logo

Public Notice - Mont Sorcier Mining Project

Cision Canada3 days ago
Comments Invited on the Draft Tailored Impact Statement Guidelines and Draft Public Participation Plan
What is happening?
OTTAWA, ON, July 17, 2025 /CNW/ - The Joint Assessment Committee (the Joint Committee), comprising of representatives from the Impact Assessment Agency of Canada (IAAC) and the Cree Nation Government, is conducting a federal impact assessment for the proposed Mont Sorcier Mining Project, a new open-pit iron and vanadium mine, located in the Eeyou Istchee James Bay Territory, in Quebec.
As part of the planning phase in the federal impact assessment process, the Joint Committee invites Indigenous Peoples and the public to review and provide feedback on the draft Tailored Impact Statement Guidelines (draft Guidelines) and the draft Public Participation Plan (draft Plan).
The draft Guidelines outline the specific factors to be considered in the assessment of the project and provide direction to the proponent, Voyager Metals Inc., on the studies and information required in its Impact Statement. The draft Plan explains how the public will be engaged throughout the review process and provides details on how and when public participation opportunities will take place for each phase of the impact assessment.
How can I participate?
Comments should be submitted online by visiting the project home page on the Canadian Impact Assessment Registry (reference number 84616). The draft Guidelines and the draft Plan are also available on the Registry. Participants who wish to provide their input in a different format can contact IAAC by writing to [email protected].
Submit your comments online by 11:59 p.m. on August 16, 2025. All comments received will be published online as part of the project file.
Stay updated on this project by following IAAC and the Cree Nation Government on X: @IAAC_AEIC @gcccra, #MontSorcier or sign-up for notifications on the Canadian Impact Assessment Registry.
What is the proposed project?
Voyager Metals Inc. is proposing the construction, operation, decommissioning, and closure of an open-pit iron and vanadium mine located in the Eeyou Istchee James Bay Territory, in the municipality of Chibougamau, about 20 kilometres northeast of the Town of Chibougamau, Quebec, in the traditional Cree territory. As proposed, the Mont Sorcier Mining Project would include a pit and the construction of an ore processing facility. The proponent also plans to build a 49-kilometre railroad that would connect to the existing track to transport the concentrate by train to the Grande-Anse Marine Terminal, where it would be stockpiled for export purposes. The mine's production capacity would be about 5 million tonnes per year (average rate of 13,700 tonnes/day) and the estimated life of the project would be 21 years.
Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

Public Notice - Mont Sorcier Mining Project
Public Notice - Mont Sorcier Mining Project

Cision Canada

time3 days ago

  • Cision Canada

Public Notice - Mont Sorcier Mining Project

Comments Invited on the Draft Tailored Impact Statement Guidelines and Draft Public Participation Plan What is happening? OTTAWA, ON, July 17, 2025 /CNW/ - The Joint Assessment Committee (the Joint Committee), comprising of representatives from the Impact Assessment Agency of Canada (IAAC) and the Cree Nation Government, is conducting a federal impact assessment for the proposed Mont Sorcier Mining Project, a new open-pit iron and vanadium mine, located in the Eeyou Istchee James Bay Territory, in Quebec. As part of the planning phase in the federal impact assessment process, the Joint Committee invites Indigenous Peoples and the public to review and provide feedback on the draft Tailored Impact Statement Guidelines (draft Guidelines) and the draft Public Participation Plan (draft Plan). The draft Guidelines outline the specific factors to be considered in the assessment of the project and provide direction to the proponent, Voyager Metals Inc., on the studies and information required in its Impact Statement. The draft Plan explains how the public will be engaged throughout the review process and provides details on how and when public participation opportunities will take place for each phase of the impact assessment. How can I participate? Comments should be submitted online by visiting the project home page on the Canadian Impact Assessment Registry (reference number 84616). The draft Guidelines and the draft Plan are also available on the Registry. Participants who wish to provide their input in a different format can contact IAAC by writing to [email protected]. Submit your comments online by 11:59 p.m. on August 16, 2025. All comments received will be published online as part of the project file. Stay updated on this project by following IAAC and the Cree Nation Government on X: @IAAC_AEIC @gcccra, #MontSorcier or sign-up for notifications on the Canadian Impact Assessment Registry. What is the proposed project? Voyager Metals Inc. is proposing the construction, operation, decommissioning, and closure of an open-pit iron and vanadium mine located in the Eeyou Istchee James Bay Territory, in the municipality of Chibougamau, about 20 kilometres northeast of the Town of Chibougamau, Quebec, in the traditional Cree territory. As proposed, the Mont Sorcier Mining Project would include a pit and the construction of an ore processing facility. The proponent also plans to build a 49-kilometre railroad that would connect to the existing track to transport the concentrate by train to the Grande-Anse Marine Terminal, where it would be stockpiled for export purposes. The mine's production capacity would be about 5 million tonnes per year (average rate of 13,700 tonnes/day) and the estimated life of the project would be 21 years.

