logo
Delhi Development Authority Announces Recruitment For 1,383 Vacancies, Check Details

Delhi Development Authority Announces Recruitment For 1,383 Vacancies, Check Details

NDTV29-05-2025
DDA Recruitment 2025: The Delhi Development Authority (DDA) has released a recruitment notification to fill a total of 1,383 vacancies in Groups A, B, and C. The vacant posts include roles such as Junior Engineer, Assistant Section Officer, Patwari, and more. Candidates with qualifications ranging from 10th pass to postgraduate are eligible to apply.
The registration process will commence soon. Interested and eligible candidates can submit their applications by visiting the official website, dda.gov.in.
Vacancy Details
The DDA recruitment drive aims to fill vacancies in Group A, B, and C posts.
Here are the vacancy details:
Assistant Executive Engineer (AEE)
Junior Engineer (JE)
Assistant Section Officer (ASO)
Stenographer Grade D
Legal Assistant
Patwari
Naib Tehsildar
Multi-Tasking Staff (MTS)
Deputy Director
Assistant Director
Programmer
Surveyor
Junior Translator
Architectural Assistant
Planning Assistant
Assistant Director (Ministerial)
Assistant Security Officer
DDA Recruitment 2025: Who Can Apply
Applicants must fulfill the required eligibility conditions to be considered for the roles.
Academic Qualifications:
The educational criteria differ depending on the post. Qualifications may include completion of Class 10, ITI certification, diploma programs, or undergraduate and postgraduate degrees in the relevant disciplines.
Age Criteria:
The age requirements vary for each position, typically falling between 19 and 35 years.
Salary Structure:
The salary for each role is determined according to Levels 1 through 11 under the 7th Central Pay Commission (CPC) framework.
Interested individuals should refer to the official notification for complete information on eligibility, the selection process, and other important instructions before submitting an application.
DDA 2025 Recruitment: Selection Process
The recruitment process comprises the following stages:
Online Examination (CBT): A computer-based test will be conducted to evaluate candidates' knowledge and job-specific skills.
Skill Assessment: Certain roles may require a practical test to measure job-related abilities.
Verification of Documents: All essential documents, including proof of age and educational qualifications, will be verified.
Personal Interview: For select positions, candidates will be invited for an interview to assess their overall suitability.
To get detailed information and submit your application, visit the official website of the Delhi Development Authority (DDA).
Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

Filing Income Tax Return? One Wrong Move Could Cost You Rs 1.5 Lakh
Filing Income Tax Return? One Wrong Move Could Cost You Rs 1.5 Lakh

NDTV

time2 days ago

  • NDTV

Filing Income Tax Return? One Wrong Move Could Cost You Rs 1.5 Lakh

As the income tax filing season approaches, financial experts are warning taxpayers to exercise caution while submitting their returns. Even minor errors in filing can result in hefty penalties, delayed refunds, and notices from the Income Tax Department. One of the most common mistakes taxpayers make is selecting the wrong Income Tax Return (ITR) form. Each form is meant for specific income categories. For instance, ITR-1 (Sahaj) is suitable for salaried individuals earning up to Rs 50 lakh, while ITR-2 is for those with capital gains, multiple properties, or foreign assets. Business owners must opt for ITR-3, and those under presumptive taxation should file ITR-4 (Sugam). Filing with an incorrect form may be treated as a 'Defective Return' and must be rectified within 15 days to avoid invalidation. Failure to verify Form 26AS and the Annual Information Statement (AIS) before filing may result in refund delays or excess tax payments. Salaried individuals should ensure they have Form 16, along with documents related to home loans, capital gains, and dividend income. E-verification is another crucial step. Returns must be verified within 30 days via Aadhaar OTP, net banking, or Demat account. Alternatively, a signed ITR-V must be sent to the CPC office in Bengaluru. Without verification, the filing is considered incomplete. Late filing attracts a penalty of Rs 5,000 for incomes above Rs 5 lakh and Rs 1,000 for incomes below that. Inaccurate information may lead to a 50% penalty on tax dues and up to 200% for wilful misreporting. Businesses failing to maintain books or submit audit reports on time can face fines up to Rs 1.5 lakh. Taxpayers are advised to file early, double-check their details, and choose the correct regime to avoid unnecessary legal and financial trouble.

