logo
Govt working to form committee to probe allegations against Justice Verma: Sources

Govt working to form committee to probe allegations against Justice Verma: Sources

Hindustan Times4 days ago
The centre is working to form a committee to probe allegations levelled against Justice Yashwant Verma, government sources said on Wednesday. A total of 145 Lok Sabha members signed the impeachment motion against Justice Varma under Articles 124, 217, and 218 of the Constitution.(PTI)
Amid the ongoing monsoon session of Parliament, government sources also said that the government was not yet mulling any discussion in Parliament on the Special Intensive Revision (SIR) exercise being carried out by the Election Commission in Bihar.
This comes after Union Parliamentary Affairs Minister Kiren Rijiju said on Sunday that signatures of over 100 MPs have been collected for the impeachment process against Justice Verma, who is currently under scrutiny after burnt cash was discovered at his residence.
"The signature (collection) is underway, and it has crossed 100 already," Rijiju said while responding to a question about the status of the requisite signatures of MPs for the impeachment exercise against Justice Verma.
When asked about whether the Parliament will take up the issue in this monsoon session scheduled to start on July 21, the Union Minister said, "In the Justice Varma case, the process will be undertaken together by all parties. This is not the move by the government alone. "I can't comment on any business in terms of priority until and unless the matter is passed by the BAC (Business Advisory Committee) with the approval of the chair. It is difficult to make an announcement outside," he added.
On Monday, Members of Parliament submitted a memorandum to the Lok Sabha Speaker Om Birla to remove High Court Justice Yashwant Varma in connection with the cash discovery row.
A total of 145 Lok Sabha members signed the impeachment motion against Justice Varma under Articles 124, 217, and 218 of the Constitution.
MPs from various parties, including Congress, TDP, JDU, JDS, Jan Sena Party, AGP, SS (Shinde), LJSP, SKP, CPM, etc., signed the memorandum.
Notable signatories include MPs Anurag Singh Thakur, Ravi Shankar Prasad, Leader of the Opposition Rahul Gandhi, Rajiv Pratap Rudy, PP Chaudhary, Supriya Sule, KC Venugopal, and others.
Earlier, the sources had informed about the formation of a committee that is likely to include a judge of the Supreme Court, a chief justice from any of the High Courts and a distinguished jurist.
The notices for removal of Justice Varma were given on the first day of the monsoon session of Parliament.
Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

Tripura govt asks NHDCL to complete NH repair work before Durga puja
Tripura govt asks NHDCL to complete NH repair work before Durga puja

Hindustan Times

time29 minutes ago

  • Hindustan Times

Tripura govt asks NHDCL to complete NH repair work before Durga puja

Agartala, The Tripura government has asked the National Highways and Infrastructure Development Corporation Ltd to complete the repair work of the Assam-Agartala National Highway before Durga puja, a senior official said on Sunday. Tripura govt asks NHDCL to complete NH repair work before Durga puja The Durga puja, the biggest festival in the northeastern state, will commence on September 29. Following reports of the bad condition of the national highway from Kumarghat to Churaibari in Unakoti and North districts, PWD secretary Kiran Gitte, along with senior officials of NHIDCL and state PWD, visited the national highway to take stock of the situation on Saturday. Earlier, Chief Minister Manik Saha also held a meeting with officials to review the bad condition or roads, including the national highway and asked for repair works on a war footing. "On Saturday, I travelled over 400 km through the national highway from Khowai to Kamalpur and Churaribari via Manu and Kumarghat. Senior officials from NHIDCL and state PWD also accompanied me. The road from Kumarghat to Churaibari needs immediate repair as several patches of it suffered severe damage due to the ongoing monsoon," Gitte told PTI. According to him, the NHIDCL has been asked to complete the repair work from Kumarghat to Churaibari before Durga puja. "I have asked NHIDCL to complete repair work by Durga puja. I have also told them to bring high officials to see the ground reality", he said. Gitte further added that the state highways or other roads, which are maintained by the state PWD, are better than the national highways executed by the NHIDCL through sub-contractors. West Tripura MP and former CM Biplab Kumar Deb met the Union Minister for Road Transport and Highways, Nitin Gadkari, in Delhi on July 23 and urged him to send high-level officials to the northeastern state to check the condition of roads. "Plans are there to construct sustainable RCC roads in the coming days that can withstand the heavy rainfall in Tripura. Urged the Union minister to send a team consisting of high-level officials for quality checking and identifying the defects and take necessary strict actions," Deb posted on Facebook after meeting with Gadkari. This article was generated from an automated news agency feed without modifications to text.

Ahead of Parliament debate, Congress flags 'background' to Op Sindoor, Trump's '26' ceasefire claims
Ahead of Parliament debate, Congress flags 'background' to Op Sindoor, Trump's '26' ceasefire claims

New Indian Express

time29 minutes ago

  • New Indian Express

Ahead of Parliament debate, Congress flags 'background' to Op Sindoor, Trump's '26' ceasefire claims

