
URA Draft Master Plan: Developing Bishan as business node rivalling Paya Lebar Central being studied, Singapore News
Plans to develop Bishan into a business node like Paya Lebar Central are being studied under the Urban Redevelopment Authority (URA) Draft Master Plan (DMP) 2025.
In a video posted to Facebook on Thursday(June 26), Minister for National Development and Bishan-Toa Payoh GRC MP Chee Hong Tat stated this will make it easier for to Bishan and Marymount residents to travel to work.
"This means new office spaces (in Bishan) that could match the scale of Paya Lebar Central — around 200,000sq m — bringing workplaces closer to where you live," he said.
Other projects for Bishan-Toa Payoh GRC under DMP 2025 include a new hawker centre, which will be integrated with the revamped Bishan bus interchange, as well as a Bishan Polyclinic.
"Works for these new developments will start within this term, and will take several years to complete," said Chee.
Moreover, completed cycling paths in Bishan Town Centre will allow easier access to upcoming recreational spaces like the North-South Corridor and Kallang River and a pedestrian mall linked to transport hubs and community facilities will be built at Bishan Place Road.
An "active street" for residents to walk and cycle along Bishan Road to Bishan-Ang Mo Kio Park is also in the works, the minister said.
He concluded the video by inviting residents of the GRC to visit the DMP 2025 exhibition when it is displayed at Toa Payoh HDB Hub from Aug 9 to 17.
[[nid:719436]]
bhavya.rawat@asiaone.com
Hashtags

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


CNA
16 hours ago
- CNA
Money Mind 2025/2026 - Still Rock Solid?
23:00 Min With prices of diamonds falling, is now a good time to buy one as an investment? Multiplying your business from one to seven shops, all by the age of 30. Plus, how to fangirl on a budget. Money Mind 2025/2026 About the show: Money Mind tells you how to make the most of your money with tips for investors, business ideas for businessmen and analysis of the economy, companies, markets, financial products and trends.

Straits Times
a day ago
- Straits Times
Underground tank to prevent flooding in low-lying Jalan Besar area completed
Located next to Rochor Canal, the Syed Alwi Pumping Station is designed to divert storm water from the upstream of Rochor Canal into an underground tank. ST PHOTO: BRIAN TEO SINGAPORE – The low-lying Jalan Besar area and parts of Little India are now better protected against floods with the completion of a new pumping station with an underground tank along Syed Alwi Road. Located next to Rochor Canal, the Syed Alwi Pumping Station is designed to divert storm water from the upstream of Rochor Canal into an underground tank. The water is then pumped out of the tank – which is able to hold about 9,300 cubic m of water, or about the total capacity of four Olympic-size pools – into a downstream section of Rochor Canal during and after storms. This ensures that storm drains, which collect rainwater run-off from the Jalan Besar area, are not overwhelmed during intense rain when the water level in the canal is high. The completion of the underground tank was announced by Minister for Sustainability and the Environment Grace Fu in a recorded address at the 2025 Singapore International Water Week Spotlight conference on June 23. 'As ground raising is not possible in (Jalan Besar), the dual-purpose storage and pumping station was conceptualised as an alternative solution to enhance flood resilience,' she said in the video, which was aired at the event held at the Singapore Expo. National water agency PUB, which built the $33 million pumping station, said it 'forms part of PUB's diverse storm water management infrastructure to strengthen Singapore's flood resilience as climate change brings about more frequent and intense rainfall'. The fully automated pumping station, which was completed in June, also has floodgates at the Syed Alwi Road drains that shut to prevent backflow of water from Rochor Canal into the Jalan Besar area. Construction of the Syed Alwi Pumping Station began in 2021, with most of the costs covered by Singapore's Coastal and Flood Protection Fund. The fund, which was set up with an initial injection of $5 billion in 2020, received an additional injection of $5 billion from Budget 2025, to fund both coastal protection and drainage infrastructure. Jalan Besar is a low-lying area that experienced flooding from the 2000s to 2010s. The last time it experienced a flooding incident was on Nov 13, 2014, said PUB. Among the efforts made to combat flooding in the area were the upgrading of drains along Syed Alwi Road and raising road levels in 2014. Rochor Canal, which runs along Sungei Road and Rochor Canal Road towards Marina Reservoir, was also widened and deepened in 2015 to increase its drainage capacity. These measures enhanced flood protection in nearby areas such as Veerasamy Road, Hindoo Road and Desker Road. However, expanding drainage infrastructure and raising ground levels are not feasible for all sites, said Ms Gayathri Kalyanaraman, senior principal engineer for drainage planning at PUB's catchment and waterways department. 