
Honda's Anna Engine Plant Celebrates 40-Year Milestone
How two of the most popular electric SUVs for 2025 stack up across range, charging, technology, utility, and value.
Honda's Anna Engine Plant has built more than 30 million engines
Honda's Anna Engine Plant (AEP) celebrated 40 years of building engines and components for both foreign and domestic production on July 22nd. Located a stone's throw from the Village of Anna, the facility has expanded from a mere 200,000 square feet with 94 employees in 1985 to a massive 2.8 million square-foot campus that employs 2,900 people. Since its founding, AEP has built more than 32.5 million engines, as well as miscellaneous powertrain components. Going forward, AEP will play a major role in the automaker's electrified efforts by producing combustion engines, hybrid powertrains, and EV components on the same lines.
Honda Anna Engine Plant produces 30-millionth engine —
Source: Honda
Anna Engine Plant is responsible for several notable engines
AEP officially began operating in 1985, with motorcycle engines christening the new production facility. The engine plant expanded to automotive engine production the following year, starting with the Honda Civic's four-cylinder engine. Since then, the facility has produced more than 32.5 million engines, as well as various components for engines and transmissions.
Anna Engine Plant associates assemble Honda's Atkinson-cycle hybrid engine —
Source: Zac Palmer
The 2.8 million square-foot production facility is the result of $2.9 billion in investments over the past forty years. In that time, AEP has produced several notable engines, including the 2.0-liter four-cylinder engine that's under the hood of the hybrid Civic, Accord, and CR-V. The engine plant also produces the turbocharged four-cylinder and V6 engines that power the Acura Integra, TLX, and MDX Type S models.
AEP even produces the Honda Civic Type R's 315-horsepower 2.0-liter turbocharged four-cylinder engine. From there, the engine is exported to Japan, where the hot hatch is assembled. The facility is also responsible for the 500-horsepower 3.5-liter twin-turbo V6 engine that powered the second-gen Acura NSX.
Anna Engine Plant will play a crucial role in Honda's EV plans
Honda already has a couple of EVs in its lineup, namely the Prologue and Acura ZDX, but the Japanese automaker is gearing up for expansion. In total, the company plans to invest $1 billion to retool its automotive production facilities, including the Marysville Auto Plant, East Liberty Auto Plant, and AEP, as part of the new Honda EV Hub. Once retooling is completed, AEP will add megacasting, friction stir welding, and Minimum Quantity Lubrication machining to its long list of production processes. The engine plant will play a vital role in the Honda EV Hub by producing the battery case used in Honda and Acura EVs.
2025 Honda Prologue Elite —
Source: Honda
Once EV production begins, the battery case created at AEP will be shipped off to the Marysville Auto Plant. There, it will be combined with the battery module to create the EV battery packs that power vehicles assembled at the Marysville and East Liberty Auto Plants. Notably, the production facilities will continue to produce traditional internal combustion engines and hybrid models alongside their EV counterparts.
Honda is doing more than simply equipping their existing production facilities for EV production, though. The company is aiming to rethink the production process entirely, with a focus on worker-friendly practices, environmental responsibility, and efficiency. Once completed, the Honda EV Hub will produce the Acura RSX EV and other models from the Honda 0 Series that debuted at CES 2025.
2024 Acura ZDX Type S —
Source: Acura
'We're not just retooling for electric vehicles,' Tim Stroh, Senior Program Manager of Production Engineering and Battery Case Project Leader at AEP, told Peak of Ohio. 'We are fundamentally rethinking how we approach production. The new layout is designed to be more human-friendly, with updated workspaces and processes that improve safety and efficiency. The addition of electric vehicle production capabilities requires not only new machinery but also a re-imagining of how we work together on the assembly line.'
Honda has been operating in Ohio since 1979
While the Anna Engine Plant is celebrating 40 years, it wasn't the automaker's first manufacturing facility in Ohio. Honda's Marysville Auto Plant started out building motorcycles in 1979 before moving to automobile production in 1982. Today, Honda has five manufacturing facilities and is the largest employer in Ohio, with more than 12,000 employees on record.
Source: Acura
In addition to its five existing facilities, Honda is also establishing a new EV Hub to support the automaker's electrified efforts. Honda also plans to invest another $3.5 billion in a new EV battery plant in Fayette County, Ohio, as part of its joint venture with LG Energy Solution.
'Everything that Honda has accomplished at the Anna Engine Plant during the past 40 years has been achieved through the skills and commitment of our associates, and this will continue as we pursue an expanded form of flexible manufacturing in the future,' said Michael Tinch, AEP plant lead. 'As we maximize production of ICE and hybrid models, even while preparing for the future of EV production, I know our associates will continue to produce high-quality products that meet the needs of our customers.'
2023 Honda Civic Hatchback —
Source: Joseph Pudlewski
Final thoughts
As an Anna local, I'm grateful to have the Honda engine plant in our area. It's definitely a unique part of the view from my front porch. On a more serious note, their involvement in the community, schools, and events can't be understated. With the automaker investing further into the plant's future, electrified or otherwise, I have little doubt that it will change anytime soon.
About the Author
Joseph Pudlewski View Profile

