logo
PGB restores gas supply to key areas following bypass pipeline completion

PGB restores gas supply to key areas following bypass pipeline completion

The Star07-07-2025
KUALA LUMPUR: Petronas Gas Bhd (PGB) has fully restored natural gas supply to Batu Tiga, Shah Alam, and Connaught Bridge following the successful commissioning of its newly constructed bypass pipeline on July 1, 2025.
The gas infrastructure and utilities company said the operation was carried out after fulfilling all engineering, operational, and regulatory safety requirements, including the issuance of a permit to operate (PTO) by the Occupational Safety and Health Department (DOSH).
"With natural gas powering between 40 per cent to 50 per cent of Malaysia's electricity, PGB remains focused on ensuring the public feels secure living near this critical infrastructure - a responsibility the company embraces as part of its commitment to safe, reliable energy for all,' it said in a statement today.
PGB said as part of its safety-first philosophy, the company has implemented enhanced engineering reinforcements at the bypass section in Putra Heights, including advanced sensors to detect soil and pipe movement, exceeding standard requirements.
To ensure long-term stability and structural integrity, sheet piling and engineered support structures were also installed to safeguard the pipeline, ensuring safe, secure, and uninterrupted performance.
The company also said a new permanent pipeline is currently being designed with enhanced safety features and will be installed on deep-piled slab foundations, offering greater structural resistance to soil movement and unpredictable ground shifts, given the specific risks in the area due to surrounding development.
It noted that the layout will also include new shut-off valves to allow shorter isolation distances in the unlikely event of an emergency.
In addition to restoring supply, the company has disbursed more than RM2 million in ex-gratia and humanitarian aid through local authorities, including RM1.38 million in direct assistance to affected families and a RM25 million contribution via the Housing and Local Government Ministry for home reconstruction.
PGB also carried out precautionary assessments along other sections of the 2,680-kilometre Peninsular Gas Utilisation (PGU) pipeline to ensure system-wide integrity.
These efforts involved the use of inspection tools such as Geopig and Magnetic Flux Leakage (MFL) technology, complemented by targeted visual inspections at selected segments.
The company confirmed that to date, no other locations exhibit risk characteristics similar to those identified in Putra Heights. - Bernama
Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

Johor Bahru bus drivers strike disrupts Singapore commute
Johor Bahru bus drivers strike disrupts Singapore commute

The Sun

timean hour ago

  • The Sun

Johor Bahru bus drivers strike disrupts Singapore commute

JOHOR BAHRU: Private employee Saiful Umar, 37, was among thousands caught off guard when around 100 Malaysian bus drivers operating to Singapore suddenly went on strike early this morning at the Sultan Iskandar Building (BSI). 'I was shocked, there was no information at all (on a strike),' he said. Passengers arriving as early as 5 am found no bus services, forcing some to walk one to two kilometres across the Johor Causeway to reach workplaces in Singapore. Saiful, who had to walk nearly two kilometres to Woodlands before getting a ride back to Tampoi, expressed frustration over the lack of prior notice. 'This situation is not only inconvenient but also affects our work and image,' he told Bernama. A viral video showed crowds at BSI at 5.30 am due to the halted bus services. Reports suggest the strike stemmed from drivers' dissatisfaction over salary adjustments and allowance cuts, allegedly reducing their monthly pay from RM2,800-RM2,900 to below RM2,000. Another passenger, K. Ramesh, 40, called the situation 'ridiculous,' urging the bus company to resolve the issue swiftly. 'This affects our daily routine and careers,' he said. Bus driver Atoi, 35, confirmed about 100 drivers began striking at 5 am in protest. By evening, services resumed, with no further disruptions observed. Johor Public Works Committee chairman Mohamad Fazli Mohamad Salleh confirmed the incident, having monitored operations with Singapore's LTA and bus operators earlier. – Bernama

Anwar refutes claims of failed multibillion-ringgit investments
Anwar refutes claims of failed multibillion-ringgit investments

The Sun

time7 hours ago

  • The Sun

Anwar refutes claims of failed multibillion-ringgit investments

PUTRAJAYA: Prime Minister Datuk Seri Anwar Ibrahim has firmly rejected allegations that multibillion-ringgit investments in Malaysia have failed to deliver results. He stressed that these investments, particularly in the manufacturing sector, have significantly contributed to economic growth, job creation, and wage improvements. Anwar revealed that 3,494 manufacturing projects approved by the Malaysian Investment Development Authority (MIDA) between 2021 and June 2025 have seen an 86.4% implementation rate, with 3,095 projects already operational. The annual implementation rates were 90.6% in 2023 and 79.2% in 2024, while the first quarter of 2025 recorded 49.8%. 'Critics ask, 'Where are the results of these billions in investment?' The truth is, 86% of approved projects are up and running,' Anwar stated during the Prime Minister's Department monthly assembly. He directed the Minister of Investment, Trade and Industry, Tengku Datuk Seri Zafrul Abdul Aziz, to publicly share data on operational projects in key regions like Kulim, Johor, Sarawak, Sabah, and the Klang Valley. The prime minister emphasised that these projects, particularly in digital and green industries, have generated 50,000 new jobs in the manufacturing sector in Q1 2025. Additionally, the median wage in the sector rose by 5.4% to RM2,745, aligning with the new minimum wage of RM1,700. Anwar also highlighted the efficiency of the Invest Malaysia Facilitation Centre (IMFC), established in December 2023, which has processed 28,166 investor applications with a 99.9% resolution rate. These applications covered approvals, permits, foreign worker quotas, utilities, and taxation. 'The civil service's role in facilitating these investments must be acknowledged. Their efficiency ensures that announced policies translate into real outcomes,' he added. – Bernama

Claims Multibillion-ringgit Investments Failed Are Baseless
Claims Multibillion-ringgit Investments Failed Are Baseless

Barnama

time8 hours ago

  • Barnama

Claims Multibillion-ringgit Investments Failed Are Baseless

BUSINESS PUTRAJAYA, July 21 (Bernama) -- Prime Minister Datuk Seri Anwar Ibrahim has dismissed claims that multibillion-ringgit investments have not produced any results. He emphasised that investments in the manufacturing sector continue to have a positive impact on the national economy, with the benefits being directly felt by the people through increased job opportunities, higher wages, and greater value added to industries. Anwar said that 3,494 manufacturing investment projects had been approved by the Malaysian Investment Development Authority (MIDA) from 2021 to June 2025, of which 3,095 projects, or 86.4 per cent, had been realised and are now operational. He noted that the overall annual implementation rate of these approved projects stood at 90.6 per cent in 2023 and 79.2 per cent in 2024, while for the first quarter of 2025, the implementation rate was 49.8 per cent. 'They say, 'billions in investment, but where are the results? There is nothing to show'. In reality, 86 per cent of the approved projects are already operational. 'As such, I have informed the Minister of Investment, Trade and Industry Tengku Datuk Seri Zafrul Abdul Aziz to continue displaying this data and to highlight the locations of these operational projects in Kulim, Johor, Sarawak, Sabah, and the Klang Valley,' Anwar said in his speech at the Prime Minister's Department (PMO) monthly assembly here today. He said the majority of these realised projects are in the manufacturing sector, with a focus on digital and green industries. Anwar highlighted that the implementation of these projects had created 50,000 new job opportunities in the manufacturing sector in the first quarter of 2025. During the same period, the median wage in the manufacturing sector increased by 5.4 per cent to RM2,745, compared to RM2,600 last year, in line with the implementation of the new minimum wage of RM1,700.

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into a world of global content with local flavor? Download Daily8 app today from your preferred app store and start exploring.
app-storeplay-store