
Chaudhari orders action against negligent contractors in Hanuman Nagar zone
During a zonal review meeting held on Thursday, Chaudhari also instructed officials to issue notices to owners of vacant plots left in unhygienic conditions.
The visit followed instructions from guardian minister Chandrashekhar Bawankule to assess pre-monsoon preparedness. Chaudhari inspected Hanuman Nagar zone office and later interacted with former corporators and citizens who raised issues from areas like Nimkar Nagar, Shahu Nagar, Ramteke Nagar, Ayodhya Nagar, and other localities.
Complaints ranged from incomplete road repairs to delays in drain and nullah cleaning.
Expressing displeasure over roads dug up under Amrut 2.0 scheme and not yet restored, Chaudhari asked for immediate repairs and instructed that essential monsoon-related works — including damaged sewer lines — be completed on priority.
The commissioner also visited the under-construction water purification plant at New Narsala under the Smart City project and ordered the speedy completion of pending STP works.
Additional commissioners Vasumana Pant and Vaishnavi B, Chief Engineer Manoj Talewar, and other senior officials were present. A memorandum on pre-monsoon work delays was submitted on behalf of MLA Mohan Mate.

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


The Print
34 minutes ago
- The Print
Chennai is being governed on PowerPoint—plans shine on slides, fail on streets
One must ask: how can a city that hosts global tech hubs flood at the first sign of drizzle? The problem is not misgovernance, but choreographed decay — a deliberate model where the facade is prioritised over the fix, where perception is infrastructure and citizens are mere spectators. For the past 1,500 days or so, Tamil Nadu's capital has been on grand display — not in outcomes, but in photoshoots, press conferences, and Instagram reels. Chennai was promised transformation. Manifestos spoke of new drains, roads, safety, and law and order. But this is not a city rebuilt; it is a city repackaged. In May, the Greater Chennai Corporation (GCC) issued a work order for 18 new stormwater packages worth Rs 22 crore. The order for storm water drains has been issued several times. Yet many prime roads in Mandaveli, Washermanpet, and West Mambalam remain dug up, unfinished, or flood-prone. Even mild showers lead to water-logging. Even in a high-visibility zone like T Nagar, footpaths were redesigned but crossings for people with disabilities remain unusable. The GCC's grievance portal has a long list of complaints stuck in limbo. North Chennai, once considered the backbone of Chennai's economy, continues to reel under poor sanitation, unauthorised constructions, lack of new infrastructure, and worsening law and order. Last year, Chief Minister MK Stalin inaugurated urban housing projects in the region. Yet families in Vyasarpadi still live beside sewage-filled lanes. In what is branded as New Chennai — the stretches adjacent to Rajiv Gandhi Salai, erstwhile Old Mahabalipuram Road — the story is worse. Residents of Perungudi, Pallikaranai, Thoraipakkam, and Sholinganallur face persistent stagnation with drain water seeping into basements. Despite Smart City claims, drain mapping in these zones remains below 20 per cent as of late 2024. A bin-free Chennai within a year was the goal in 2019, but garbage still piles up on every street corner. The Tamil Nadu State Marketing Corporation (TASMAC) Limited continues to operate beyond permitted hours. Ward-level governance is invisible, except when there's an MLA's photo to be clicked or the mayor decides to stage a photo op. The public is left navigating a city governed by PowerPoint urbanism, where ideas live on slides but never make it to the streets. The influencer republic While the city rots, the government shines — online. Budgets flow not just into stormwater drains and flyovers, but into something more intangible: perception. The ruling DMK has created an ecosystem of influencer marketers, meme page operators, media contractors, and self-styled 'neutral' commentators. Between editorial tie-ups, influencer briefings, and digital campaign spends, Tamil Nadu has become the 'Reel Estate of Governance'. It is hard to find a traffic signal that works, but easy to find a reel praising the CM. That is no coincidence. The governance model here does not prioritise fixing what's broken. It focuses on making sure you feel guilty for pointing it out. Also read: DMK should wake up. Anti-Hindi politics isn't working on Tamil Nadu voters anymore Lawless streets, silenced voices The arrest of former DMK functionary Jaffer Sadiq last year by the NCB and ED in a Rs 