
East-West Highway in good condition, safe for users
The narrow, winding road is often criticised for its many hazards, including the absence of warning signs, faded road markings, poor street lighting and the added danger of wandering wildlife.
According to police statistics, 3.14 million road accidents – an average of 1,720 a day – were recorded nationwide over five years from 2019.
However, experts have made it clear that road conditions and infrastructure are not entirely to be blamed for crashes.
According to the Malaysian Institute of Road Safety Research, more than 80 percent of road accidents are caused by human behaviour, while infrastructure and road conditions account for only 13 percent.
Highlighting the fact that only 13 percent of accidents are due to road and infrastructure conditions, the Ministry of Works, via its social media platforms, stressed that it has never neglected the maintenance of roads and infrastructure under its jurisdiction.
The ministry said the Public Works Department (JKR) is responsible for maintaining approximately 15,000 kilometres (km) of federal roads all over Peninsular Malaysia. Between 2023 and May 9 this year, the ministry spent a total of RM5.49 billion on the maintenance of federal roads.
JRTB STILL SAFE FOR USE
In the context of JRTB – which connects Gerik, Perak, in the west to Jeli, Kelantan, in the east – it is part of Federal Route 4 (FT4), with a total length of 292.39 km, covering 61.78 km in Kedah, 114.66 km in Perak and another 115.95 km in Kelantan.
According to Works Minister Datuk Seri Alexander Nanta Linggi, based on the latest traffic census in 2024, the two-lane single carriageway remains at a good level of service, with its current configuration able to accommodate present traffic volume.
'Physically, the JRTB is in good condition and safe for use,' he told Bernama in a statement recently, adding the road is classified as hilly terrain, with its alignment designed to follow the contours and topography of the Titiwangsa mountain range.
(The minister's statement was in response to questions submitted by Bernama, following two special reports related to JRTB published by the news agency in June.)
Nanta said the highway, which was opened to the public on July 1, 1982, observed a daily traffic volume of 2,409 vehicles, including 751 heavy vehicles which make up 31.2 percent.
Acknowledging that the high number of heavy vehicles warrants the construction of an overtaking or climbing lane, the minister said in addition to routine, periodic and non-periodic maintenance, JKR – through its appointed concession company – also carries out repairs along FT4 as needed, such as pothole patching, which must be completed within 24 hours once detected or reported.
SHORT, LONG-TERM PLANS
Taking into account the government's budget constraints and the current financial capacity, Nanta said his ministry has formulated both short- and long-term plans to ensure that maintenance and upgrades of JRTB can be carried out in phases and a high-impact and sustainable manner.
He said a special allocation has been set aside under the national budget for upgrading JRTB, with key priorities including road lighting, resurfacing and improvements to safety systems, particularly in high-risk areas.
'For the short-term plan in 2025, a total of RM55 million has been allocated for repair works along JRTB, and implementation began in April, with completion expected by early November this year.
'Of that amount, RM35 million was approved for road resurfacing works at critical locations, while RM14.5 million is allocated for non-pavement works such as the replacement of guardrails, installation of warning signs at dangerous bends, construction of drains and repainting of bridge railings,' he said.
He added that RM3.59 million has been allocated for upgrading the lighting system through the installation of solar-powered street lights in dark or high-risk areas, such as sharp bends and zones near residential areas.
'Apart from that, RM1 million has been set aside for the implementation of a pavement condition assessment along the entire FT4 section in Perak.
'The data gathered from the assessment will serve as the basis for determining the actual extent of damage, the appropriate pavement treatment and the prioritisation of locations requiring repair,' he said.
SMART TECHNOLOGY
Meanwhile, JKR director-general Datuk Roslan Ismail, in the same statement, said the department has identified 16 accident-prone spots along JRTB since 2018.
To address this, JKR has implemented the blackspot treatment programme under its Road Safety Infrastructure Upgrade initiative, based on the principle of low-cost, high-impact.
'Under this principle, if the treatment method applied is appropriate for the type of accident occurring, the accident rate at that location (blackspot) can be reduced at a relatively low cost,' he said.
Based on analyses, he said, common issues at most of the treated blackspots include dilapidated and insufficient signage; faded road markings; inadequate lighting and delineation at night; limited visibility due to winding road geometry; and damaged road surfaces.
To improve monitoring efficiency along FT4, particularly the Baling–Jeli stretch, Roslan said JKR, through its appointed concession company, is employing smart technology specifically developed to support federal road maintenance through digital and automated systems.
One of the core smart functions of the application involves the automatic detection of potholes using cameras and artificial intelligence (AI) technology installed on patrol vehicles such as motorcycles or four-wheel drive vehicles.
'This system works by capturing images of the road surface during daily patrols, with AI detecting potholes based on irregular patterns, shapes and textures.
'Once a pothole is detected, the location of the damage is automatically recorded using GPS and transmitted to the application for verification by patrol officers.
'After verification, the system will automatically issue a work order to the patching subcontractor concerned, who will receive complete location details through the app, including images and coordinates, and carry out repairs accordingly,' he said.
Roslan added that this method significantly reduces detection and information delivery time compared to the previous manual process. It not only speeds up repair works but also improves data accuracy, reduces reliance on written reports and streamlines the work monitoring system.
'The technology reflects a 'digital-first' approach in road maintenance management, in line with the ministry and JKR's objective to expand the use of smart systems and automation in public infrastructure maintenance,' he added.
SHARED RESPONSIBILITY
Roslan also said that for the long-term plan to upgrade JRTB, the department has submitted a new proposal under the First Rolling Plan of the 13th Malaysia Plan (2026-2030), with priority given to the most critical sections, specifically the 114.66-km stretch in Gerik, Perak, and 46.5-km section in Jeli, Kelantan.
'Proposed scopes include building overtaking or climbing lanes at selected locations, renewing road markings and upgrading culverts,' he said, adding there are also long-term proposals involving comprehensive and high-cost works such as realignment at dangerous bends along the road, upgrading existing road safety facilities, and building wildlife crossings.
Meanwhile, Nanta urged the public to support road maintenance initiatives by providing constructive feedback to improve service quality, stressing that safe and quality road infrastructure is a shared responsibility that begins with user awareness and care.
'My main advice to the public is to obey speed limits and all road regulations. Heavy vehicles, in particular, are advised to use designated routes as using regular roads can accelerate road surface deterioration.
'In addition, users are encouraged to report any road damage or hazard, such as potholes, landslides or damaged signboards, to the authorities so that immediate action can be taken,' he said. - Bernama