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


Reuters
8 minutes ago
- Reuters
Hims and Hers beats quarterly profit on steady subscription growth
NEW YORK, Aug 4 (Reuters) - Hims and Hers Health (HIMS.N), opens new tab beat Wall Street estimates for second-quarter profit on Monday, aided by continued subscription growth and surging volume in the telehealth company's weight-loss business. The company reported a quarterly profit of 17 cents per share, higher than the average analyst estimate of 15 cents, according to LSEG data. However, shares fell about 10% in extended trading as quarterly revenue of $544.8 million missed analysts' average expectation of $551.6 million.


Reuters
9 minutes ago
- Reuters
Vertex to stop developing new painkiller as solo treatment after mid-stage study setback
Aug 4 (Reuters) - Vertex Pharmaceuticals (VRTX.O), opens new tab said on Monday it will not continue development of its experimental non-opioid painkiller as a solo treatment after it failed to meet the main goal of a mid-stage trial. The next-generation drug, called VX-993, was found to be generally safe when tested in patients who had a bunion surgery, with most side effects being mild to moderate and no serious problems linked to the painkiller, the company said. Wall Street analysts and investors have been eagerly awaiting the results of this trial that would help Vertex expand beyond its non-opioid Journavx, bolstering its pain drug treatments.


Reuters
10 minutes ago
- Reuters
Exclusive: Fed's Daly says time is nearing for rate cuts, may need more than two
Aug 4 (Reuters) - San Francisco Federal Reserve Bank President Mary Daly on Monday said that given mounting evidence that the U.S. job market is softening and no signs of persistent tariff-driven inflation, the time is nearing for interest rate cuts. "I was willing to wait another cycle, but I can't wait forever," Daly said of the Fed's decision last week to leave short-term borrowing costs in their 4.25%-4.50% range rather than cut them, as a couple of her colleagues wanted and as President Donald Trump has demanded. While that doesn't mean a September rate cut is a lock, she said, "I would lean to thinking that every meeting going forward is a live meeting to think about these policy adjustments." The two quarter-point interest-rate cuts that Fed policymakers back in June penciled in for this year still "look to be an appropriate amount of recalibration, and less important is, does it happen in September and December than does it happen at all kinds of permutations to get those two cuts." Daly said there is still plenty of data including a couple of labor market and inflation reports due out before the Fed's policy-setting meeting, in September, and she's keeping an open mind. "We of course could do fewer than two (rate cuts) if inflation picks up and spills over or if the labor market springs back," Daly said. But "I think the more likely thing is that we might have to do more than also should be prepared in my judgment to do more if the labor market looks to be entering that period of weakness and we still haven't seen spillovers to inflation." A Labor Department report Friday showed U.S. employers added just 73,000 jobs last month, and massive revisions to previously reported data showed only 33,000 jobs were added in the two prior months. Those figures, to Daly's mind, don't mean the job market is precariously weak - in times of economic flux, she said, raw employment numbers are often less informative than ratios like the unemployment rate, which ticked up just a tenth of a percentage point in July to 4.2%. Still, she said, looking at a broad dashboard of labor-market measures, there is "evidence after piece of evidence" that the labor market is softening quite a bit compared to last year. "I would see further softening as an unwelcome result," she said. "I'm comfortable with the decision we made in July, but I am increasingly less comfortable with making that decision again and again." At the same time, she said, there's no evidence that tariff-driven price increases are seeping more broadly into inflation, and if the Fed waits long enough to be certain it won't -- a process that could take six months or a year, she said - the Fed will "for sure" be too late to move. The Fed is approaching a "tradeoff space where you are trying to make a judgment about where does policy need to be to continue to put downward pressure on inflation, and where does it need to be to continue to make sure that sustainable employment can be achieved," she said. "That's why I didn't think that July was a necessary change, but I do think, increasingly, policy is not aligned."