2,000 crore drug racket spotlighted how organised crime has seeped deep into Tamil Nadu's political corridors. The ED seized over Rs 55 crore in assets and uncovered networks recruiting drivers and runners for international drug transit. Teachers in Royapuram and Choolai whisper about narcotics slipping into classrooms. They whisper, because speaking out has consequences. In October last year, a DMK councillor was booked for allegedly demanding Rs 10 lakh from a contractor in Tambaram to allow work on a Metro water project—not an isolated event but part of a pattern where real estate clearances have become bargaining chips. Gang murders and broad daylight stabbings now barely make it through 24 hours of news coverage. The brutal visuals from the 2024 murder of Tamil Nadu's Bahujan Samaj Party (BSP) president K Armstrong remain etched in public memory — a grim reminder that violence is no longer an exception but a broadcast. Public homicides, even when caught on CCTV, rarely provoke a sustained administrative or political response. Public desensitisation is not accidental. It's a strategic component of the Dravidian model. It allows impunity to thrive. The political design of decay The Tamil Nadu government didn't lose control. It handed it over. Civic contracts have turned into patronage pipelines. Law and order is weaponised selectively. Welfare is transactional. Accountability is rhetorical. The DMK's 2021 manifesto promised decentralised governance and citizen charters. But, 1,500 days later, we are left with AI edits. About 97 per cent of Smart Cities Mission funds for Chennai have been utilised as of 2024. Contractors blacklisted in 2021 are back with fresh contracts. The case of PST Engineering Construction illustrates this pattern vividly. Despite facing severe criticism and a proposed blacklisting over substandard work on the KP Park tenements for economically weaker sections, PSTEC was later awarded a new contract for infrastructure development at Fintech City in Nandambakkam. Only those entrenched in power, and familiar with the opaque workings of the DMK–bureaucracy nexus, can truly answer how many more contracts have quietly made their way back to the proxies of previously blacklisted contractors. There is a reason for this rot: the ruling party sees no electoral urgency in serving Chennai. The city is treated as a DMK stronghold — and therefore taken for granted, with citizens strung along on the assumption that loyalty overpowers accountability. But the people of Chennai have a different story to tell. They will no longer play background props in the DMK's studio. Also read: United States of South India—Stalin's push against delimitation goes beyond Tamil Nadu politics The next 1500 days won't begin tomorrow These aren't missteps. It's a carefully designed model that benefits a few and fails the many. As someone who contested the 2024 Lok Sabha elections from the Chennai Central constituency and continues to walk its lanes, I hear the same story in every ward. 'We don't need more promises. Just fix what's broken.' But the silence from the top is not an oversight. It's permission. A city that once prided itself on civic order has been made to believe that dysfunction is normal. That accountability is too much to ask for. And that complaints should be whispered, not filed. The next 300 days, leading up to the 2026 Assembly election in Tamil Nadu, will likely produce more content than correction, more PR than performance. That is the logic of politics when it loses touch with people. Which is why the next 1,500 days that truly count will only begin after Tamil Nadu sees a government that understands that governance is not theatre. Because the people of Chennai aren't waiting for utopia. They just want a city that works. A street that drains. A school that's safe. A government that shows up. And no, that's not too much to ask for. The author is State Secretary of the BJP in Tamil Nadu. He was the party's candidate for Chennai Central in the 2024 Lok Sabha elections. He tweets @VinojBJP. Views are personal. (Edited by Aamaan Alam Khan)


Hindustan Times
3 hours ago
- Hindustan Times
Heavy vehicle operators launch indefinite strike; school transport unions give 48-hour deadline