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


The Sun
32 minutes ago
- The Sun
Bank officer loses RM241,700 in online vehicle scam
KUALA TERENGGANU: A bank officer lost his entire savings, including EPF funds, amounting to RM241,700 in an elaborate online vehicle purchase scam. The victim, a 52-year-old man, fell prey to a fraudulent advertisement for a used four-wheel-drive vehicle on Facebook. Kuala Terengganu police chief ACP Azli Mohd Noor stated that the incident began on July 4 when the victim responded to the advertisement. He communicated with the supposed seller via WhatsApp and was asked to provide a copy of his identity card along with an advance payment. 'Between July 9 and 21, the victim made 40 transactions to eight different accounts, totalling RM241,700,' Azli said. The scam escalated when the suspect demanded an additional RM31,000 for alleged fingerprinting costs at the Royal Malaysian Customs Department. The victim realised he had been deceived and lodged a police report yesterday morning. The case is being investigated under Section 420 of the Penal Code for cheating. - Bernama


Daily Express
32 minutes ago
- Daily Express
Negligence of Pan Borneo contractor blamed
Published on: Monday, July 28, 2025 Published on: Mon, Jul 28, 2025 By: Ahmad Apong Text Size: The victim sustained a fractured right arm. BEAUFORT: A motorcyclist escaped serious injury or worse due to the alleged negligence of the Pan Borneo Project contractor, who failed to place proper warning signs near a pothole, recently. The accident occurred at Kampung Naluyan, Mesapol Sipitang, along the Pan Borneo Highway (Sindumin–Melalia stretch). According to an eyewitness, Abdillah AJ, the victim, identified as Bakar Januddin, crashed into a deep pothole at approximately 11:30 am. Abdillah said he was on his way back from Sipitang and had just reached Kampung Naluyan, near the junction to Kampung Lubok Darat, when he witnessed the motorcyclist veer off and fall into the roadside hole. 'Fortunately, some passersby noticed the incident and helped the victim out of the hole. He was rushed to the hospital, but his motorcycle was badly damaged,' Abdillah said. The victim sustained a fractured right arm. The witness stressed that no warning signs or signal lights were placed at the location to alert road users of the hazard. 'I've seen too many accidents caused by the carelessness of the Pan Borneo highway contractors. It's costing people their safety,' he added. Residents living along the stretch between Sipitang and Lumadan want the government, particularly the Public Works Department (JKR), to closely monitor the road conditions and ensure the contractor fulfills safety obligations. Sipitang District Police Chief Supt Awang Anak Suanda said police have received a report from the victim's family. 'The victim must file a formal report at the police station to proceed with claims against the Public Works Department and the responsible parties for the damages incurred,' he said. Police also advised that contractors must place proper warning signs and install lighted signals at any hazardous or damaged road sections, especially to alert motorists during night time. * Follow us on our official WhatsApp channel and Telegram for breaking news alerts and key updates! * Do you have access to the Daily Express e-paper and online exclusive news? Check out subscription plans available. Stay up-to-date by following Daily Express's Telegram channel. Daily Express Malaysia


The Sun
an hour ago
- The Sun
Police seize 936 fighting cocks, arrest trio in Sabah raid
PAPAR: Police seized 936 fighting cocks of Philippine breed and arrested three men, including two foreigners, during a raid in Kampung Kambizaan, Sabah. The operation, conducted on Friday, was a joint effort between Bukit Aman's Internal Security and Public Order Department and the Kota Kinabalu Veterinary Services Department. Datuk Seri Azmi Abu Kassim, director of Bukit Aman's Internal Security and Public Order Department, confirmed the arrests and seizures. 'Among the items seized were 30 iron cages, 107 tagging rods from the Philippines, and various types of vitamins and medications for the birds,' he said in a statement. The suspects, aged between 38 and 59, included an Indonesian and a Filipino national. The trio is being investigated under Section 15(1) of the Animals Enactment 2015 for allegedly importing animals without a licence. The total estimated value of the seized items is RM4.7 million. In a separate nationwide crackdown, police conducted 179 raids, arresting 314 individuals for offences including smuggling of non-duty paid goods, controlled item leaks, imitation weapon sales, wildlife trafficking, and e-waste operations. The total estimated value of these seizures reached RM550,947,488.81. - Bernama