future results to differ materially from those anticipated in these forward-looking statements include risks associated with the Company's ability to complete the preliminary economic assessment, the results and timing of the preliminary economic assessment, possible accidents and other risks associated with mineral exploration operations, the risk that the Company will encounter unanticipated geological factors, risks associated with the interpretation of exploration, drilling and assay results, the possibility that the Company may not be able to secure permitting and other governmental clearances necessary to carry out the Company's exploration plans, the risk that the Company will not be able to raise sufficient funds to carry out its business plans, and the risk of political uncertainties and regulatory or legal changes that might interfere with the Company's business and prospects. The reader is urged to refer to the Company's Annual Information Form and Management's discussion and Analysis, publicly available through the Canadian Securities Administrators' System for Electronic Document Analysis and Retrieval (SEDAR+) at for a more complete discussion of such risk factors and their potential effects. SOURCE New Found Gold Corp.

GR Silver Mining Reports Initial High-Grade Results from Plomosas Mine Sampling Program
GR Silver Mining Reports Initial High-Grade Results from Plomosas Mine Sampling Program

Cision Canada

time08-07-2025

  • Business
  • Cision Canada

GR Silver Mining Reports Initial High-Grade Results from Plomosas Mine Sampling Program

VANCOUVER, BC, July 8, 2025 /CNW/ - GR Silver Mining Ltd. (" GR Silver Mining" or the " Company") (TSXV: GRSL) (OTCQB: GRSLF) (FRANKFURT: GPE) – is pleased to report initial results of Phase I of the new underground sampling program (the "Program") at the Plomosas Mine, Sinaloa, Mexico. The Program was designed around the following objectives: To model the recently mapped high-grade silver zones in the interior of the historic Plomosas Mine, post completion of the March 2023 NI 43-101 mineral resource estimate ("MRE"); To collect metallurgical test work samples essential to define key parameters for implementation of a Bulk Sampling Test Mining Program (" BSTM") at the Plomosas Mine (Table 1); and To enhance the existing database of underground samples for improved reconciliation between the MRE and areas identified for a BSTM. Sampling Highlights Initial highlights of the Phase I Plomosas Mine underground sampling program include: Chip Mine Face Sample – Level 883 - 2,423 g/t Ag Eq*, consisting of 675 g/t Ag, 46.9% Pb, 4.5% Zn and 0.54 g/t Au (Polymetallic Hydrothermal Breccia – Massive Sulphide) Channel Sample – Level 833 – 0.8 m @ 2,019 g/t Ag Eq, consisting of 137 g/t Ag, 5.74 g/t Au, 16.7% Pb, and 18.2% Zn (Polymetallic Hydrothermal Breccia – Massive Sulphide) Channel Sample – Level 950 – 0.6 m @ 3,993 g/t Ag Eq, 310 g/t Ag, 15.20 g/t Au, 26.2% Pb and 10.2% Zn (Polymetallic Hydrothermal Breccia – Massive Sulphide) GR Silver Mining's President and CEO, Marcio Fonseca, commented "The success of our new geological model at the Plomosas Mine, completed during the last 6 months, combined with detailed underground sampling, will be fundamental for the future development of engineering parameters to assess implementation of a Bulk Sampling Test Mining program in the underground mine. The current site has initial infrastructure and key permits in place, which can assist in any future mine and processing plant developments at the historic Plomosas Mine." The Program will consist of two phases over the next four months, whereby Phase I assesses metallurgical data collected to support engineering studies as part of the BSTM, and Phase II will complete a much larger dataset to help refine basic mining engineering and planning. Both phases of the Program will support a decision to potentially implement a BSTM at the Plomosas Mine before year-end. The Program leverages existing permits to operate at the Plomosas Mine, providing full access to the 7.4 km of underground development. Access to multiple areas for sampling, as shown in Figure 1, has enabled a better identification of unmined regions with high-grade, continuous silver, gold, and base metal mineralization at various levels of the underground mine. Assay results from 21 samples collected at the chosen sites (Table 1) have returned high-grade results, with values of up to 3,993 g/t Ag Eq. Multiple high-grade results indicate potential areas to advance Phase II, targeting the collection of additional metallurgical data and progress towards the implementation of a BSTM in the Plomosas Mine. Table 1 - Phase I Underground Sampling Assay Results, Plomosas Mine Sample Sample ID Underground Level Sample Ag Eq* Ag Au Pb Zn Cu Rocktype Type Length(m) g/t g/t g/t % % % 80458 815 877 127 2.07 1.0 2.7 2.9 Stockwork - Veins 80489 825 211 63 0.04 1.6 1.9 0.1 Polymetallic Veins 80494 862 910 90 0.99 11.5 8.5 0.1 Polymetallic Hydrothermal Breccia 80468 883 2,423 675 0.54 46.9 4.5 0.1 Polymetallic Hydrothermal Breccia Chip 80478 975 370 308 0.06 0.4 0.7 0.1 Polymetallic Hydrothermal Breccia Mine Face 80460 975 365 297 0.09 0.4 0.7 0.1 Polymetallic Veins Sample 80491 975 805 50 0.69 12.4 5.9 0.4 Polymetallic Veins 80474 1000 822 71 1.13 13.4 4.1 0.3 Stockwork - Veins 80466 1000 587 36 0.48 2.1 6.9 1.1 Polymetallic Hydrothermal Breccia 80479 1000 170 51 0.02 1.8 1.1 0.1 Polymetallic Hydrothermal Breccia - Massive Sulphide 80472 1000 1,000 174 1.52 10.5 7.7 0.3 Stockwork - Veins 80498 833 0.8 2,019 137 5.74 16.7 18.2 0.5 Polymetallic Hydrothermal Breccia - Massive Sulphide Channel 80499 833 1 909 71 2.32 6.7 8.8 0.3 Polymetallic Hydrothermal Breccia - Massive Sulphide Mine Face 80500 833 0.75 386 34 0.09 8.1 1.9 0.0 Polymetallic Hydrothermal Breccia Sample 80503 862 1.2 1,870 96 0.54 29.8 