
10-Hour Work Rule?! Amid Employee Protests, Here's What Karnataka Govt Has To Say
Bengaluru: The Karnataka government's proposal to extend daily working hours from 9 to 10 especially for employees in the IT sector has stirred strong reactions. Labour unions, including the Karnataka State IT/ITeS Employees Union (KITU), have slammed the idea, calling it 'modern digital slavery' and raising concerns over employee rights and work-life balance.
KITU warned that such a shift would disrupt the existing three-shift system prevalent in tech companies, potentially replacing it with a two-shift structure. This could result in significant job losses, with up to one-third of workers at risk. The union also highlighted serious health and mental well-being implications, citing the sector's growing incidents of stress-related illnesses, burnout, and even suicides.
'This proposal undermines fundamental rights to personal time, health, and dignity at work,' said a KITU representative. 'It prioritises corporate convenience over human lives. We urge all IT and ITeS employees in Karnataka to stand together and oppose this in the strongest terms.'
Clarification from Labour Minister
In response to the backlash, Karnataka's Labour Minister, Shri Santhosh Lad, issued a detailed press release clarifying that the initiative to amend work-hour regulations was not introduced by the state government but was instead proposed by the Ministry of Labour and Employment, Government of India.
According to the minister, the proposal stems from a task force constituted by the Central Government, led by Mr. Manoj Joshi, IAS, Secretary of the Department of Land Resources. This committee held consultations with Karnataka's Chief Secretary and senior state officials.
The two key amendments proposed by the Centre are:
1. An increase in the maximum daily working hours from 9 to 10.
2. Raising the threshold for mandatory compliance under the Shops and Commercial Establishments Act to workplaces with 10 or more employees.
These proposals were forwarded by the Labour Commissioner of Karnataka to the Secretary of the Labour Department on May 30, 2025. The Secretary is now conducting stakeholder consultations with employee unions, industry representatives, and legal advisors to examine the implications.
'To clarify, the proposed changes have been initiated by the Ministry of Labour and Employment, Government of India. The state is currently evaluating the matter through a consultative process,' said Shri Santhosh Lad.
Mixed Reactions from Stakeholders
A stakeholder meeting chaired by Labour Secretary Rohini Sindhuri was recently held at Vikas Soudha. Participants included representatives from labour unions, trade bodies such as FKCCI, hotel owners, and business leaders. While business owners welcomed the potential for operational flexibility and weekly offs, unions remained firmly opposed.
'We support the proposal if it guarantees two days off per week or additional compensation for extended work hours,' said P.C. Rao, President of the Bangalore Hotel Owners' Association. Sources suggest that a final decision is pending cabinet approval, and the proposed amendments may be tabled during the upcoming session of the Karnataka Legislative Assembly.
As debates intensify, all eyes remain on the government's next steps and how it will balance economic imperatives with employee welfare in one of India's fastest-growing tech hubs.
Hashtags

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


The Hindu
28 minutes ago
- The Hindu
Polls to elect next Vice President to be held as soon as possible: Constitution
With Jagdeep Dhankhar quitting as the Vice President, the election to appoint his successor will have to be held "as soon as possible". According to Clause 2 of Article 68 of the Constitution, an election to fill a vacancy in the office of the Vice President occurring due to his death, resignation or removal, or otherwise will be held "as soon as possible" after it goes vacant. The person elected to fill the vacancy will be entitled to hold office "for the full term of five years from the date on which he enters upon his office". The Constitution is silent on who performs the duties of the Vice President in case of his death or resignation before the expiry of his term, or when the Vice President acts as the President of India. The Vice President is the second highest constitutional office in the country. He serves for a five-year term, but can continue to be in office, irrespective of the expiry of the term, until the successor assumes office. The only provision in the Constitution is with regard to the vice president's function as the chairperson of the Rajya Sabha, which is performed, during the period of such vacancy, by the Deputy Chairperson or any other member of the Rajya Sabha authorised by the President of India. The Vice President may resign from his office by submitting his resignation to the President. The resignation becomes effective from the day it is accepted. The Vice President is the ex-officio Chairperson (holding the office of Rajya Sabha chairperson by virtue of being the vice president) of the Rajya Sabha and does not hold any other office of profit. During any period when the Vice President acts as, or discharges the functions of the President, he does not perform the duties of the office of the chairperson of the Rajya Sabha and, is not entitled to any salary or allowances payable to the Chairperson, Rajya Sabha. As per Article 66 of the Constitution, the Vice President is elected by the members of the Electoral College consisting of the members of both houses of Parliament in accordance with the system of proportional representation by means of the single transferable vote. Who can be elected as Vice President: A person cannot be elected as Vice President unless he is a citizen of India; has completed the age of 35 years, and is qualified for election as a member of the Rajya Sabha. A person is not also eligible if he holds any office of profit under the Government of India or a State government or any subordinate local authority.


