
Lee orders immediate inspection of Kampung Tudan 3 road widening project
MIRI (July 7): Sarawak Transport Minister Dato Sri Lee Kim Shin has directed an immediate and comprehensive inspection of the ongoing Kampung Tudan 3 road widening project following public complaints regarding the quality and safety standards of the construction.
Lee, who is also the Senadin assemblyman, personally inspected the site on Friday, July 4, after receiving feedback from residents expressing concern that the stone base in the widened areas may not meet the specified construction standards.
'Any non-compliance issue must be addressed before proceeding with the laying of the premix,' said Lee in a statement, following the site visit.
He was accompanied by Miri City Council (MCC) engineer Peter Ukin, MCC councillor Hiung Chien Yii, and community leader Kapitan Chong Ah Muk.
Lee instructed the engineer to carry out a thorough inspection of the stone base to verify the contractor's compliance with the required technical specifications.
The Kampung Tudan 3 to Kampung Cina road widening project is being implemented under the Senadin constituency Rural Transformation Project (RTP).
Lee also emphasised the proper use of construction waste for earth-filling works, requiring that only specified materials be used in compliance with environmental and structural standards.
To avoid similar issues in future projects, Lee urged MCC to assign dedicated technical staff to regularly verify that construction standards and specifications are strictly adhered to.
During the same visit, Lee and his team also inspected several completed road resurfacing projects in Tudan, including Lorong Harmoni with a total road length of 2,060 metres, and Lorong Perdana, covering 2,082 metres.
The completed works at both locations were found to be satisfactory. kampung tudan lead Lee Kim Shin road upgrades

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


Borneo Post
11 hours ago
- Borneo Post
Dataran Ibu Pertiwi ceremony celebrates unity, Sarawakian identity
Lee (middle) joins performers and guests in waving the mini Sarawak flags after the flag-raising ceremony. On his right is Hilmy. – Photo by Frankie Junau KUCHING (July 14): The Dataran Ibu Pertiwi stood as a powerful symbol of unity yesterday as it hosted the July edition of the Ibu Pertiwi flag-raising ceremony, held in conjunction with Sarawak Day celebrations. The ceremony was officiated by Sarawak Transport Minister Dato Sri Lee Kim Shin, who is also in charge of this year's Sarawak Day celebrations on July 22 in Miri. The majestic Ibu Pertiwi flag, measuring 25 metres in length and 12.4 metres in width, was raised with pride on its 99.4-metre-high flagpole. The event commenced with an inspection of the Kuching North City Commission (DBKU) Honor Guard, followed by the rendition of the state anthem, 'Ibu Pertiwiku.' Attendees were also treated to a performance by local artist Tini Tyrani, who showcased Sarawak's cultural heritage through a Sarawak Day-themed presentation. The month flag-raising ceremony, organised by DBKU, is a continuous civic initiative aimed at fostering patriotism and strengthening a shared sense of identity among Sarawakians. The ceremony saw the presence of several dignitaries including Kuching North mayor Dato Hilmy Othman, Ministry of Transport Sarawak (MOTS) permanent secretary Datu Wong Hee Sieng, as well as senior officials and commission members from MOTS and DBKU. The inaugural flag-raising ceremony was officiated by Premier Datuk Patinggi Tan Sri Abang Johari Tun Openg on July 28 last year, marking the official launch of the Dataran Ibu Pertiwi as a civic landmark. Dataran Ibu Pertiwi has since become one of Kuching's most iconic landmarks, recognised not only for its monumental flag but also as a site that reflects the spirit and aspirations of the people of Sarawak. Dataran Ibu Pertiwi lead Lee Kim Shin sarawak day