16.8 0.6 Polymetallic Veins 80504 950 0.8 1,192 28 0.18 29.5 5.0 0.0 Polymetallic Veins 80505 950 0.6 15 8 0.01 0.0 0.1 0.0 Polymetallic Hydrothermal Breccia 80507 950 0.9 64 11 0.16 0.1 0.6 0.1 Polymetallic Veins 80508 950 0.6 3,993 310 15.20 26.2 10.2 7.2 Polymetallic Hydrothermal Breccia - Massive Sulphide 80509 1000 1 421 68 0.55 2.5 5.1 0.1 Polymetallic Hydrothermal Breccia 80512 1000 1 899 864 0.07 0.1 0.2 0.1 Stockwork - Veins Note: Numbers may be rounded. Results are uncut and undiluted. True width not estimated as the Company does not have sufficient data from the new mineralized zones to determine the true widths of the intervals with any confidence. * Ag Eq calculations using US$20.00/oz Ag, US$1,600/oz Au, US$0.90/lb Pb, US$1.10/lb Zn and US$3.00/lb Cu, with metallurgical recoveries of Ag – 74%, Au – 86%, Pb – 69%, Zn – 75% and Cu – 80%. Ag Eq = ((Ag grade x Ag Price x Ag recovery) + (Au grade x Au price x Au recovery) + (Pb grade x Pb price x Pb recovery) + (Zn grade x Zn price x Zn recovery) + (Cu grade x Cu price x Cu recovery)/(Ag price x Ag recovery) The areas selected for Phases I and II of the Program consist of material where mineralization is continuous, with evidence of silver, gold and base metal mineralization at concentrations attractive for a potential BSTM in early 2026. The BSTM will also require the construction of a demonstration processing plant on site, with details to be defined after the completion of Phase II and associated engineering studies. The Company plans to continue investigating opportunities at the Plomosas Mine, based on recent success, targeting the higher-grade silver zones in the MRE, which may support the implementation of a BSTM. Note: Purple shapes are potential stopes blocks for BSTM. Pale grey represents existing underground developments of varying sizes, ramps and historical stopes. About the Plomosas Project The Plomosas Project, including the recent high-grade silver discovery in the San Marcial SE Area, is progressing in 2025 as an emerging high-grade silver district located in southern Sinaloa, Mexico. The Plomosas Project, covering 43,187 ha, benefits from mine infrastructure, road access and existing permits associated with past-producing historical mining sites. The district contains intermediate to low-sulfidation epithermal silver and gold mineralization, hosted in hydrothermal breccias and veins. Recent success in exploration and drilling has delineated wide, high-grade, shallow hydrothermal breccias in the San Marcial Area, including the SE Area discovery, where step-out drilling is progressing in 2025, aiming for continuous resource growth. At the historical Plomosas Mine, where a subsidiary of Grupo Mexico operated the underground mine from 1985 to 2000, exploratory and metallurgical programs are being conducted to support future decisions regarding the implementation of a BSTM. QA/QC Procedures The Company has implemented QA/QC procedures, which include the insertion of blank, duplicate, and standard samples in all sample lots sent to SGS de México, S.A. de C.V. laboratory facilities in Durango, Mexico, for sample preparation and assaying. For every sample with results above Ag >100 ppm (over limits), these samples are submitted directly by SGS de Mexico to SGS Canada Inc. at Burnaby, BC. The analytical methods include four acid Digestion and Inductively Coupled Plasma Optical Emission Spectrometry, with Lead Fusion Fire Assay and a gravimetric finish for silver above over limits. For gold assays, the analytical methods are Lead Fusion and Atomic Absorption Spectrometry, Lead Fusion Fire Assay, and gravimetric finish for gold above over limits (>10 ppm). Qualified Person The Qualified Person under National Instrument 43-101 Standards of Disclosure for Mineral Projects for this news release is Marcio Fonseca, P. Geo., President & CEO for GR Silver Mining, who has reviewed and approved its contents. About GR Silver Mining Ltd. GR Silver Mining is a Canadian-based, Mexico-focused junior mineral exploration company engaged in cost-effective silver-gold resource expansion on its 100%-owned assets, located on the eastern edge of the Rosario Mining District, in the southeast of Sinaloa State, Mexico. GR Silver Mining controls 100% of the Plomosas Project, including the former Plomosas underground mine and wide, high-grade silver mineralized zones at the San Marcial Area. Recent discoveries in the 78 km² of highly prospective, advanced-stage exploration concessions position the Company well for resource expansion at the Plomosas Project. GR Silver Mining Ltd. Márcio Fonseca, President & CEO Cautionary Statement Regarding Forward-Looking Information This press release contains "forward-looking statements" within the meaning of applicable Canadian securities legislation and information that are based on the beliefs of management and reflect the Company's current expectations. When used in this press release, the words "estimate", "project", "belief", "anticipate", "intend", "expect", "plan", "predict", "may" or "should" and the negative of these words or such variations thereon or comparable terminology are intended to identify forward-looking statements and information. Such statements and information reflect the current view of the Company. Risks and uncertainties may cause actual results to differ materially from those contemplated in those forward-looking statements and information. By their nature, forward-looking statements involve known and unknown risks, uncertainties and other factors which may cause our actual results, performance or achievements, or other future events, to be materially different from any future results, performance or achievements expressed or implied by such forward-looking statements. Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this press release. SOURCE GR Silver Mining Ltd.

