logo
We are game for competition: HAL chief

We are game for competition: HAL chief

The Hindu5 hours ago
The Hindustan Aeronautics Ltd. (HAL), which will have to compete with private firms for manufacturing India's indigenous fifth generation Advanced Medium Combat Aircraft (AMCA) programme, has welcomed the government's move to involve private players.
In May, Defence Minister Rajnath Singh approved the execution model for AMCA and opened the doors for the private sector to compete with the Bengaluru-headquartered defence PSU to manufacture the indigenous fifth generation fighter jet.
End of monopoly
This move ended the monopoly which HAL enjoyed for years when it came to the building prototypes and manufacturing of fighter jets.
HAL chairman and managing director D.K. Sunil said that the PSU had no problem with this move by the government.
'We have no problem with that; we are a very capable company and we are not really afraid of competition. The idea is to develop alternative players to HAL so we are ok with that. We will definitely participate [in the bidding] and we are willing to work with partners to see how to take it forward,' Dr. Sunil told The Hindu.
'I would not take it in a negative sense that our monopoly is ending in that sense. We are a government company and we have been working since 85 years in the interest of the nation; so I think we are ok with that. We do not see any issue in that,' he added.
Under discussion
Asked if HAL had responded to the Expression of Interest (EoI) issued by the Aeronautical Development Agency (ADA) which is executing the programme, Dr. Sunil said, 'The last date is sometime in August. So we will definitely work on this. We are still discussing, we are looking at the details of how the evaluation will be done. We have already issued an EoI to 21 of our partners who have responded that they are interested.'
He added that there were three options before HAL — either to go solo or as a consortium, or go as a joint venture — and that it will evaluate and take a decision in the coming month.
LCA delays
On the delay in the delivery schedule for the LCA Mk-1A variant and on the criticism by Chief of Air Staff Air Chief Marshal A.P. Singh, the HAL chairman reiterated that it was due to the GE Aerospace missing deadline for supply of engines.
'The primary reason is the engine. When he (IAF chief) mentioned in February (about not being confident of HAL during Aero India) we did not have a single engine from GE though the airframe was ready,' Dr. Sunil said. He added that the first engine came in April and that GE had promised the second engine in July.
'Apart from the engines we also have issues regarding the software, the radar, and the missiles. There have been some issues with iterations of the software so both these issues contributed but the engine was the most dominant,' he added.
Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

Helicopter repair facility at Honda to start in 3 months: CM
Helicopter repair facility at Honda to start in 3 months: CM

Time of India

timean hour ago

  • Time of India

Helicopter repair facility at Honda to start in 3 months: CM

Panaji: Chief minister Pramod Sawant on Thursday said that the helicopter repair and overhaul facility at Honda in Sattari will commence its operation within three months. He said that infrastructure work at the facility had been completed. 'Within three months, the facility will commence operations. It will generate employment in the state,' Sawant said. Last week, the CM held discussions with defence minister Rajnath Singh and urged him to commence operations as soon as possible. Singh assured the CM that operations would start. Almost nine years after the foundation stone was laid for the helicopter repair and overhaul facility at Honda, the plant is yet to be made operational. The construction was delayed due to Covid, there was not much progress. Last year, the work resumed and work is now complete. Hindustan Aeronautics Ltd (HAL) and French aerospace giant Safran have signed an MoU to extend cooperation and explore opportunities for new helicopter engines in civil and military markets. HAL, the defence public sector undertaking, and Safran have set up Helicopter Engines MRO Pvt Ltd (HEMRO) as a joint venture to repair TM333 and Shakti gas turbine engines. by Taboola by Taboola Sponsored Links Sponsored Links Promoted Links Promoted Links You May Like Giao dịch vàng CFDs với sàn môi giới tin cậy IC Markets Tìm hiểu thêm Undo The Shakti engine is installed on HAL's advanced light helicopter known as 'Dhruv' and its variants, including 'Rudra' and light combat helicopter. The Ardiden 1U engine powers the new light utility helicopter, a 3-tonne single-engine aircraft. Former defence minister Manohar Parrikar laid the foundation stone for the project in July 2016, but the Goa Industrial Development Corporation gave the green signal to transfer the land to the aerospace firm only in Dec 2017. HAL acquired the assets of the defunct Goa Automobile Accessories Ltd for Rs 7 crore, and with Safran India, will invest Rs 170 crore to set up HEMRO. India's armed forces are among the largest operators of Safran-designed helicopter engines, with over 1,000 engines operational across the country, including 250 TM333 and over 500 Shakti engines. Shakti is the Indian variant of the Safran Ardiden 1H1, co-developed with HAL.