Borneo Post
a day ago
- Borneo Post
‘Toxic, degrading': Tmn Hilltop Miri residents endure months of unbearable living conditions
Ang points at the septic tank, now precariously 'hanging on' to what is left of her backyard. MIRI (July 13): The sound of crumbling earth at 3am on Chinese New Year's Eve was the beginning of a nightmare for the three families at Jalan 3A of Taman Hilltop in Miri – one that continues to haunt them until this day. Forced to be living in stench-filled environment with no gas supply, these families are not only exposed to the risk of developing health issues, but the changing weather further erode the soil underneath this area, putting the remaining walls of the next neighbour to possibly collapse. Pauline Sim recalled being abruptly woken up to a huge rumbling sound, followed by voices of her neighbours shouting. 'The retaining walls on our backyards collapsed. Prior to this, it had been pouring for a month. My heart really sank because it occurred on the eve of the Chinese New Year. 'It should have been the most celebrated time, but we were forced to face this challenge,' she told thesundaypost . After the wall collapsed, a strong gas odour was detected. Police and firefighters were called to the scene immediately, as it was discovered that the gas pipes were damaged following the collapse. It was a moment of danger, said Sim. 'Had the authorities not intervened, things could take a turn to the worse, like a gas explosion.' Officials from Miri City Council (MCC) were also called to the scene to carry out investigation. The residents were told that the collapse of the retaining walls was triggered by ageing structure, exacerbated by strong water flow caused by the heavy rain. The MCC gave assurance that it would undertake the repair works, in view of the situation being regarded as a collateral damage from a natural disaster. Sim and others were told that the fast-flowing water might have been slowly eroding the soil underneath the walls, weakening the structure. The month-long downpour, also classified as natural disaster, was the key contributing factor to the collapse. Gas supply cut Due to the damaged gas pipelines, the gas company had cut off the supply on the afternoon of Jan 28 as an emergency measure, fearing that fireworks or firecrackers during the Chinese New Year festivities might trigger a gas explosion. The incident had adversely affected three houses, comprising 20 residents in total. These households, having been accustomed to getting natural gas supply, were forced to go without it for nearly two months, before they were able to obtain gas tanks. 'We couldn't buy gas cylinder during the New Year period and the situation persisted after that because the floods in Bintulu had disrupted the production. 'We had take-outs every day and settled for the cheapest meals, but each still cost us RM40 to RM50 because I have a big family. Covering three meals a day, the cost was overwhelming – exceeding my monthly budget,' said Sim, shaking her head in remembering those difficult weeks. Sim shows her backyard – or what is left of it after the collapse. The situation was compounded by a region-wide shortage. Miri, at the time, was facing shortage of cooking gas tanks, as Bintulu was affected by the floods. Sim said although they were able to get gas tanks later on, she was still anxious about when the repair works would begin. 'With no clear timeline for when everything will resume to normal, we have been left waiting up to this day.' Unbearable conditions When the backyard was 'gone', the septic tank that was supposed to be supported by the soil had tilted because of its weight, and the pipe got disconnected from the house. As a result, each time the toilet got flushed, all the human waste would gush out of the soil, exposed to air. That, and the stench that came with it, made the living environment unbearable, said a resident Ang Yick See. 'It was a living nightmare, which got worse every single day. 'Imagine waking up every morning to the smell of sewage right outside your kitchen window – it was not just unpleasant; it's toxic, degrading and it's slowly destroying our family's health and our will to continue living here,' she said. The septic tank, according to her, is now sitting at a dangerously precarious angle – half-dangling into what used to be the drain. 'I worry that if anything were to burst, it might cause a bigger health disaster.' Ang said the owner of the house that her family had been renting for more than five years, had been reaching out to various government agencies including Miri City Council (MCC), as well as the local elected representative, trying to get attention that would help expedite the repair works. 'We were told that because of disaster, the funding for the repairs should be from the SDMC (Sarawak Disaster Management Committee), to be channelled to the city council as implementing body,' she said. Sim added: 'During a meeting between us, residents and the city council, the council's engineer promised that they would come to look at the severity of the situation; to see whether they could do anything about the septic tank. 'Nothing has happened yet.' Miri MP Chiew Choon Man (right) and local Democratic Action Party (DAP) man Alan Ling seen during a recent site visit. The waiting game Following the septic tank incident, the homeowners had repeatedly reached out to the authorities, hoping to get concrete action and also the timeline for any repair works. However, they felt that all efforts had been hampered by bureaucratic delays and 'unfulfilled promises'. It is said that due to severity of the damage, the houses are listed by the council as the fourth priority to be repaired among all disaster-affected properties. Initially, in February, the homeowners sought attention from Senadin assemblyman Dato Sri Lee Kim Shin, submitting to him a letter appealing for assistance to expedite the repair works. They were then told that a letter, highlighting the matter of funding, had been sent to Sarawak Disaster Management Committee (SDMC) chairman, the Deputy Premier Datuk Amar Douglas Uggah Embas. The last time thesundaypost checked with the MCC, which was on June 30, the council engineer said that the funding had not been received yet. Photo, taken right after the collapse of a retaining wall, shows water running fast, eroding all the soil underneath. The affected families are now calling upon the authorities to resolve the issue without further delay. It is their hope that the authorities would immediately repair the retaining walls, the gas pipelines and the sewerage, to ensure the safety and hygiene of their residence and its surroundings. 'We are not asking for luxury. We are asking for basic human dignity; the right to live in our homes without being surrounded by sewage; the right to cook for our families; the right to feel safe in our own backyard,' said Sim. focus landslide lead miri Taman Hilltop


Borneo Post
3 days ago
- Borneo Post
Jalan Kuching Ranger Depo drainage system to get RM300,000 upgrade
Yap (second right) hands over the LoA to the contractor's representative. KUCHING (July 11): The drainage system at Jalan Kuching Ranger Depo, Mile 7 here will get an RM300,000 upgrade. When handing over the letter of award (LoA) to the contractor today, Kota Sentosa assemblyman Wilfred Yap said the upgrading comes under his 2023 Rural Transformation Project (RTP) allocation. It will involve constructing around 300 metres of reinforced concrete drains measuring 1.2 metres wide and between 1.2 and 1.5 metres deep. 'The drainage upgrade is urgently needed to address repeated flash flooding problems affecting the area in front of the Kota Sentosa Library, Tadika Dewan Perniagaan Batu Tujuh, and the Seventh Mile Community Association Hall. 'For years, heavy rainfall has caused overflows that disrupted daily activities, endangered road users, and created inconvenience for the public,' Yap said in a press statement following a site visit with Public Works Department (JKR) officers. He said the project is also necessary due to visible signs of soil erosion along the roadside, which could further undermine road stability and safety if not addressed. Construction work is scheduled to begin immediately and expected to be completed by the middle of November. According to Yap, the project will solve the Mile 7 area's long-standing drainage and flooding issues. 'This project is part of my ongoing commitment to listen to residents' complaints and act decisively to improve public safety and quality of life. I take every report from the community seriously and I will continue working closely with JKR, local leaders, and residents to ensure that infrastructure issues are properly addressed,' he said. He stressed the successful implementation of such projects reflects the Gabungan Parti Sarawak (GPS) government's focus on practical solutions rather than empty promises. 'As your representative, I will always be ready to hear your concerns and work together towards sustainable improvements in Kota Sentosa. I encourage all residents to continue engaging with my service centre so that no issue, big or small, goes unnoticed,' he added. drainage system Jalan Kuching Ranger Depo lead Mile 7 Wilfred Yap