logo
Kerala Lottery Result Today 10-07-2025 LIVE: Karunya Plus KN-580 Bumper Thursday Lucky Draw OUT At 3 PM- 1 Crore First Prize, Check Full Winners List

Kerala Lottery Result Today 10-07-2025 LIVE: Karunya Plus KN-580 Bumper Thursday Lucky Draw OUT At 3 PM- 1 Crore First Prize, Check Full Winners List

India.com10-07-2025
LIVE Blog
Kerala Lottery Results Thursday 10-07-2025 LIVE: The Kerala Lottery Department, on behalf of the Keralan government, announces the "Karunya KN-580" Lucky Draw Result today Karunya KN-580, July 10, 2025. The draw will be held at Gorky Bhavan near Bakery Junction in Thiruvananthapuram. The Kerala Lottery Result 2025 for "Karunya KN-580" will feature 12 series, with changes in series possible each week. A total of 108 lakh tickets are available for purchase weekly. The ticket prices may vary. Check the Karunya KN-580 results right here to see if you're the first-place winner of ₹1 Crore. Stay tuned to this website for the live update of Kerala Lottery Karunya KN-580 results today. Kerala Lottery Result 10-07-2025 July: FULL LIST OF WINNING NUMBERS FOR KARUNYA PLUS KN-580 Draw
LUCKY TICKET NUMBER FOR 1ST PRIZE OF RS 1 Crore IS: To Be Announced
LUCKY TICKET NUMBER FOR 2ND PRIZE OF RS 30 LAKHS IS: To Be Announced
LUCKY TICKET NUMBERS FOR 3RD PRIZE OF RS 5 LAKHS ARE: To Be Announced
LUCKY TICKET NUMBERS FOR CONSOLATION PRIZE OF RS 5000 ARE: To Be Announced
(For The Tickets Ending with The Following Numbers below)
LUCKY TICKET NUMBERS FOR 4TH PRIZE OF RS 5,000 ARE: To Be Announced
LUCKY TICKET NUMBERS FOR 5TH PRIZE OF RS 2000 ARE: To Be Announced
LUCKY TICKET NUMBERS FOR 6TH PRIZE OF RS 1000 ARE: To Be Announced
LUCKY TICKET NUMBERS FOR 7TH PRIZE OF RS 500 ARE: To Be Announced
LUCKY TICKET NUMBERS FOR 8TH PRIZE OF RS 200 ARE: To Be Announced
LUCKY TICKET NUMBERS FOR 9TH PRIZE OF RS 100 ARE: To Be Announced KERALA LOTTERY RESULT TODAY 10-07-2025 July: KARUNYA PLUS KN-580 LOTTERY PRIZE DETAILS
1st Prize: Rs 80 Lakhs 2nd Prize: Rs. 10 lakhs 3rd Prize: Rs. 1 Lakh 4th Prize: Rs. 5,000 5th Prize: Rs. 1,000 6th Prize: Rs. 500 7th Prize: Rs. 100
Consolation Prize: Rs. 8,000
(NOTE: Lottery can be addictive and should be played responsibly. The data provided on this page is for informational purposes only and should not be construed as advice or encouragement. Zee News does not promote lottery in anyway.) Stay Tuned To Zee News For Live And Latest Updates On Kerala Lottery Result 2025
Stay informed on all the latest news, real-time breaking news updates, and follow all the important headlines in india news and world News on Zee News.
Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

UP govt launches programme to enrol out-of-school kids
UP govt launches programme to enrol out-of-school kids

Time of India

time3 hours ago

  • Time of India

UP govt launches programme to enrol out-of-school kids

Prayagraj: In a bid to ensure that no child is left behind in education, the Uttar Pradesh govt has launched an ambitious programme to identify and enrol out-of-school and dropout children aged between 6 and 14 years into age-appropriate classes. The initiative, spearheaded under the Sharda Programme, will offer special training to help these children catch up with their peers. School education director general Kanchan Verma has directed that the training of these children will commence on Aug 1 and continue until March 31, 2026. To make this mission effective, volunteers will be appointed to motivate children and reignite their interest in learning. Special training will be offered in areas where more than five out-of-school children are identified. Retired teachers or qualified volunteers will be selected as special instructors, and in their absence, nodal teachers from the local schools will conduct the training. According to basic shiksha adhikari (BSA) Devbrat Singh, children enrolled at these special centres will receive the same facilities as regular students. A temporary selection process will be carried out for instructors, and a district-level advertisement will be issued to invite applications. by Taboola by Taboola Sponsored Links Sponsored Links Promoted Links Promoted Links You May Like If you have a mouse, play this game for 1 minute Navy Quest Undo Applicants must be residents of the same panchayat where the school is located and should be aged between 21 and 45 years. The selection will be merit-based, calculated through the average percentage of marks obtained in High School, Intermediate, Graduation and relevant teaching qualifications like DElEd, BTC or BEd. In the absence of professionally trained candidates, the merit will be prepared based on the academic marks alone. Retired teachers will be given preference. Selected volunteers will receive an honorarium of Rs 4,000 per month. A four-member subcommittee, comprising the school management committee's president, vice president, member secretary (headmaster-in-charge), and a parent member, will oversee the selection process. The selection process is to be completed before July 31. As many as 68,913 out-of-school children have been identified across UP. In Prayagraj alone, the number stands at 1,263 while in Pratapgarh it is 448, Amethi 333, and in the state capital Lucknow, 742 children will receive special training. The total number of special training centres in the state is 22,044, with Prayagraj hosting 411 of them. Nearby districts like Pratapgarh and Kaushambi will have 208 and 224 centres respectively. The basic education department has instructed that volunteer recruitment advertisements be displayed at panchayat buildings, secretariats, schools and other public spaces. This outreach aims to ensure community participation in bringing every child back to school and shaping a literate and empowered future.

