logo
#

Latest news with #MatthewStory

Network Rail closes Spalding level crossing for upgrade works
Network Rail closes Spalding level crossing for upgrade works

BBC News

time05-07-2025

  • Automotive
  • BBC News

Network Rail closes Spalding level crossing for upgrade works

A level crossing in Spalding will be closed as work begins on a £215,000 upgrade scheme. Network Rail said the renovation of the crossing on Winsover Road would "improve both rail reliability and safety for all users".The "essential" work includes replacing the crossing surface, which had "reached the end of its operational life". Deck units, tarmac and road markings will also be replaced, the company crossing will be closed at weekends until 14 July and also overnight between 11 and 13 August. Motorists and pedestrians have been urged to check closure times before starting their journeys. The weekend closures are between 20:30 BST on Saturday and 07:00 on overnight weekday closures in August will be from 21:30 to 06: Rail said it hoped to complete the work while no trains were scheduled to run and "with the least possible disruption to passenger journeys and local residents".Matthew Story, a supervisor for the company, said: "This significant investment will deliver a much smoother and safer crossing for both rail and road users. "We understand the disruption this essential work may cause and thank the local community for their patience while we complete these important upgrades."He said most of the work would be carried out overnight and at weekends to minimise have been put in place. Listen to highlights from Lincolnshire on BBC Sounds, watch the latest episode of Look North or tell us about a story you think we should be covering here.

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into a world of global content with local flavor? Download Daily8 app today from your preferred app store and start exploring.
app-storeplay-store