
‘Glitch' in display changes bogie positions at last minute, passengers run around Ajni station
3 of Ajni railway station.
The train, scheduled to depart at 3.15pm and reach Pune at 6.25am the next day, was delayed on Friday and did not arrive until 3.50pm. In the meantime, passengers — especially senior citizens — were left scrambling along the length of the platform in search of their coaches as platform indicators kept displaying incorrect information.
"There was total mismanagement. The B1 coach, which was supposed to be at the rear, was shown at the front.
Then the position was changed. One of the attendants told us it had been reversed three times," said Venkatesh Iyer, a harried passenger. "No proper display was given. The final position did not match what was shown earlier on the platform boards."
Speaking to TOI, a senior railway official clarified that it was a minor technical glitch and only a temporary one. "We had shifted some trains from the main station to Ajni, and this was the first such train.
The signboards required updated data — it was a glitch, which was sorted within 15 minutes," the official said.
However, many passengers reported that after finally locating their coaches, they had to rush to the opposite end of the platform multiple times due to last-minute changes in the displays. "Everyone was running around in panic. Seniors were especially troubled," said another passenger Rohit Sharma. "We went from front to back, then back to front.
It was done three or four times."
Passengers described the boarding experience as 'nightmarish' due to the repeated shuffling of coach positions and lack of real-time announcements or assistance. Some even missed boarding in the confusion and had to be helped into the train at the last moment.
The train rake reportedly arrived just 30 minutes before departure, adding to the confusion. While passengers expected order and clarity, the display boards kept changing the coach positions, contradicting what officials on the ground were telling them.
Passengers have urged the Central Railway authorities to improve platform coordination, especially in cases where rake or last-minute changes are involved.

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


Time of India
15 hours ago
- Time of India
Forest dept draws up master plan for Kappatagudda ecotourism
Pic: A view of the scenic Kappatagudda area Gadag: Following the final notification declaring a 423.7 sq km area around Kappatagudda Wildlife Sanctuary as an eco sensitive zone by the Union ministry of environment, forest, and climate change, the state forest department has drawn up an Rs 18.3 crore tourism development master plan. Santosh Kumar Kenchappanavar, deputy conservator of forests, Gadag division, told TOI that the tourism department requested the forest department to submit a detailed project report on eco-tourism development under its 'One District One Destination' initiative in the hills. "We ensured compliance with wildlife norms and ensured that the habitat and movement of wild animals are not affected. We classified areas into A, B and C sites. Now we are waiting for the approval of the plan from the tourism department," he stated. Ashok Mandali, chairman of the Gadag taluk's Five Guarantees Schemes Implementation Authority, said: "The govt announced in the previous budget that it will encourage eco-tourism in Kappatagudda hills, which is an iconic identity of Gadag district. The tourism department will allocate grants on a priority basis." Sources in the forest department said site A is meant for the entrance, information centre, trekking paths, medicinal plants, viewpoints and adventure sports. by Taboola by Taboola Sponsored Links Sponsored Links Promoted Links Promoted Links You May Like Ukraine: New Container Houses (Prices May Surprise You) Container House | Search Ads Search Now Undo "Site B is proposed for a wildlife and nature information centre, medicinal plants' gardens displaying scientific information on plants and facilities for medicinal plants experts. Nature camps, accommodation, a star-gazing tower, and other facilities are proposed in site C," they added. However, Shivakumara Swamiji of Nandiveri Mutt, located in Kappatagudda, said more human intervention leads to deforestation. "There is a need for eco-sensitive tourism. If tourists continue their habit of throwing plastic, destroying plants, and disturbing the habitat and movement of wild animals, the Kappatagudda hills may be polluted. Currently, weeds like lantana and parthenium are growing rapidly in the hills. The boundary of 80,000 acres was fixed by the British in 1890 itself, and there is a need to identify it. The govt has the responsibility of conserving the herbal heritage and habitat of Lambani tandas. Hence, a public hearing should be conducted before taking up any such major developmental works," he said.