Wayanad, one year on: Gaps remain in post-landslide support
Wayanad, one year on: Gaps remain in post-landslide support

Time of India

time4 hours ago

  • Time of India

Wayanad, one year on: Gaps remain in post-landslide support

Kozhikode: A year after the devastating Chooralmala–Mundakkai landslide in Wayanad, a ground-level review of post-landslide interventions by NGO People's Foundation, which was also active in relief and rehabilitation efforts, presents a mixed picture. It acknowledges the state's efforts in terms of rental and livelihood handouts and ensuring continuity in sectors like education, but cites critical gaps in long-term rehabilitation. The independent survey was conducted using GPS mapping and direct interviews with 552 landslide survivors, and this data was later correlated with local govt records and satellite survey data. It identifies 586 inhabited infrastructure units in the Mundakkai-Chooralmala region affected by the landslide, as against the 402 beneficiaries identified by the govt for the township project. "While the govt response has reached most affected families (almost 70%), a significant proportion — especially from marginalised groups and those relying on rented or under-construction dwellings — remain unsupported," it says. A majority of affected families (91.3%) are now residing in rental accommodation, and 83.3% of these families are receiving rental assistance of Rs 6,000 from the govt. However, over 56% of these families pay more than what the govt provides as rent, and 6% pay double the amount due to higher rates in the area. Over 88.2% of victim families receive some form of assistance, with the majority (71%) receiving the Rs 300 daily assistance for each of two family members and 17.2% receiving it for one family member. However, 11.8% of families don't get this due to documentary issues, eligibility criteria or administrative oversight. The survey finds that 30.2% of families in the region have at least one member wounded in the disaster, and only 49.6% of those wounded have fully recovered. Govt assistance for follow-up treatment reaches only 26% of families with wounded members. The review also points to economic distress, with over 75% of families in a precarious situation — 56.1% with just one earning member and 19.6% without any earning member. It finds that 41.3% were forced to change jobs post-disaster. Mental health remains another concern, with around 58% of respondents experiencing post-disaster psychological issues, ranging from sleep discomfort to anxiety and depression. At least 8.3% of them had no psychological support. The one area of notable continuity has been education. As the two displaced schools at Meppadi were reopened soon, 80.9% of students continued without disruption. Still, 18.2% had to change schools, and 2% have dropped out.

Water storage in Isarda dam from July 30
Water storage in Isarda dam from July 30

Time of India

time7 hours ago

  • Time of India

Water storage in Isarda dam from July 30

Bhilwara: With construction of the Isarda dam project on the Banas River nearing completion, the irrigation department has issued orders for starting water storage from July 30. As per the initial plan, preparations are on to have the dam filled up to 3.27 TMC (thousand million cubic feet) out of its 10.77 TMC capacity. Constructed at a cost of Rs 615 crore, Isarda dam will supply water to seven towns and 1,256 villages in Dausa and Sawai Madhopur districts. It is the second largest in Tonk district after Bisalpur, which has a capacity of 38.800 TMC. Strategically positioned between Banetha and Isarda villages on the Tonk-Sawai Madhopur border, the dam features a 600-metre concrete structure with 28 gates. Water levels can reach a height of 262 RL metres, addressing the water needs of the region. Despite multiple deadline extensions, the dam is now completed nearly 95%. Keeping the monsoon rains in view, the Water Resources Department has ordered that from July 30, water will be stored in phases in the Isarda dam until Sept 15, marking a significant milestone for the project. Executive engineer of the Isarda Dam Project, Vikas Garg, told TOI, "Now, water is released daily from two gates of the Bisalpur Dam into the Banas River. The irrigation department in Jaipur has issued orders to stop water in the Isarda dam in phases until Sept 15. For the first time, water will be retained in the dam starting July 30, and we are fully prepared to do so." The dam is a critical part of the Eastern Rajasthan Canal Project (ERCP), with plans to channel water from Isarda to the Ramgarh dam.

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into a world of global content with local flavor? Download Daily8 app today from your preferred app store and start exploring.
app-storeplay-store