Swelling pile of unsold housing stock in top seven metros
Swelling pile of unsold housing stock in top seven metros

New Indian Express

time5 days ago

  • New Indian Express

Swelling pile of unsold housing stock in top seven metros

NEW DELHI: India's urban housing market is sitting atop a swelling pile of unsold stock—5.59 lakh units across the top seven metros, as per Anarock's Q1 2025 report. Though the total is 4% lower year-on-year, the numbers mask a deeper structural problem—homes are being built, but not for those who actually need them. Mumbai tops the chart with 1.8 lakh unsold units and an overhang of 16 months. A major contributor: a 36% jump in luxury housing stock, driven by misplaced optimism about post-Covid demand. Developers have resumed high-end launches, but buyers haven't returned in equal measure. The result: unsold towers and frozen capital. Delhi–NCR is barely doing better. With 84,500 unsold units, the region saw a 78% spike in luxury inventory. The public housing sector is equally troubled. The Delhi Development Authority (DDA) failed to sell even a third of its stock in the 2025 scheme—just 2,628 flats sold out of 9,887 by February. In Narela, nearly 40,000 flats lie unsold, despite deep discounts and government efforts like feeder buses. The DDA is now saddled with Rs 18,000 crore worth of unsold inventory and a Rs 9,600 crore deficit. Hyderabad, once the model for affordability, now holds nearly 98,000 unsold homes—a 177% increase in five years. Most alarming: it's the only city where unsold affordable housing stock actually rose.

DDA to offer residential plots for auction in south Delhi area
DDA to offer residential plots for auction in south Delhi area

Time of India

time5 days ago

  • Time of India

DDA to offer residential plots for auction in south Delhi area

New Delhi: Delhi Development Authority (DDA) has prepared its strategy to offer residential plots in prime locations during its forthcoming auction scheme. Focusing on flatted development so far, the authority recently began the process to engage a specialist firm to mark out 118 plots in D6 Vasant Kunj in south Delhi. Tired of too many ads? go ad free now DDA has issued a notice inviting tenders to select an experienced agency for the demarcation, along with developing the surrounding roads and services such as stormwater drains and the laying of pipelines for sewerage and water supply, said an official. "The idea is to prepare the site for the e-auction," he added. The authority has also identified sites for developing surface parking, which will cater to the Ganga, Yamuna, Narmada and Saraswati blocks of Sector D6 Vasant Kunj Mega Housing. DDA developed these societies in and around 2010. "There has been a demand for proper parking space. It will benefit the residents of 1,904 flats by easing the parking issues. On the other hand, the plotted development will help the public or buyers who prefer it," said the official. Delhi Development Authority has decided on a timeline of 365 days for the completion of the tasks after the award of work. "The maximum time allowed for planning and design, including vetting from the competent authority, will be three months, and the time allowed for the actual execution of work is nine months after the allotment of work," said the official. The tasks include planning and designing services like drains, sewerage, water supply, rainwater harvesting and approval of the same from the local civic body. "The preparation and submitting completion plans of all the above-mentioned services will be done as per the direction of the engineer-in-charge," stated the project plan. Works also include providing and laying factory paver blocks in footpaths, parks and lawns; driveways of required strength, thickness and size at various sites; making connections of drain or sewer line with existing manhole; disposal of building rubbish, dismantled or waste materials from sites by mechanical means, including loading, transporting and dumping etc, it added. Tired of too many ads? go ad free now According to the notice inviting tender, the entire work costing around Rs 7.5 crore will be done as per the guidelines of Central Public Works Department while National Green Tribunal's norms are to be adhered to. The proposal of the development projects should ensure minimal felling of trees, it pointed out. "All the alternative proposals should also be analysed and kept on record. No tree should be felled/translocated in the area identified for development projects by any field staff, unless formal and final permission is received from the forest department," the notice emphasised.

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into a world of global content with local flavor? Download Daily8 app today from your preferred app store and start exploring.
app-storeplay-store