
Newport High School: plans for new security fence approved
The school, which also houses the Active Living Centre, is located on Bettws Lane in the Bettws ward.
The planning application, numbered 25/0270, was considered under a range of policy frameworks, including Future Wales: The National Plan 2040, Planning Policy Wales (Edition 12) 2024, and the Newport Local Development Plan 2011–2026.
Thirty-five neighbouring properties were notified of the proposal, with no objections received.
A site notice was also posted on April 18, 2025.
The Landscape Officer observed the potential for a visual impact but did not object due to the small scale of the proposal.
No response was received from Ecology officers.
The application was granted with conditions.
These conditions include that the development must be carried out in accordance with submitted plans, and a scheme for ecological enhancement must be submitted and approved before commencement.
The new fencing is designed to increase security at the school, enclosing a small area at the front of the main reception.
While there was some concern about the visual impact, the school's large building is expected to offset any negative effects.
The application was also assessed for its impact on residential amenity, with no negative effects anticipated due to the lack of direct impact on residential properties.
The proposal was also deemed to have no direct ecological impact.
However, an enhancement scheme, which could include the installation of a bird box, is required as part of the conditions for approval.
Hashtags

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles

South Wales Argus
3 days ago
- South Wales Argus
Newport High School: plans for new security fence approved
The plans, submitted by M. Legge, propose enclosing a 4.4 square metre area at the front of the school's main reception with 2.4-metre-high green powder-coated weldmesh fencing and double access gates. The school, which also houses the Active Living Centre, is located on Bettws Lane in the Bettws ward. The planning application, numbered 25/0270, was considered under a range of policy frameworks, including Future Wales: The National Plan 2040, Planning Policy Wales (Edition 12) 2024, and the Newport Local Development Plan 2011–2026. Thirty-five neighbouring properties were notified of the proposal, with no objections received. A site notice was also posted on April 18, 2025. The Landscape Officer observed the potential for a visual impact but did not object due to the small scale of the proposal. No response was received from Ecology officers. The application was granted with conditions. These conditions include that the development must be carried out in accordance with submitted plans, and a scheme for ecological enhancement must be submitted and approved before commencement. The new fencing is designed to increase security at the school, enclosing a small area at the front of the main reception. While there was some concern about the visual impact, the school's large building is expected to offset any negative effects. The application was also assessed for its impact on residential amenity, with no negative effects anticipated due to the lack of direct impact on residential properties. The proposal was also deemed to have no direct ecological impact. However, an enhancement scheme, which could include the installation of a bird box, is required as part of the conditions for approval.

South Wales Argus
27-05-2025
- South Wales Argus
Plans submitted to revamp Eveswell Community Centre
Eveswell Community Centre will undergo a series of upgrades, including new roof canopies, improved windows and doors, and a solar panel installation, all while maintaining its current use as a community facility. The project is spearheaded by Paul Hackwood, of TocH, and managed by Town & Country Planning Advisors Ltd. The updates aim to significantly enhance the building's energy efficiency and lifespan. The centre will be fitted with external insulation and composite cladding featuring a timber-effect finish, and all existing windows and doors will be replaced with high-performance aluminium units. A new insulated metal roof will be installed, complemented by sections of a sedum green roof, which is expected to bolster the building's sustainability credentials. Two new entrance canopies are also part of the refurbishment. The roof-mounted solar photovoltaic array, with a capacity of 4.8kW, is expected to provide a portion of the building's electricity needs, reducing its carbon footprint. The refurbishment package also includes works such as infrared-controlled external lighting, CCTV, rainwater goods, and decorative aluminium covers over some of the concrete fixings. The community centre is easily accessible from Eveswell Street and Archibald Street, being on a corner plot in the residential area. The site is designated as Flood Zone 3 (Sea); however, the development is classified as low vulnerability, and the sedum roof is expected to assist with drainage. Officials noted that the development would not lead to any change in the building's footprint or increase its vulnerability to flooding. The centre has no previous planning applications, appeals, or enforcement records. The revamp is aligned with both national and local planning policies, including Future Wales – The National Plan 2040 and the Newport Local Development Plan 2011–2026. The improvements are anticipated to support the continued use and regeneration of the community centre, enhancing its utility for local groups and services. Construction is expected to commence within five years, adhering to the submitted plans, if they are approved.

South Wales Argus
12-05-2025
- South Wales Argus
Objections to 26 homes plan for Traston Lane in Newport
The proposed development at Traston Lane, Newport, is being brought forward by Wellspring Homes and includes a mix of one, two, and three-bedroom homes. The plans also include new access via Traston Road, landscaping, a new pumping station, and various sustainability features such as the use of hempcrete for construction. The site has been identified as a housing commitment area in the Newport Local Development Plan (LDP). However, ward Councillor James Peterson has voiced strong opposition to the scheme, citing concerns from the community. His objections include worries over flooding, with fears that the development could worsen the situation due to the raising of ground levels. The site is located within Flood Zone C2, and the plans have taken this into account with floor levels set to be raised. Concerns have also been raised about the current sewerage infrastructure, which is already at capacity. Residents fear this will lead to more overflows. Councillor Peterson is also worried about potential issues from the new pump station, including noise and smell, and has raised questions about its maintenance and access plans. Traffic is another major concern, with an estimated 26% increase expected. This has led to worries about the condition of Traston Road and congestion near local schools. There are also concerns about the impact on 400-year-old oak trees, with fears that root protection measures are not adequate. Other objections include fears about the devaluation of property due to the affordable housing, and what the councillor describes as "planning fatigue". This is due to the ongoing applications over 32 years, which he says have caused repeated distress to residents. Despite these objections, Gwent Police have raised no issues with the application, based on current crime levels. The development area has been assessed as a low crime risk, and recommendations for security have been given. The final decision on the application is yet to be made, with the application currently under consideration by planners.