
Ahmedabad Municipal sign foretells road collapse, rain delivers
2
3
4
Ahmedabad: The civic body appears to have a newfound sense of precognition. Just below the Apparel Park metro station in Khokhra, a warning sign erected in mid-May by Ahmedabad Municipal Corporation (AMC) foretold that the freshly dug road "may collapse in the future".
True to the prophetic words, when the heavens finally opened on June 13 and continued the next day, the road did exactly that.
This foresight comes as the city once again plunges into its annual rainy season ritual, which is, a test of patience, balance, and sheer luck for anyone attempting to navigate our city's roads.
Despite the corporation reportedly splurging Rs 500 to Rs 600 crore annually on road repairs, residents are quick to point out that the results are "scant".
You Can Also Check:
Ahmedabad AQI
|
Weather in Ahmedabad
|
Bank Holidays in Ahmedabad
|
Public Holidays in Ahmedabad
From office-goers to students, from truck drivers to delivery agents, all find themselves battling swamped and slippery roads. Even for those in four-wheelers, the challenges are many. "You are dodging craters and constantly burning more fuel from repeatedly braking in the heavy traffic," lamented 33-year-old Mitesh Vyas, a banker from Memnagar. Newly resurfaced roads in Bopal-Ambli, Gurukul-Bhuyangdev road, Maninagar and one near Odhav flyover crumbled soon after the first few instances of showers.
"If it rains heavily, you can no longer see the potholes and end up damaging your vehicle or being involved in an accident. At the very least, you will have to endure body pain after the constant bumpy ride," said Akshay Tripathi, a resident of Naroda.
To repair each cave-in, the civic body spends Rs 25 lakh. Also, more than 15,000 potholes appear annually during rains, with 19,000 recorded in 2024-25 alone. Separate tenders are issued for pothole repairs, costing over Rs 1 crore per zone, and post-monsoon repairs cost between Rs 5 crore and Rs 7 crore annually, AMC sources said.
A recent report by the chief auditor for 2023-24 has unearthed a concerning issue: files pertaining to road resurfacing projects valued at roughly Rs 2,000 crore over the last five years were never submitted for audit. This lapse follows a 2017 scandal involving duplicate bills for road damage repairs and bitumen, after which audits of roadworks across AMC's seven zones were halted.
Hashtags

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


Time of India
30 minutes ago
- Time of India
163 landslide-prone areas in Chikkamagaluru district
Chikkamagaluru: The district administration has identified 163 landslide-prone areas. These areas were determined based on landslides and damage caused by heavy rains since 2019 and are being closely monitored. The district administration also identified 75 care centres to relocate families at risk if rains intensified. Preparations were in place to relocate people if signs of increased moisture and soil loosening were observed. Out of the 163 vulnerable areas, the Geological Survey of India (GSI) separately listed 25 locations where human settlements and roads were at risk. In Gudethota village of Koppa taluk, 17 families lived in danger during the rainy season every year. The road near Kavikal Gandi on the Bababudangiri road was rebuilt. The work, costing Rs 90 lakh, was completed. Apart from this, landslide prevention work has not started elsewhere. For two landslide prevention projects on Mullayanagiri road, approval was granted for work costing Rs 85 lakh. The district administration stated that Rs 4.8 crore was sanctioned through the public works department to repair the road near Narve in Koppa taluk. by Taboola by Taboola Sponsored Links Sponsored Links Promoted Links Promoted Links You May Like Giao dịch CFD với công nghệ và tốc độ tốt hơn IC Markets Đăng ký Undo Officials stated that once all these projects were completed, landslides in the most vulnerable areas could be prevented for now. In Charmadi Ghat, the GSI identified three risk areas, and the district commissioner wrote to national highway division officials to address these. The district administration informed the National Highways Authority of India (NHAI) to take immediate action where landslides were possible at two locations on National Highway-163 in Sringeri taluk. Fifty-seven nodal officers were appointed to monitor landslide-prone areas, with one officer assigned to each gram panchayat jurisdiction. A disaster management control room operating 24/7 was established. Authorities supervised a total of 164 bridges and 51 footpaths. During disaster management, nearly 110 excavators, 74 tractors, and 263 tippers were deputed for emergency operations. Additionally, 108 professional swimmers and 330 volunteers were identified and trained to attend emergencies.