India.com
2 hours ago
- India.com
China, Pakistan rattled as India gets new airbase at 13,700 feet, designed for -40°C, will provide quick..., strategic capabilities...
New Delhi: Boosting India's national security and connectivity along the Line of Actual Control (LAC), the country's highest airfield located at Nyoma in eastern Ladakh will be fully ready for operation by October. According to sources, Nyoma is the closest Advanced Landing Ground (ALG) to the LAC, located at an altitude of about 13,700 feet. What is the length of the Nyoma runway? The Nyoma Advanced Landing Ground (ALG) area will be helpful in enhancing the quick movement and strategic capabilities of the defense forces. Nyoma ALG has a newly constructed three-kilometer-long runway, designed to help in emergency operations. The project was given the green signal in 2021 with a budget allocation of about Rs 214 crore. The height of the airstrip and its presence close to the Line of Actual Control (LAC) make the airstrip a strategic asset, allowing India to deploy resources faster than ever on its northern border. As the closest ALG to the LAC, Nyoma's position will be very important in the response scenario. This will give the Indian Air Force direct access to remote and mountainous border areas, where traditional ground transportation is often challenging. What is the strategic importance of Nyoma? The construction of Nyoma has been completed at a time when special attention is being paid to infrastructure on the India-China border. Since the standoff with China began on the Line of Actual Control four years ago, India has rapidly advanced its infrastructure projects in Ladakh and surrounding areas. Nyoma is a major breakthrough in this network, which connects with newly built roads, tunnels and bridges to enhance India's counter capabilities and logistics support in inaccessible areas. The importance of this airfield has increased even more after the recent military disengagement agreement between India and China in two disputed areas – Demchok and Depsang. Patrolling has resumed due to these disengagements, yet Nyoma's proximity to these areas shows its importance as a quick deployment base. The rapid infrastructure being built by India is a strong sign of its commitment to protect territorial integrity. Important for border security and surveillance India has carried forward these infrastructure projects under challenging circumstances, which reflects a decisive shift in its approach towards border security. The focus of the Government of India on strengthening connectivity, especially in areas like Ladakh, is important to meet both military and civilian needs. The development of high altitude ALGs like Nyoma not only ensures better operations, but also contributes to local connectivity, as well as supports civil aviation, which can also provide better facilities to the people. This strategic airfield at Nyoma is a milestone in India's goal of strengthening the Himalayan border infrastructure, equipping it to deal with potential threats and ensuring a secure border.


Time of India
8 hours ago
- Time of India
China constructing world's largest dam on Brahmaputra could reduce flooding in Assam every year: CM Himanta Biswa Sarma
With China commencing the construction of world's largest dam on river Brahmaputra , Assam chief minister Himanta Biswa Sarma there are two scientific aspects to the dam, one is reducing the amount of flooding that affects Assam every year. During an inauguration ceremony in Guwahati, Sarma said that there are two types of "views", one which if China builds a dam the biodiversity may be affected however there is another view "if less water comes it will also act as a flood protection." Explore courses from Top Institutes in Select a Course Category Technology Design Thinking Artificial Intelligence Cybersecurity others Healthcare MCA Product Management Degree Data Analytics Operations Management CXO Digital Marketing Finance Leadership Project Management Data Science healthcare Management Data Science Others Public Policy MBA PGDM Skills you'll gain: Duration: 12 Weeks MIT xPRO CERT-MIT XPRO Building AI Prod India Starts on undefined Get Details Sarma said that scientifically," We are not pretty sure which is correct. So, the Government of India will act accordingly." Sarma said 'The Brahmaputra receives most of its water from Bhutan, Arunachal Pradesh , and rainfall in Assam itself. Scientifically, the river is largely fed by indigenous sources.' Admitting that Chinese activities upstream could potentially affect the river's biodiversity, the Chief Minister also noted a differing perspective — that reduced water flow might help cushion the impact of floods, a frequent problem in Assam. Live Events He said the Centre is either already in talks with China or will soon initiate dialogue regarding the dam issue. 'Immediately, I am not worried,' Sarma added. 'Brahmaputra is a mighty river and not dependent on a single source.' Tsangpo River is known as Siang in Arunachal Pradesh and Brahmaputra in Assam and Jamuna in Bangladesh, and it flows through the neighbouring country (Bangladesh) before joining the Bay of Bengal. Recently, the Arunachal Pradesh government expressed concern regarding China's massive $137-billion hydroelectric dam project, which is set to produce 60,000 MW of electricity over the Yarlung Tsangpo River, in the upper reaches of Siang River in China. Arunachal Pradesh Deputy Chief Minister, Chowna Mein had said that the Government of India has proposed the Upper Siang Multipurpose Project, a dam on the Siang River, which has the potential to generate up to 11,000 MW of electricity. While sharing some observations made by experts on the environmental impact in the region of such a massive hydropower project over Tsangpo river, the Deputy Chief Minister said that if the China builds the dam over Yarlung Tsangpo river and diverts its water, it will dry up the Siang river and its distributaries affecting the aquatic life of the river and the large population in the plains of Assam and Bangladesh which depends on Brahmaputra river for the irrigation of their agricultural fields. On the other hand, if any conflict arises between the two nations in future, it may release a large volume of water from the dam, which would cause unpredicted flooding in the downstream areas in Arunachal Pradesh and Assam causing loss of lives and properties. He said that the implications of such a massive project over the Tsangpo river by the Chinese government cannot be ignored and asserted that in both the cases, the downstream people will be affected adversely. Considering all these factors, the Government of India has proposed the Upper Siang Multipurpose Project, a dam on the Siang River. The project is a crucial initiative aimed at mitigating the impacts of downstream flooding in Arunachal Pradesh, Assam, and Bangladesh and other environmental issues. The objective of the project is safety and security of the downstream people and to address other environmental issues, he said. He said that the power generation is secondary and would be a byproduct of the project. He added that during the lean period, the project will act as a storage for the rainwater that falls in the Indian territory preventing the river water in Siang from drying up and in case of the release of large volume of water by China, the dam in the Siang river will act as a deterrent and release the water in a controlled way thereby moderating flood in the downstream. Economic Times WhatsApp channel )