Time of India
17 hours ago
- Time of India
‘Glitch' in display changes bogie positions at last minute, passengers run around Ajni station
Nagpur: Passengers boarding the Nagpur–Pune Humsafar Express (train no. 22142) on Friday faced severe inconvenience and chaos after the coach positions were changed multiple times on the display boards, triggering panic and confusion on platform no. 3 of Ajni railway station. The train, scheduled to depart at 3.15pm and reach Pune at 6.25am the next day, was delayed on Friday and did not arrive until 3.50pm. In the meantime, passengers — especially senior citizens — were left scrambling along the length of the platform in search of their coaches as platform indicators kept displaying incorrect information. "There was total mismanagement. The B1 coach, which was supposed to be at the rear, was shown at the front. Then the position was changed. One of the attendants told us it had been reversed three times," said Venkatesh Iyer, a harried passenger. "No proper display was given. The final position did not match what was shown earlier on the platform boards." Speaking to TOI, a senior railway official clarified that it was a minor technical glitch and only a temporary one. "We had shifted some trains from the main station to Ajni, and this was the first such train. The signboards required updated data — it was a glitch, which was sorted within 15 minutes," the official said. However, many passengers reported that after finally locating their coaches, they had to rush to the opposite end of the platform multiple times due to last-minute changes in the displays. "Everyone was running around in panic. Seniors were especially troubled," said another passenger Rohit Sharma. "We went from front to back, then back to front. It was done three or four times." Passengers described the boarding experience as 'nightmarish' due to the repeated shuffling of coach positions and lack of real-time announcements or assistance. Some even missed boarding in the confusion and had to be helped into the train at the last moment. The train rake reportedly arrived just 30 minutes before departure, adding to the confusion. While passengers expected order and clarity, the display boards kept changing the coach positions, contradicting what officials on the ground were telling them. Passengers have urged the Central Railway authorities to improve platform coordination, especially in cases where rake or last-minute changes are involved.


Time of India
a day ago
- Time of India
Shrawan woes: Kashi roads in shambles, kanwariyas to face hardships in city
1 2 Varanasi: Pilgrims and kanwariyas heading to Kashi during the auspicious month of Shrawan starting July 11 may face challenges due to the dismal condition of the route, particularly around Godowlia. The road between Girjaghar and Godowlia crossings is severely damaged, especially after the Ghodanala was affected during the ropeway project, and remains unrepaired, making it difficult even for pedestrians. Additionally, construction material for the ropeway structures has also kept the road occupied. To meet the challenge of crowd regulation, the police have planned to divert kanwariyas and other pilgrims towards Sonarpura, which will compel them to walk extra miles. The situation may worsen for kanwariyas coming from the Prayagraj side if it rains, as other routes will also pose challenges, compounding the difficulties. When TOI took stock of the area between Girjaghar and Godowlia crossings, through which about 60% of the total pilgrims and kanwariyas reach Kashi Vishwanath temple and Dashaswamedh Ghat during the holy month of Shrawan, shocking facts surfaced. The Girjaghar crossing is facing congestion due to the assembly of a steel structure and dumping of its parts in a disorganized manner. by Taboola by Taboola Sponsored Links Sponsored Links Promoted Links Promoted Links You May Like Seniors Ditching Expensive Health Cover for This Smarter Choice Health Insurance Comparison Learn More Undo Additionally, e-rickshaws are occupying the remaining space, causing difficulties for locals and pilgrims to walk comfortably. The Girjaghar-Godowlia road has become impassable due to damage to Ghodanala, with one lane completely blocked. The opposite lane is also in poor condition, leaving only a 2-meter-wide space for pedestrians. The road's condition has worsened over the past year due to ropeway project work, particularly with the piling for the last tower (T29). After piling 7 metres deep for the T29 tower construction, water seepage occurred on June 14, forcing a halt in earthworks. An evacuation order was issued for nearby buildings the next day. Now, UP Jal Nigam is investigating the source of the seepage, but repair work remains incomplete. When contacted, commissioner of police Mohit Agrawal explained how the crowd movement will be managed during the Shrawan month. He said, "We will divert kanwariyas and pilgrims coming via Rathyatra, Luxa and Naisadak towards Sonarpura to reach Godowlia via Jangambadi like it was done on the days of heavy crowding during Maha Kumbh. Diversions will also be ensured on other available routes." This diversion will add three to five kilometres extra to the journey of Kanwariyas and pilgrims, who walk on foot to reach Kashi Vishwanath temple. Despite all these ground realities, district magistrate Satyendra Kumar has not lost hope. He said, "We are making efforts to ensure that at least one lane of Girjaghar-Godowlia road becomes available for pedestrian movement by intensifying necessary repair works in the next seven days." The kanwariyas from the Prayagraj side, who opt for the Marhauli route to reach Kashi Vishwanath temple via Manduadih-Rathyatra, will have testing times in case of spells of heavy rainfall as it leaves many points between Mudaila and Manduadih waterlogged for a long time. The district administration could begin works of cleaning of choked drains on this route when barricading to reserve one for Kanwariyas movement had already been done. Before the officials could meet the challenges existing on the Mudaila-Manduadih road, a big portion of the airport road at Gilat Bazar crossing caved in. This crossing is the city's entry point for vehicles coming from Lucknow-Jaunpur. A large number of Kanwariyas also enter the city through this crossing.