logo
Cyclist breaks bones after pothole left unfilled

Cyclist breaks bones after pothole left unfilled

Yahoo23-05-2025
A cyclist was left with a broken cheekbone and elbow after he hit a pothole covered with water before blacking out.
The BBC can reveal Surrey, East and West Sussex, Brighton and Kent councils paid out £4.1m in compensation to road-users over the past five years.
Crowborough resident Gianni Montoro, who was cycling in Station Road in Groombridge, said: "My front wheel never came out of that pothole, my back wheel came up and I got catapulted down to the ground."
East Sussex County Council wished Mr Montoro a speedy recovery and said they carried out a temporary repair before the incident, but could not do a permanent repair due to water on the road.
The pothole was submerged in water and had been reported to East Sussex County Council by a resident four weeks before the accident.
"I hit the ground like a potato bag," Mr Montoro said.
The father-of-two has been cycling for more than 20 years but said the incident had left him shaken.
"The pothole was left, I couldn't see it, I had no idea what was coming, I just know I couldn't swerve to protect myself," added Mr Montoro, who owns the delicatessen Arte Bianca in Tunbridge Wells.
He said: "If any other cyclists had gone the same way that morning they would have had the same destiny as mine. No chance."
The pothole was repaired a few days after the accident.
Groombridge resident Sarah Andrews said she reported the pothole on the Fix My Street App.
She said the council came out and marked the pothole to be fixed but it was not filled in.
Ms Andrews added: "The pothole was bad and was getting progressively worse.
"It was bigger than my foot and I'm a size five, the water was eventually up to my ankle."
Ms Andrews said residents had put a traffic cone in the pothole to alert drivers and cyclists, but the cone got damaged.
"Why didn't the council put up a barrier or cordon it off so people knew it was there?" she added.
Duncan Dollimore, from charity Cycling UK, said potholes could be "potentially life-changing" to cyclists.
Every year 40 cyclists are seriously injured from potholes and between two and three die, Mr Dollimore says.
He added: "It puts people off cycling which has massive health, environmental and wellbeing benefits so we should be doing more to make sure this isn't a problem."
Additional reporting by Alex Bish.
Follow BBC Sussex on Facebook, on X, and on Instagram. Send your story ideas to southeasttoday@bbc.co.uk or WhatsApp us on 08081 002250.
Cyclist thought 'this is it' after pothole crash
Pothole that caused serious cyclist crash not fixed
Unfixed road crack led to cyclist's death
East Sussex County Council
Cycling UK
Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

How Much Fuel Does A Boeing 747 Burn Per Hour, And How Much Can It Hold?
How Much Fuel Does A Boeing 747 Burn Per Hour, And How Much Can It Hold?

Yahoo

time16-07-2025

  • Yahoo

How Much Fuel Does A Boeing 747 Burn Per Hour, And How Much Can It Hold?

Boeing's very first jetliner, the 707, began commercial flights in 1958. A scant 10 years later, the demand for air travel was so great that Boeing unveiled its new 747 to the world, which held more than twice the number of passengers as the 707. Originally, the 747 was to be a double-decker configuration, but engineers struggled with freight capacity and the ability to rapidly evacuate passengers in the event of an emergency. Eventually, a compromise was reached where the double-deck height was still present at the front of the aircraft, creating the 747's unmistakable, signature hump. On cargo-carrying variants of the 747, this clever design facilitated placing the cockpit above and out of the way of the hinged front nose section for loading. The resulting upper-deck area behind the cockpit could be utilized for additional seating or a swinging lounge and bar area. Total passenger capacity depends on how each 747 is configured, but fitting 660 of your fellow humans onboard is possible in a dense layout of exclusively economy seats. For propulsion, the Boeing 747 relies on a brace of four turbofan engines that burn a whopping 3,500 to 3,800 gallons of fuel per hour at cruising speed. The exact fuel burn rate is dependent on the passenger capacity, as well as the particular make and model engines that are installed. Suffice to say, however, the average 747 burns about one gallon of fuel per second. Obviously, that insatiable thirst for kerosene-based Jet A-1 requires a massive fuel capacity to match. Read more: How Much Do Car Salespeople Make? The Pay Structure Explained The Boeing 747 isn't just one of the largest commercial jets, it's also one of the fastest. Its impressive cruising speed of 580 MPH means that one mile is covered every 6.2 seconds. Using the fuel burn rate provided by BBC's Future Planet, that equates to fuel economy of 0.18 miles per gallon. While that figure is certainly shocking, one must also consider that, unlike the latest Toyota Prius, the 747 is carrying hundreds of passengers over which to amortize the expenditure. In order to facilitate such high fuel consumption on the long-haul international routes that are typical of the Boeing 747, it carries approximately 48,400 gallons of fuel. That's enough to get you from, say, New York to London. However, longer routes like Los Angeles to Sydney require more fuel capacity still. Indeed, some variants like the 747-8i Intercontinental carry 63,034 gallons of fuel. So where does 50,000 to 60,000 gallons of fuel go? Primarily, the fuel tanks are located in the aircraft's wings, although select 747s are configured to store additional fuel in the plane's horizontal stabilizer at the tail. Over the years, aviation authorities worldwide relaxed rules that prohibited jets with two engines from operating long overwater flights. That ushered in the dominance of modern aircraft like the Airbus A330 and Boeing's own 777 which are more fuel efficient with only two engines. Nowadays, the 747 passenger jet is disappearing, but it's not altogether gone. If you want to experience the Queen of the Skies one final time, check out our list of airlines that still operate them on certain routes. Want more like this? Join the Jalopnik newsletter to get the latest auto news sent straight to your inbox... Read the original article on Jalopnik.

