
Heritage committee clears Sadbhavna Daud, Ravan Dahan at Kasturchand Park with riders
2
Nagpur: The Heritage Conservation Committee, chaired by former divisional commissioner Anoop Kumar, on Wednesday, gave conditional clearance for organising Sadbhavna Daud and Ravan Dahan at the iconic Kasturchand Park, a Grade-I heritage site under govt ownership.
While granting no-objection certificates (NOCs) to both Rajiv Gandhi Sadbhavna Daud Organising Committee and Sanatan Dharma Yuvak Sabha, the panel attached a key rider — the organisers must secure separate approvals from the district collectorate and the state public works department (PWD) before proceeding.
Besides this, the Sabha was asked to ensure lesser use of firecrackers, member secretary and NMC chief engineer Manoj Talewar told TOI after attending the meeting.
Sadbhavna Daud will be organised on August 20, the birth anniversary of late Prime Minister Rajiv Gandhi. The organising committee has sought 2000 sq mtr of land in Kasturchand Park for the event. The Ravan Dahan will be organised on October 2, 2025.
The meeting, which reviewed 10 proposals concerning city heritage sites, also took up multiple requests from Central Railway, Nagpur Municipal Corporation, PWD, and INTACH Nagpur chapter for redevelopment, conservation, and public events at heritage-listed premises.
The committee discussed at length Central Railway's request for restoration and redevelopment work at Nagpur Railway Station, a Grade-I heritage structure. The Rail Land Development Authority (RLDA) sought permission through two separate letters dated May 16 and June 9.
A second proposal for hosting a centenary celebration at the station on July 28 — including a heritage gallery and a photo exhibition — was also examined and allowed in principle.
INTACH Nagpur chapter's proposal to document three heritage sites — Munshi Mandir, Sonegaon Lake, and Kashibai Temple Complex — was forwarded to the civic chief, as the committee said it fell outside its purview. INTACH sought Rs1.5 lakh funding and offered to begin work upon receiving 50% of the amount.
In another major case, the committee reviewed NMC's request to carry out structural work on the newly built Town Hall at Raj Rajeshwar Bhosale Mahal, a heritage structure.
The panel asked for detailed architectural and material-use plans before clearing the work.
Similarly, proposals for building a new structure within the govt Institute of Forensic Science premises and for putting up information boards at Zero Mile monument were also reviewed. In the case of Zero Mile, the panel approved the concept but sought updates on its current development status.
A structural audit inspection was also allowed at the Accountant General's Office, with a panel expert to visit the site.
The meeting underscored the need to protect heritage values while accommodating public utility and cultural activities.

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


Time of India
14 hours ago
- Time of India
DM asks officials to expedite work on Kanwar Yatra routes
Varanasi: District magistrate Satyendra Kumar inspected the Kanwar Yatra routes, including key intersections like Girjaghar and Godaulia, in preparation for the upcoming influx of devotees and kanwarias during the month of Shrawan. The inspection aimed to ensure smooth access to the Kashi Vishwanath temple, facilitating easy viewing, water offerings and seamless movement for pilgrims. The DM gathered detailed information about the Kanwar Yatra route from PWD and municipal officials, stressing the importance of timely completion of all tasks. He directed the PWD executive engineer to finish the interlocking work of one lane from the ropeway station to Gurubagh by the next morning. Kumar and additional police commissioner Shivhari Meena inspected the Kanwar Yatra route up to Modela Tiraha and Mohansarai, emphasizing the need for timely completion of tasks. During the inspection at Bhaskar Pokhara, Kumar was informed that over 80% of kanwariyas stop there to bathe and eat, with peak crowds expected on the first Monday of Shrawan and the day before Nag Panchami. He directed repairs for broken lights, thorough cleaning of the premises, and barricading of the pond to ensure a smooth experience for devotees. The DM visited Matadeen Sukul Inter College near Bhaskar Pokhara to assess parking facilities, with Jagatpur Inter College identified as an alternative parking site. He inspected the road from Modela Tiraha to Mohansarai, announcing that the left lane and service lane from Mohansarai to Modela Tiraha would be reserved for devotees and Kanwarias. The DM instructed the PWD executive engineer to ensure robust barricading at key points, including Modela Tiraha and Mohansarai. During this time, ADM city Alok Kumar Verma, DCP Gomti Pramod Kumar, PWD executive engineer KK Singh, along with other officials and police officers, were present.