Public notice - Centre Village Renewables Integration and Grid Security Project
Public notice - Centre Village Renewables Integration and Grid Security Project

Cision Canada

time4 days ago

  • Cision Canada

Public notice - Centre Village Renewables Integration and Grid Security Project

Participant Funding Available OTTAWA, ON, July 16, 2025 /CNW/ - Funding provided by the Impact Assessment Agency of Canada (IAAC) is now available to help Indigenous Peoples and the public participate in the impact assessment process for the proposed Centre Village Renewables Integration and Grid Security Project, a new electricity generation facility, located in Centre Village, near Sackville in southeastern New Brunswick. Funding is available for eligible individuals and groups to support their participation throughout the planning phase of the federal impact assessment process. During the current comment period, which ends on August 1, 2025, Indigenous Peoples and the public are invited to review the summary of the Initial Project Description and provide comments. IAAC will retroactively reimburse eligible participants for their participation costs in this first comment period. Applications received by August 15, 2025, will be considered. For more information about the Participant Funding Program, including eligibility criteria and the application form, please visit the project home page on the Registry website, reference number 89719, and click on "Participant Funding." You can also contact the Participant Funding Program by writing to [email protected] or by calling 1-866-582-1884. Details about the project can also be found on the project home page.

Public Notice - Centre Village Renewables Integration and Grid Security Project Français
Public Notice - Centre Village Renewables Integration and Grid Security Project Français

Cision Canada

time6 days ago

  • Cision Canada

Public Notice - Centre Village Renewables Integration and Grid Security Project Français

Comments Invited and Information Sessions on the Summary of the Initial Project Description What is happening? OTTAWA, ON, July 14, 2025 /CNW/ - WattBridge Energy IPP Holdings LLC, a subsidiary of PROENERGY Holding Company Inc., is proposing the Centre Village Renewables Integration and Grid Security Project, a new electricity generation facility, located in Centre Village, near Sackville, in southeastern New Brunswick. The Impact Assessment Agency of Canada (IAAC) invites Indigenous Peoples and the public to review the summary of the Initial Project Description and provide comments on the proposed project. This feedback will help IAAC prepare a summary of issues that will be given to the proponent. How can I participate? Comments should be submitted online by visiting the project home page on the Canadian Impact Assessment Registry (reference number 89719). The summary of the Initial Project Description is also available on the Registry. Participants who wish to provide input in a different format can contact IAAC by writing to [email protected]. Submit your comments online by 11:59 p.m. on August 1, 2025. All comments received will be published online as part of the project file. Participant funding will be available to eligible participants during this comment period and details will be announced shortly on the Registry. IAAC will retroactively reimburse eligible participants for their participation costs in this first comment period. Virtual Information Sessions IAAC invites Indigenous Peoples and the public to attend an information session via Zoom to learn more about the project, the impact assessment process, and how to submit comments on the summary of the Initial Project Description. July 21, 2025, from 6:30 p.m. to 8:00 p.m. ADT (English) July 22, 2025, from 1:30 p.m. to 3:00 p.m. ADT (English) July 22, 2025, from 6:30 p.m. to 8:00 p.m. ADT (French) For information on how to attend a session, please visit the project home page on the Registry and click on " Information Sessions" If you have any questions, please contact IAAC using the project email above. What is the proposed project? WattBridge Energy IPP Holdings LLC, a subsidiary of PROENERGY Holding Company Inc., is proposing to construct, operate and decommission the Centre Village Renewables Integration and Grid Security Project, a new electricity generation facility, located in Centre Village, near Sackville, in southeastern New Brunswick. As proposed, the project would have capacity to generate up to 500 megawatts of electricity using gas turbines and would operate as needed to maintain system reliability and provide back-up energy generation. The project is expected to operate for about 25 years.

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into a world of global content with local flavor? Download Daily8 app today from your preferred app store and start exploring.
app-storeplay-store