NEW DELHI: Ahead of a discussion in Parliament on Operation Sindoor, the Congress on Sunday recapitulated the events forming the backdrop to the debate, prominent among them US President Donald claiming "26 times" since May 10 that he stopped Operation Sindoor by threatening to cut off trade with India. The opposition party said the debate was a long time coming, but "better late than never." "The Lok Sabha is scheduled to begin a 16-hour debate on Pahalgam-Op Sindoor tomorrow and the Rajya Sabha is set to do so the day after tomorrow. The INC had been demanding a special two-day session of Parliament immediately after Operation Sindoor was abruptly halted. That demand was ignored. Nevertheless, better late than never," party leader Jairam Ramesh said in a post on X. The Pahalgam terror attack took place on April 22, but the terrorists directly responsible have still not been brought to justice, the party's general secretary, in-charge, communications, said. Reportedly, they were involved in earlier terror attacks in Poonch (December 2023) and Gangagir and Gulmarg (October 2024), Ramesh said. At the request of the Congress, an all-party meeting was held and chaired, not by Prime Minister Narendra Modi, as demanded, but by the Defence Minister on April 24, where questions on intelligence lapses were raised, he said. On May 30, Chief of Defence Staff General Anil Chauhan made significant revelations on tactical mistakes in the first two days of Operation Sindoor, he said. These revelations were made in Singapore. "On June 29, 2025, the Indian Defence Attache in Indonesia, Group Captain Shiv Kumar, said that political decisions hampered military operations during Operation Sindoor and also appeared to have indicated the extent of our aircraft losses," he said. On July 4, Deputy Chief of Army Staff Lt Gen Rahul R Singh revealed that India contended with and battled against China during Operation Sindoor, both in terms of hardware and software, Ramesh said, calling it a "completely new scenario." "On July 14, 2025, the LG of J&K Manoj Sinha publicly admitted that the Pahalgam terror attacks were undoubtedly a security failure," he said. Ramesh also highlighted that since May 10, Trump has claimed "26 times" that he stopped Operation Sindoor by threatening to cut off trade with India. Trump also claimed that five fighter jets may have been shot down, the Congress leader pointed out. "He (Trump) has hosted the Pakistan Army Chief for lunch which has never been done before. The US Central Command Chief, Gen. Michael Kurilla, had called Pakistan a phenomenal partner in counter-terrorism operations. And just the day before yesterday the US Secretary lauded Pakistan in his meeting with its Deputy PM," Ramesh said. He said the outlandish claims made by sections of the Indian media during Operation Sindoor, "with instigation by the PM's media managers," led to a mockery of whatever serious narrative was sought to be built up. The narrative had more takers at home than in countries where an outreach took place, Ramesh said. Opposition parties have agreed to a special discussion on the Pahalgam terror attack and Operation Sindoor on Monday in Lok Sabha and the next day in Rajya Sabha. The debate is hoped to bring normalcy to Parliament after a virtual washout of the first week's proceedings.

Tripura Sets Durga Puja Deadline For Critical Highway Repairs On Assam-Agartala Route
Tripura Sets Durga Puja Deadline For Critical Highway Repairs On Assam-Agartala Route

Hans India

time29 minutes ago

  • Hans India

Tripura Sets Durga Puja Deadline For Critical Highway Repairs On Assam-Agartala Route

The Tripura state government has issued urgent directives to the National Highways and Infrastructure Development Corporation Ltd (NHDCL) to expedite repair work on the deteriorating Assam-Agartala National Highway before the commencement of Durga puja festivities. The northeastern state's most significant religious celebration is scheduled to begin on September 29, creating a firm deadline for the infrastructure restoration project. The initiative follows mounting concerns about the deplorable condition of critical highway sections, particularly the stretch connecting Kumarghat to Churaibari spanning across Unakoti and North districts. Public Works Department Secretary Kiran Gitte conducted an extensive field inspection on Saturday, covering over 400 kilometers of the national highway route from Khowai to Kamalpur and Churaribari, passing through Manu and Kumarghat areas. During the comprehensive assessment, Gitte was accompanied by senior representatives from both NHDCL and the state PWD department. The inspection revealed severe damage to multiple road segments, with monsoon rainfall exacerbating existing infrastructure problems along the Kumarghat-Churaibari corridor. Chief Minister Manik Saha had previously convened urgent meetings with relevant officials to address the widespread road deterioration affecting both national highways and local routes. The Chief Minister emphasized the need for immediate action, describing the repair efforts as requiring "war footing" urgency given the approaching festival season. Gitte expressed particular concern about the urgent nature of repairs needed between Kumarghat and Churaibari, noting that numerous road patches have sustained significant damage due to the ongoing monsoon season. The PWD secretary has specifically instructed NHDCL to deploy senior officials to personally evaluate ground conditions and ensure quality restoration work. The state official also highlighted a concerning disparity in road maintenance quality, noting that state highways and other routes maintained directly by the state PWD demonstrate superior condition compared to national highways managed by NHDCL through subcontractor arrangements. Political pressure for improved highway conditions has intensified at the federal level as well. West Tripura Member of Parliament and former Chief Minister Biplab Kumar Deb recently met with Union Minister for Road Transport and Highways Nitin Gadkari in New Delhi on July 23. During the meeting, Deb advocated for immediate deployment of high-level federal officials to conduct thorough assessments of road conditions throughout the northeastern state. Following his discussion with the Union Minister, Deb outlined ambitious plans for constructing weather-resistant reinforced concrete cement (RCC) roads designed to withstand Tripura's intense monsoon conditions. He specifically requested the formation of a specialized team comprising senior officials tasked with conducting comprehensive quality assessments, identifying structural defects, and implementing stringent corrective measures. The deteriorating highway conditions pose significant challenges for the approaching Durga puja season, when thousands of devotees and tourists typically travel throughout the state to participate in religious celebrations. The festival represents not only the region's most important cultural event but also a critical period for economic activity dependent on reliable transportation infrastructure. The government's deadline underscores the urgency of completing repairs before the festival rush begins, ensuring safe passage for pilgrims and maintaining the smooth flow of goods and services during this economically vital period for the northeastern state.

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into a world of global content with local flavor? Download Daily8 app today from your preferred app store and start exploring.
app-storeplay-store