Time of India
15 hours ago
- Time of India
Experts want study to stop Paroda flooding, Don Bosco's 2015 paper resurfaces
Margao: Following the submergence of Paroda village on Thursday, which necessitated the diversion of traffic along the Margao-Quepem road through Chandor, engineering experts have renewed their call for a study to address the problem of annual flooding during the monsoon. Tired of too many ads? go ad free now The issue has once again highlighted the inadequacy of the flood-prevention measures undertaken by the PWD on the Paroda stretch of the road. Despite the PWD raising the vulnerable road stretch two years ago, the measure proved largely ineffective. A decade-old academic study by the final-year civil engineering students from Don Bosco College of Engineering, Fatorda, has resurfaced as a potential roadmap for long-term flood management solutions. The 2015 dissertation, titled 'Flood Management of Paroda Village', presents a scientifically backed study. The project, supervised by assistant professor Satyesh Kakodkar, proposed a sophisticated flood-diversion system based on extensive topographic and hydrographic surveys of the Kushawati river. The study's core recommendation involves constructing diversion headworks 1,123m upstream of the flood-prone Paroda-Avedem bridge, coupled with a 3,155m diversion canal designed to channel excess water away from the vulnerable area. Particularly significant is the study's proposal for an offline storage pond system, which would temporarily store diverted floodwater in designated areas of the floodplain before releasing it back to the river or alternative watercourses. This approach aims to avoid the submergence of surrounding inhabited areas while effectively managing peak discharge periods. The Don Bosco study also identified solutions aimed at improving water flow capacity during heavy rain. Tired of too many ads? go ad free now These included strategic dredging of the river at Caurem — 200m of riverbed clearing to a depth of 0.3m, extending 100m upstream and downstream of the Caurem bridge. Engineering experts who analysed the study pointed out that its observations remain strikingly relevant today. They have made a strong pitch for state govt to commission a flood management study. They have suggested that either the PWD or the water resources department undertake this research directly or engage the civil engineering departments of Goa's engineering colleges. 'Such a commissioned study would build upon the foundational work already completed by the Don Bosco students, incorporating modern hydrological modelling techniques and climate change projections to develop robust, long-term solutions,' said a civil engineer specialising in hydraulic engineering.


India Today
a day ago
- India Today
CUET UG 2025 results 2025 declared for over 13 lakh students, direct link to check
The CUET UG 2025 result has now been released by the National Testing Agency (NTA). Candidates can download their individual Common University Entrance Test for undergraduates (CUET UG) 2025 scorecards from the official website -- -- to begin the subsequent counselling and admission CUET UG 2025 results also cover the rescheduled exams, including Tamil, Urdu, and accountancy/book keeping. All 37 subjects have been evaluated fairly using normalised exam, held between 13 May and 4 June 2025, was taken by over 13 lakh students across India and TO DOWNLOAD THE SCORECARDVisit the official NTA website: for the 'Activity Board' section on the on the link that says 'CUET UG 2025 Result.'Enter your login credentials:Application numberPassword or date of birthSecurity pin (captcha code)Click Submit to view your CUET UG 2025 scorecard will appear on the and save or print the scorecard for future use during admission and link to download CUET UG result 2025CUET RESULT 2025 LIVE UPDATESWHAT THE SCORECARD INCLUDESThe CUET UG scorecard provides a comprehensive breakdown:Candidate name, roll number, application number, and personal raw and normalised marks, percentile scores and total signature, category, gender, date of birth, and qualifying UG 2025 RESULT LIVE UPDATESBEHIND THE CUET UG RESULTSNTA had first released the provisional answer key on 17 June, followed by a challenge window that closed on 20 CUET UG 2025 final answer key incorporated valid objections, and the result was accordingly finalised and uploaded during the last week of June STEPS: COUNSELLING AND ADMISSIONSNow, universities participating in CUET will publish their own cutoff lists and open admission portals. Since CUET does not offer centralised counselling, each institution will conduct admissions based on individual CUET scores. Applicants must register separately with their desired colleges, choose courses in order of preference, and await seat seats are allotted, candidates must:Accept the seat the required admission documents such as scorecard, highschool mark sheet, identity proof, photos and relevant certificates (e.g. caste, PwD).This may involve online verification or inperson document the CUET UG 2025 result now available, students can move swiftly into counselling and admissions based on individual university timelines. They should keep an eye on respective university portals, verify cutoffs, and complete seat acceptance and fee payment promptly to secure their seats.- Ends