Bajaj, Ather, TVS to cut output amid rare earth magnet shortage on China restrictions
Bajaj, Ather, TVS to cut output amid rare earth magnet shortage on China restrictions

Time of India

timean hour ago

  • Time of India

Bajaj, Ather, TVS to cut output amid rare earth magnet shortage on China restrictions

Live Events (You can now subscribe to our (You can now subscribe to our Economic Times WhatsApp channel Mumbai | New Delhi: India's top electric two-wheeler makers, including Bajaj Auto Ather Energy and TVS Motor Company , are set to cut production this month due to a prolonged disruption in the supply of heavy rare earth (HRE) magnets from shortage, now in its fourth month, is threatening to slow the sector's rapid growth, industry executives said. Bajaj Auto , India's second-largest EV two-wheeler maker, is likely to halve its output, while Bengaluru-based Ather Energy plans to scale down production by 8-10%, people familiar with the developments told ET. TVS, which has topped sales for three consecutive months, is also expected to pare three firms are grappling with the shortage of HRE magnets, critical for electric traction motors."The disruptions in the EV supply chain, particularly concerning magnet availability, continue to pose challenges in the short to medium term," a TVS Motor spokesperson said. "We are working actively to mitigate the prevailing challenges."Former market leader Ola Electric, however, said it will maintain production uninterrupted, having stockpiled rare earth magnets ahead of time."There is no impact on production because of the rare earth magnets," an Ola Electric spokesperson said, declining to elaborate four firms account for eight out of every ten e-two wheelers sold in the local market."We've started to see some production disruption on the Chetak line," said Rakesh Sharma, executive director at Bajaj Auto. "Our R&D and procurement teams are working on alternatives, which are now in advanced stages of development," he email sent to Ather remained unanswered until press time automobile industry and the central government have been holding discussions with Chinese authorities to restore supplies of rare earth elements (REEs) and magnets and also have initiated negotiations with alternative suppliers like Vietnam, Indonesia and Japan. However, the shortage is persisting."There has been no progress on resuming magnet imports from China," said a senior industry executive. "TVS, Bajaj, and Ather are the first to be hit, but the entire segment could face disruption if the issue drags on."In June, the Society of Indian Automobile Manufacturers (SIAM) had warned that if supplies did not resume soon, manufacturers could be forced to scale back output due to dwindling inventories."If the current standoff continues, the EV sector's momentum could lose steam just as it begins to scale up," a top executive at a leading original equipment maker (OEM) told ET on condition of challenge comes at a time when the electric two-wheeler market continues to gain traction. Their sales surged 34% year-on-year in the first quarter of FY26 to about 298,000 units, according to data from the government's Vahan Ola has an inventory of rare earth magnet to last at least five to six months and it's also working on alternate supply chain solutions, people aware of the company's plans said. The company may even marginally increase production in July, they said.A lesser impact on Ola also comes against the backdrop of the company's underperformance. Ola Electric slipped to third place in June for the second straight month.

Maieutic Semiconductor raises $4 million
Maieutic Semiconductor raises $4 million

Economic Times

time2 hours ago

  • Economic Times

Maieutic Semiconductor raises $4 million

Bengaluru-based deep tech startup Maieutic Semiconductor has raised $4.15 million in a funding round co-led by Endiya Partners and Exfinity Venture Partners, the company said on Thursday. The start-up is working on chip design by introducing generative AI to design and development workflows. "We are thrilled to have raised this round of funding and are incredibly grateful to have visionary partners like Endiya Partners and Exfinity Venture Partners on board, who not only believe in our mission but are actively supporting us as we build for the future of chip design," Rajendran said. With this new round of funding, Maieutic plans to expand its engineering team and significantly improve time to market. The company is on an aggressive hiring trajectory to build out its platform and take its vision to market. Founded by serial entrepreneurs and industry veterans, Maieutic's core team includes Gireesh Rajendran (CEO), Ashish Lachhwani (CBO), Rakesh Kumar (CPO), and Krishna Sankar (CTO), each a domain expert with over two decades of experience in semiconductor design, AI systems, and commercial product delivery. Collectively, the team holds over 70 patents and has shipped products that have sold over a billion units globally.

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into a world of global content with local flavor? Download Daily8 app today from your preferred app store and start exploring.
app-storeplay-store