NDTV
3 hours ago
- NDTV
Ola, Uber New Rules: Pricing, Cancellation, And More, What Drivers And Passengers Must Know
The central government has announced new regulations under the 'Motor Vehicles Aggregator Guidelines 2025' that are expected to reshape the operations of cab aggregators like Ola, Uber, and Rapido. These guidelines, issued by the Ministry of Road Transport and Highways, advise states to adopt the revised norms within the next three months. Here are five key points from the new guidelines that could impact both passengers and drivers: Surge Pricing Increased: Cab aggregators can now charge up to double the base fare during peak hours (previously 1.5 times). Minimum Fare During Off-Peak: A minimum of 50% of the base fare can be charged during non-peak hours. Minimum Distance for Base Fare: The base fare must cover a minimum distance of 3 kilometres. Fairer Driver Compensation: Drivers owning their vehicles must receive at least 80% of the total fare collected; aggregator-owned vehicle drivers must get at least 60%. Both Drivers and Passengers Face Cancellation Penalties: The government has also set new rules for cancellations. If a driver cancels a ride after accepting it without a valid reason, a penalty of 10 per cent of the fare - up to a maximum of Rs 100 - will be charged. The same rule applies to passengers who cancel a ride without a valid reason. Meanwhile, India's ride-hailing and bike-taxi industry has welcomed the government's new Motor Vehicle Aggregator Guidelines (MVAG) 2025, calling it a major step toward regulatory clarity, innovation, and expanded affordable mobility across the country. The Ministry of Road Transport and Highways on Tuesday issued the Motor Vehicle Aggregator Guidelines (MVAG) 2025, providing long-awaited regulatory clarity for India's shared mobility sector by officially permitting states to allow the use of non-transport (private) motorcycles for passenger rides through aggregator platforms. This move brings relief to bike taxi operators like Rapido and Uber, who have long operated in a legal grey area, especially in states like Karnataka, where a recent ban on bike taxis had led to increased tensions and widespread protests. Major industry players, including Uber and Rapido, have welcomed the move, acknowledging its potential to drive innovation, expand affordable mobility, and create new livelihood opportunities.


New Indian Express
4 hours ago
- New Indian Express
14 dead, 31 missing following flash floods in Mandi district in Himachal; Rs 407 crore property damaged
CHANDIGARH:With the recovery of three more bodies, the death toll in the three flash floods triggered by fourteen cloudbursts has now touched fourteen, and 31 people are still missing in the Mandi district of Himachal Pradesh. Meanwhile, approximately 406 people have been evacuated from affected areas in Mandi, Chamba, and Hamirpur districts as authorities work to trace the missing and restore blocked routes. The total damage to property in the hill state over the past 12 days has been estimated at Rs 407.02 crore, following torrential rains that have wreaked havoc since the onset of the monsoon season. According to data from the State Emergency Operation Centre, fourteen cloudbursts and three flash floods occurred in different parts of Mandi district. All fourteen deaths were reported from Mandi, while five people are injured, 31 are missing, and 406 have been evacuated — including 198 in Mandi and another 100 to 150 from Pandoh market due to rising water levels in the Beas river, 51 from Hamirpur district, and three from Chamba district. Additionally, 164 animals have died, one hydroelectricity project has been damaged, and 154 houses, 106 cow sheds, fourteen bridges, and thirty-one vehicles have been damaged. Across the state, 246 roads remain closed - including 145 in Mandi, 36 in Kullu, 22 in Shimla, 25 in Sirmaur, two in Chamba, twelve in Kangra, three in Una, and one in Solan district. Moreover, 404 electricity transformers and 784 water supply schemes have been disrupted. Sources said two bodies were recovered on Thursday morning. In total, seven bodies were recovered from Gohar, five from Thunag, and one from Karsog subdivisions of Mandi district. The Manali-Keylong road was blocked following floods in a drain near Solang Nallah, and traffic has been diverted through Rohtang Pass. Two teams from the National Disaster Response Force (NDRF) and the State Disaster Response Force (SDRF), along with police and home guards, are actively engaged in search and rescue operations in the district.