Goods transporters across Maharashtra launched an indefinite strike at midnight on Tuesday, bringing the movement of trucks, tempos, tankers, and trailers to a halt. The strike threatens to disrupt essential supply chains, with heavy vehicle operators refusing to back down until the state government addresses their long-pending demands. A high-level meeting held at Mantralaya on Tuesday yielded no breakthrough. (HT) Passenger transporters, including school buses and private travel unions, have temporarily stayed out of the strike following an assurance from transport minister Pratap Sarnaik of a meeting with chief minister Devendra Fadnavis within two days. However, they have warned they will join the agitation if no resolution is reached. The strike, called by the Maharashtra State Goods and Passenger Transport Association, comes after failed negotiations with the state government. A high-level meeting held at Mantralaya on Tuesday yielded no breakthrough. 'With basic demands pending for over six weeks, the government has left us no choice,' said Baba Shinde, president of the association. 'We submitted a memorandum on June 16 and even observed a hunger strike at Azad Maidan till June 29. Despite assurances, nothing concrete has happened.' Shinde added that while the government reached out to school and private transporters, heavy goods operators received no direct communication. 'The strike will continue until our issues are resolved.' Among the key demands are simplification of transport regulations, clarity on toll collection mechanisms, and pending subsidies. The impact of the strike is already being felt. Disruptions in the supply of grains, vegetables, milk, flowers, and medicines are expected if the deadlock continues. Construction, infrastructure, and industrial activities, including Metro and Smart City projects, are also likely to suffer delays. Anil Garg, president of the Maharashtra School Bus Owners Association, said, 'We have given the government a 48-hour window. If the CM fails to act, school transporters across the state will join the protest. We stand in full solidarity with the heavy vehicle unions.' A meeting with Chief Minister Devendra Fadnavis is scheduled for later today (July 2) to address the transporters' concerns.


Time of India
6 hours ago
- Time of India
State Orders Third-Party Audit Amid Alarming Quality Concerns in AMRUT 2.0 Projects
Nagpur: Amid rising complaints of shoddy execution and deteriorating public infrastructure, the Maharashtra govt on June 30 issued a Government Resolution (GR) directing Maharashtra Jeevan Pradhikaran (MJP) to implement Third Party Technical Audits (TPTA) for all ongoing works under the Rs10,513 crore Amrut 2.0 mission. Tired of too many ads? go ad free now The decision comes in the wake of mounting criticism over substandard work in key projects—particularly those being executed by the Nagpur Municipal Corporation (NMC). These include the Rs381 crore water supply augmentation project and the Rs900 crore Pora River Pollution Abatement scheme, both under Amrut 2.0. The pollution abatement project has already drawn public ire. NMC Commissioner Abhijeet Chaudhari slapped a Rs1 crore cumulative fine on three contractors for botched restoration after sewer line work across southwest and south Nagpur. Another firm involved in the water supply augmentation project was also penalised for execution lapses. Dug-up roads in affected areas continue to torment motorists, with private agencies ignoring repeated warnings to complete proper restoration. Despite funds pouring in and clear directives from the civic administration, on-ground execution remained sloppy—sparking outrage among residents and raising doubts about project oversight. The Amrut 2.0 (Atal Mission for Rejuvenation and Urban Transformation) was rolled out in Maharashtra in July 2022 and spans from FY 2021–22 to 2025–26. Of the Rs10,513 crore outlay, Rs9,285 crore is earmarked for project implementation, with the rest reserved for reform incentives and administrative expenses. To plug the accountability gap, the state has now asked MJP, which functions as the Project Development and Management Consultant (PDMC), to prepare a Request for Proposal (RFP) within two weeks to empanel qualified technical auditors. Tired of too many ads? go ad free now The process will be overseen by the State Level Technical Committee (SLTC), which has also been empowered to revise the audit's scope as needed. Audit expenses will be drawn from the Amrut administrative fund, subject to the Centre's approval. If denied, the state will bear the cost separately. A senior NMC official said MJP earlier engaged a third-party auditor, but the audit contract ended—triggering the current process to appoint a new agency. However, critics argue the govt has been slow to act, allowing poor-quality work to continue unchecked for months. As the mission enters its crucial final stretch, the govt's move to institutionalise independent technical scrutiny may be the only way to salvage public confidence and ensure taxpayer money doesn't go down the drain—literally.