Tanger Med enforces same-day ticket rule to streamline summer return of Moroccans abroad
Tanger Med enforces same-day ticket rule to streamline summer return of Moroccans abroad

Ya Biladi

time08-07-2025

  • Ya Biladi

Tanger Med enforces same-day ticket rule to streamline summer return of Moroccans abroad

As the peak summer return period approaches, Tanger Med Passengers is preparing for heavy traffic volumes. To manage the flow and ensure safety, a strict rule will be in effect from August 1 to 31, 2025: only travelers with a confirmed ticket for the same day will be granted access to the port. The goal is to reduce congestion and facilitate smoother, safer crossings during this busy season. Travelers are encouraged to regularly check online traffic forecasts, which feature a color-coded calendar (from green to brown) to help identify the best times for travel. Nationwide Mobilization for MRE Return The Marhaba operation, coordinated by the Mohammed V Foundation for Solidarity, brings together multiple institutions, including the police, gendarmerie, customs, auxiliary forces, public health services, and local authorities. All are mobilized to ensure returning Moroccans living abroad (MRE) are welcomed with dignity, safety, and efficiency. This well-established national effort is designed to support the summer return of MREs, many of whom are traveling with family or returning after long absences. Enhanced Travel Assistance To support passengers before and during their journey, several information channels are available: the website official social media pages, a dedicated helpline, and Tanger Med Radio on 100 FM. ? From August 1 to 31, access to the Tanger Med port is reserved for passengers with a ticket for the same day. Objective: to streamline traffic and secure the return of MRE ??⛴ #TangerMed #MRE #Marhaba2025 #Maroc — (@yabiladi_fr) July 7, 2025 Real-time updates on crossing status and a free SMS alert service keep travelers informed of any delays or changes. Thanks to these resources, passengers can better plan their trip, avoid peak traffic times, and enjoy a more streamlined and supported travel experience.

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into a world of global content with local flavor? Download Daily8 app today from your preferred app store and start exploring.
app-storeplay-store