'The low-lying Jalan Besar area illustrates this challenge,' she said. It is not possible to raise roads and buildings in the area, which has many heritage buildings such as Masjid Angullia and the shophouse at 75 Maude Road. This is where the new pumping station comes in – enhancing the area's flood resilience. Storm water will accumulate in the underground tank, which is 11m high and has the capacity of four Olympic-sized pools and can hold about 9,300 cu m of water. ST PHOTO: BRIAN TEO When the water level in the tank reaches 4.5m, the pumps will be automatically activated to discharge water into Rochor Canal via two outlets. When the water level is below 4m, the water will be discharged by two other smaller pumps into the canal. ST PHOTO: BRIAN TEO Two other pumping stations, built in the 1990s, enhance flood resilience in the low-lying Tanjong Katong estate. Despite its efforts to enhance Singapore's drainage infrastructure, 'absolute protection is not possible, and building community resilience is key', said PUB. Stakeholders such as building owners and contractors can ensure proper maintenance of internal drainage systems, and implement flood protection measures according to stipulated guidelines to better protect their properties, it added. Meanwhile, the Syed Alwi Pumping Station has brought more verdancy to the Rochor area, with features like a green roof and green wall. Coming up next to it is an open plaza that will provide a recreational space integrated with nearby Build-To-Order development King George's Heights, which is under construction. As part of efforts to protect Singapore's coasts from sea-level rise, the Republic has divided its coastline into eight stretches, and is conducting separate studies on them to determine the most suitable ways to protect each stretch from future rising seas. Where possible, these solutions will be multifunctional, enhancing the environment and supporting better land use, said Ms Fu. She added that PUB will soon launch a risk assessment study to evaluate eight offshore islands' vulnerability to sea-level rise. This is an expansion of the work being done on the mainland, and more details will be revealed in a few days. Additional reporting by Shabana Begum Join ST's WhatsApp Channel and get the latest news and must-reads.

Straits Times
a day ago
- Straits Times
S'pore's age is showing in its latest draft masterplan – and that's a good thing
News analysis S'pore's age is showing in its latest draft masterplan – and that's a good thing SINGAPORE – Hanging in the atrium and pasted on the glass walls of The URA Centre in Maxwell Road are portraits of people – members of the public, activists, architects and others who call Singapore home. Some of them were among nearly 220,000 people who took part in a months-long exercise to put together a new blueprint that will chart the country's development for the next 10 to 15 years. Unveiled by the Urban Redevelopment Authority (URA) on June 25, in Singapore's 60th year of independence, the Draft Master Plan 2025 and its accompanying exhibition show Singapore's age – and that is a good thing. Initiatives under the blueprint demonstrate that Singapore is now old enough and eager to tell its story through its conservation programme or by other means of remembrance. Telling Singapore's story While Singapore's unlikely and rapid growth since independence has been well documented, the country's post-independence buildings have been under-represented in the more than 7,200 buildings and structures conserved thus far. At the launch of the draft masterplan exhibition, URA announced a thematic framework that will improve the way it assesses buildings' significance, by considering how they contributed to Singapore's history under at least one of four themes – economy, housing, social and defence. On top of the architectural, historic, traditional and aesthetic lenses through which buildings are considered for conservation, the thematic framework broadens the scope used to assess buildings, and considers what they mean in Singapore's story – and to Singaporeans. The exhibition hints at the buildings and sites that the authorities have in mind. Facade of Prima Flour Mills, which was Singapore's first flour mill when it opened in 1963. PHOTO: ST FILE URA cited Prima Flour Mill in Keppel Road, which started operations in 1963 as Singapore's first flour mill, as well as Selegie House, also completed in 1963 as the country's then tallest mixed-use development. The hope is that as Singapore turns 60, this renewed emphasis on telling the nation's story, as well as a more holistic heritage framework, will prevent another nationally loved building – like the old National Library – from being lost to redevelopment. The old National Library at Stamford Road, which was demolished after its closure in 2004. PHOTO: ST FILE Time for details With decades of work shaping the city-state and Singaporeans' basic needs largely met, the planners of today are looking beyond just quantity – the need to rapidly establish new towns – and focusing on improving the quality and variety of existing living environments. By 2030, one in four Singaporeans will be 65 or older. As the population greys, talk surrounding new homes is now not just about whether they are public or private, but also whether they are senior-friendly, with more assisted living options and senior activity centres in the pipeline. In the recreational realm, the authorities have in recent years also focused more on quality. In the last decade, large, airy 'community living rooms' have become a feature of new and refurbished malls, giving patrons a comfortable space in which to chill out and chat, read a book, or sip a coffee. Called Privately-Owned Public Spaces, or Pops, more than 30 of these spaces have sprung up, thanks to guidelines that URA rolled out in 2017. Geneo's Privately-Owned Public Space, The Canopy, which opened earlier in 2025. ST PHOTO: JASON QUAH The provision of Pops shows the detail that goes into planning – not just providing malls, but using policy levers to nudge developers towards providing meaningful and accessible