Jeremy Clarkson reveals text to F1 boss after surprise sacking
Jeremy Clarkson reveals text to F1 boss after surprise sacking

Yahoo

time13-07-2025

  • Yahoo

Jeremy Clarkson reveals text to F1 boss after surprise sacking

Jeremy Clarkson has revealed the text he sent to sacked Christian Horner, comparing it to his own exit from the BBC. Writing in his latest column for The Sun, the former Top Gear host backed the F1 boss who was unexpectedly fired from Red Bull earlier this week. Clarkson expressed his sympathy for the Dutchman, explaining he could relate with his experience being fired as as presented on Top Gear after he punched producer on the show Oisin Tymon. READ MORE: Costs spiral for 'disaster' Oxfordshire high street scheme "I sent him a text after the news of his dismissal broke, pointing out that I've been in his shoes in the past," Clarkson wrote. Christian Horner, pictured at Silverstone, was sacked by Red Bull (Bradley Collyer / PA) "I explained that when you wake the following morning, it's easy to think, 'Well, that's that, then'. "But in my case, that wasn't that. I hadn't trodden on a snake. I'd trodden on a ladder. And I bet he does, too." Help support trusted local news Sign up for a digital subscription now: As a digital subscriber you will get: Unlimited access to the Oxford Mail website Advert-light access Reader rewards Full access to our app After the media personality left Top Gear with the BBC in 2015, Amazon swooped in to offer Clarkson and his co-presenters Richard Hammond and James May three seasons on a car show with a similar premise, which became The Grand Tour. But the real change came when Clarkson switched tack from cars to tractors, took over running his Diddly Squat Farm in Chadlington, and launched Clarkson's Farm in 2021 to much acclaim. With a similar length career in their respective roles - Clarkson had been on Top Gear since 2002, while Horner had been at the helm of Red Bull since 2005 - the Clarkson expects comparable success for the dismissed driving boss. READ MORE: Concerns raised in Didcot as new council HQ approved He wrote: "I spent a bit of time with Christian at the [British] Grand Prix on Sunday. And it was plain he had no inkling at all that the bullet was coming. "He was with his 11-year-old daughter, Olivia, whose mother had just died of eye cancer. And we mostly talked about that and how the poor little mite was coping." He added, however, that Audi coming into the sport next year, along with Cadillac and Chinese teams, would all "jump at the chance of getting Horner," but speculated that, like Clarkson himself, a career change could take him anywhere. Red Bull, meanwhile, are beginning a new era under Laurent Mekies, who admitted he has big shoes to fill. Max Verstappen's future remains in the balance, too, who is currently 69 points behind Oscar Piastri in the drivers' standings, and his stance on his team principal's sacking remains unclear, though he thanked Horner on social media after the announcement. READ MORE: Protests against Wallingford gravel quarry plans near Thames Clarkson's expectations for Red Bull are not positive, however. He wrote: "Well, look what happened to Man United when Ferguson was no longer at the helm. "On that basis, this once-great team may well end up, in a couple of years, in Formula 4."

Opening date for 'major' new road announced
Opening date for 'major' new road announced

Yahoo

time06-07-2025

  • Yahoo

Opening date for 'major' new road announced

The opening date of a "major" new road in East Sussex has been confirmed by the county council. The Queensway Gateway Road, which will connect the A21 Sedlescombe Road North and Queensway in Hastings, is due to open on 31 August. It was originally due to be completed in 2016, but the final section of the road was delayed by an unsuccessful judicial review. Keith Glazier, the council's leader, said: "We appreciate that work on this major project has caused disruption to road users and apologise for any delays, but we hope they will soon be reaping the significant benefits the new road will bring." Helena Dollimore, the MP for Hastings and Rye, told the House of Commons in December that local residents called the project the "road to nowhere" because "it has been left unfinished for over a decade". The local authority said at the time that work on site had been delayed "due to significant remedial works" and a burst water main. The road is part of an East Sussex County Council project to improve traffic flow and transport links between Bexhill and Hastings. The project includes the permanent closure of Junction Road and the creation of a public right of way and cycle path. Major improvements to the A21 Sedlescombe Road North, which include the installation of new traffic signals, are also part of the project. A period of monitoring will follow the opening of the road to ensure traffic is flowing smoothly. Follow BBC Sussex on Facebook, on X, and on Instagram. Send your story ideas to southeasttoday@ or WhatsApp us on 08081 002250. Major highway improvement scheme nearing completion 'Chaos' concern as traffic lights return to A21 Delayed road costs businesses millions, MP says East Sussex County Council

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into a world of global content with local flavor? Download Daily8 app today from your preferred app store and start exploring.
app-storeplay-store