logo
#

Latest news with #replacement

A large number of issues
A large number of issues

Irish Times

timea day ago

  • Health
  • Irish Times

A large number of issues

Sir– Having mislaid my old European Health Insurance Card, I phoned the relevant HSE office in Bray for a replacement. Online replacement was not possible. As I was unable to quote my old EHIC (20 digit) number, I was advised to visit their office with my passport, plus a paper utility bill. My Public Services Card was not acceptable. I now have six 'unique' ID numbers supplied by the State, plus hospital patient, post code and ESB meter numbers. Surely, within a huge 20 character ID it must be possible to incorporate all of the above (with space for War and Peace)? – Yours, etc, READ MORE LIAM PLUCK, Co Wicklow.

Unsafe footbridge shut since 2023 to be destroyed
Unsafe footbridge shut since 2023 to be destroyed

Yahoo

time2 days ago

  • General
  • Yahoo

Unsafe footbridge shut since 2023 to be destroyed

Work will begin to demolish and replace an unsafe bridge which has been closed for nearly two years, West Sussex County Council says. Whites Footbridge was shut in August 2023, forcing pedestrians travelling between Steyning and Upper Beeding to walk alongside a busy road after the bridge was deemed "beyond economic repair". The council now says work will begin on Monday, 14 July to destroy the bridge near King's Barn Lane, and replace it with a new structure to reopen the footpath. Joy Dennis, cabinet member for highways and transport, said reinstating the route will make the route "easier and safer to use". Originally installed in 1903, a structural report highlighted "severe corrosion" which compromised the bridge's structural integrity. The 2023 report recommended stopping pedestrians using the bridge "for the foreseeable future" until a replacement structure could be installed. The project, expected to last 12 weeks, will also include resurfacing works around the bridge on the east side of the River Adur. The bridge will be funded by the county council's capital delivery budget, while the footpath improvements will be supported by local community groups. Replacement work to the bridge following the demolition will begin after gas networks in the area have been diverted by Southern Gas Networks (SGN). Follow BBC Sussex on Facebook, on X, and on Instagram. Send your story ideas to southeasttoday@ or WhatsApp us on 08081 002250. Public inquiry to begin into A259 bridge plans Plans to extend powers to tackle nuisance dogs West Sussex County Council

Steyning footbridge over River Adur to be demolished and replaced
Steyning footbridge over River Adur to be demolished and replaced

BBC News

time2 days ago

  • General
  • BBC News

Steyning footbridge over River Adur to be demolished and replaced

Work will begin to demolish and replace an unsafe bridge which has been closed for nearly two years, West Sussex County Council Footbridge was shut in August 2023, forcing pedestrians travelling between Steyning and Upper Beeding to walk alongside a busy road after the bridge was deemed "beyond economic repair".The council now says work will begin on Monday, 14 July to destroy the bridge near King's Barn Lane, and replace it with a new structure to reopen the Dennis, cabinet member for highways and transport, said reinstating the route will make the route "easier and safer to use". Originally installed in 1903, a structural report highlighted "severe corrosion" which compromised the bridge's structural 2023 report recommended stopping pedestrians using the bridge "for the foreseeable future" until a replacement structure could be project, expected to last 12 weeks, will also include resurfacing works around the bridge on the east side of the River bridge will be funded by the county council's capital delivery budget, while the footpath improvements will be supported by local community work to the bridge following the demolition will begin after gas networks in the area have been diverted by Southern Gas Networks (SGN).

Burdisso also named in Roma's sporting director search
Burdisso also named in Roma's sporting director search

Yahoo

time18-06-2025

  • Sport
  • Yahoo

Burdisso also named in Roma's sporting director search

With Florent Ghisolfi set to leave the club, Roma are now busy looking for the Frenchman's replacement. On Tuesday, it was revealed that Roma and Ghisolfi had agreed to part ways after just one year. In light of this news, Italian media mentioned the names of Frederic Massara and Federico Balzaretti as possible replacements. Advertisement Late on, Tuttomercatoweb brought forth another name that rings familiar to Roma fans: Nicolas Burdisso. The former Roma defender is reportedly among the candidates for the sporting director vacancy following his experience as technical director at Fiorentina which came to an end in the summer of 2024.

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into a world of global content with local flavor? Download Daily8 app today from your preferred app store and start exploring.
app-storeplay-store