public spaces. While areas where basic infrastructure is already in place may be easy to overlook, planners have continued making improvements. Upcoming efforts to upgrade the walking and cycling paths in three identity corridors – elongated stretches with identities and characters that the authorities aim to strengthen – are a case in point. A stretch of Zion Road between Ganges Avenue and River Valley Road will be repurposed to accommodate wider walking and cycling paths. The stretch of Zion Road between Havelock Road and River Valley Road will be repurposed for wider walking and cycling paths. PHOTO: NATIONAL PARKS BOARD And along a stretch of Kallang River next to St Andrew's Junior College where there already is a park connector, more public spaces and cycling paths are being planned for visitors and students to enjoy the waterfront. New cycling paths along the riverbank fronting St Andrew's Village will connect to the Kallang Park Connector. PHOTO: URBAN REDEVELOPMENT AUTHORITY These plans show that planners are not just focused on creating new estates, but are continuously finding ways to improve the living environment for residents. Be that as it may, the provision of more homes remains a key priority. The upcoming redevelopment of Sembawang Shipyard, Kranji Racecourse and Paya Lebar Air Base shows that future development needs are still front and centre, while as-yet-undeveloped land plots slated for housing remain in areas such as Tagore and Clementi Road. Users as experts In many aspects of the draft masterplan, public feedback was sought . Improvements to existing areas, such as upgrades to walking and cycling infrastructure along the identity corridors, were proposed after engagements with 2,300 residents and users. Draft Master Plan 2025 marked the most extensive engagement exercise URA has conducted so far, with nearly 220,000 people engaged. It trumps the more than 15,000 engaged for the Long-Term Plan between 2021 and 2022 – during the Covid-19 pandemic. The Long-Term Plan, which informs the draft masterplan, charts the country's needs for the next 50 years and beyond. All this shows that when it comes to urban planning, regular users of spaces are the experts. URA's engagement efforts are in line with broader global trends in urban planning, which has become much less top-down or expert-led, and where citizens have a stake. To ensure Singaporeans were heard, multiple exhibitions and roadshows were organised for the draft masterplan from October 2023, which almost 186,000 people visited. More than 26,000 people participated in focus-group discussions, workshops and other conversations. About 7,000 people responded to public surveys. Some members of the public even joined planners in kayaks and paddled down Kallang River, as part of efforts to generate ideas on how to improve an identity corridor there. Participants at a kayaking expedition in Kallang River organised by the URA on July 21, 2024. ST PHOTO: GIN TAY Such interactions build trust and understanding between those with differing needs and interests, and between the public and planners. The latest land-use plans show that public feedback does make a difference. In response to suggestions from a focus-group discussion for the Katong-Joo Chiat area, where participants requested more shaded public spaces and seating, URA is planning a new pedestrian mall in East Coast Road, between i12 Katong shopping centre and Katong V mall. The future pedestrian mall in Katong could include landscaping, seating and recreational spaces for community use and interactions. PHOTO: URBAN REDEVELOPMENT AUTHORITY Engaging widely for Draft Master Plan 2025 is a step in the right direction, and it would augur well for URA to keep up this scale of outreach efforts for future reviews of the masterplan. Only then can land-use plans closely mirror the needs of the public. A long-term endeavour While a refreshed blueprint is put out roughly once every five years, planning is an ongoing endeavour, with old plans revived and new ones in the works for years. Upcoming developments under the draft masterplan – such as turning Bishan into a business hub and the rejuvenation of Istana Park and its surrounds – were already announced in 2019, following the previous review of the masterplan. Reaching further back, plans to build new homes in Pearl's Hill were announced in June 2003. Yet much of the land there that has been zoned for residential use has not had new homes built on it for the past two decades . Outram Park Complex on the day of its official opening in 1970. The HDB-built complex was demolished in the early 2000s. PHOTO: ST FILE After works on the Thomson-East Coast Line were completed in the area , these plans were presented again in November 2023, when the authorities said 6,000 new public and private homes will be built. A 2004 photograph shows the area the Outram Park Complex once occupied (left), which has been vacant for more than two decades. PHOTO: ST FILE Notably, a plan revealed in 1991 to reclaim a 'Long Island' off East Coast Park has in recent years been revived as a coastal protection solution, in addition to meeting other needs. It may be hard to reconcile Singapore's pace of rapid urban change with the protracted, continuous nature of longer-term urban planning. Yet, as the Draft Master Plan 2025 has shown, Singapore can make development decisions that honour its past and reflect the needs of its citizens, while remaining open to change. Ng Keng Gene is a correspondent at The Straits Times, reporting on issues relating to land use, urban planning and heritage. Join ST's WhatsApp Channel and get the latest news and must-reads.