logo
#

Latest news with #sheepBeef

Flood-hit Tasman farm 'more like a riverbed than a farm'
Flood-hit Tasman farm 'more like a riverbed than a farm'

RNZ News

time3 days ago

  • Climate
  • RNZ News

Flood-hit Tasman farm 'more like a riverbed than a farm'

Grazing paddocks are strewn with slash and debris at Dion McGaveston's Tapawera farm, when the Motueka River burst its banks during the recent floods. Photo: SUPPLIED/Dion McGaveston Work to bolster flood resilience along the Motueka River came too late for one flood-hit Tasman farmer who lost dozens of hectares of farmland to the stopbank-bursting river. Communities at the top of the South Island, particularly around Tasman and Nelson, were now in recovery mode, following the one-in-100-year flood that sent the areas in a state of emergency on 27 June. Officials were bracing for more rainfall in the area forecast this week. Dion McGaveston farmed sheep and beef across about 200 hectares in Tapawera near the Motueka River. He said the farm was still a "bit of a mess" due to the Motueka River it bordered running through the property, bringing silt, debris and rocks in its trail of destruction. "We've got about 50 hectares that have been completely flattened by the floods, not a fence left," he said. "20-odd hectares covered in river rocks, gravel, debris and silt. Yeah, it looks more like a riverbed than a farm at the moment." McGaveston said a defect was discovered at the stopbank between the farm and the river a couple of years ago, and it was working with Tasman District Council to address it. "[2023] I think it was when we went first went to council and said it needed to be repaired because it was going to come through there, like it has," he said. "It was just like an open gate for the whole flood to go straight through there." McGaveston said he believed a plan developed with council was going to progress, following their emergency response work, which he supported. "Actually, they started dropping a bit of rock there the day before the flood, but that was meant to happen a bit earlier in the year and it didn't. "And then the rest of the job was meant to start in July." He said he believed the damage on his farm would not have been as bad if the stopbank had held. "For us it's just that we got all the stuff, gravel and river off all over our paddocks that needs to come off as well. So the job is ten times worse." The Tasman District Council were faced with the task of maintaining 285 kilometres of major rivers. Efforts to improve flood resilience garnered funding from central government last year. In August, the government aimed to boost flood resilience in Nelson and Tasman, to the latter allocating $6.6m for refurbishing the Lower Motueka River stopbank and $900,000 towards the Peach Island stopbank repair. David Arseneau, the district council's team leader for rivers and coastal structures, said it was working collaboratively with McGaveston and neighbour Hinetai Hops on the issue. Arseneau said several rain events in the past 12-18 months had led to the failure of a "legacy, unconsented private stopbank" that was keeping the river contained. "It is hard to overstate just how severe this flood event has been for the District, approximately a 100-year flow event, and the scale of this flood needs to be put into perspective with the work that will be done at Dion's farm," he said. "The project will involve establishing a new riverbank line with new willow plantings, anchored trees reclaimed from the current riverbank, and grading to provide more room and capacity for the river to flow through this area." Arseanau said about five hectares of McGaveston's farm, that was tipped to become a man-made river corridor, became occupied by the river in this flood event. He said planned work to plant willow trees to capture flood debris, when mature, will resume as planned, though work was disrupted by the floods. But he added that massive floods will always affect low-lying floodplains where many in the district farmed. But he hoped to reduce the intensity of the damage by "making sure the river has enough room", and by establishing riverside riparian buffers. "However, the river channel will only ever be able to contain limited flows before spilling into its floodplain, perhaps a mean annual or two-year flow level, and Council does not provide any flood protection service (i.e. through stopbanks) in this area of the Motueka River to contain more significant flows than that." McGaveston said there were no stock losses and they were able to find grazing land, but the challenge for feed will come later into winter. Sign up for Ngā Pitopito Kōrero , a daily newsletter curated by our editors and delivered straight to your inbox every weekday.

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into a world of global content with local flavor? Download Daily8 app today from your preferred app store and start exploring.
app-storeplay-store