logo
Presentation to Gold Coast Gold Conference

Presentation to Gold Coast Gold Conference

Yahoo14-04-2025
ADELAIDE, AUSTRALIA / / April 14, 2025 / Barton Gold Holdings Limited (ASX:BGD) (Barton or the Company) advises that the attached presentation is due to be presented today at the Gold Coast Gold Conference.
A copy of this presentation can be accessed on the ASX website, the investor section of Barton's website, or directly by clicking here.
Authorised by the Managing Director of Barton Gold Holdings Limited.
For further information, please contact:
Alexander ScanlonManaging Directora.scanlon@bartongold.com.au+61 425 226 649
Jade CookCompany Secretarycosec@bartongold.com.au+61 8 9322 1587
About Barton Gold
Barton Gold is an ASX, OTCQB and Frankfurt Stock Exchange listed Australian gold developer targeting future gold production of 150,000oz annually, with ~1.7Moz Au JORC Mineral Resources (64.0Mt @ 0.83 g/t Au), brownfield mines, and 100% ownership of the region's only gold mill in the renowned Gawler Craton of South Australia.*
Tarcoola Gold Project
Tunkillia Gold Project
Key Regional Infrastructure
Competent Persons Statement & Previously Reported Information
The information in this announcement that relates to the historic Exploration Results and Mineral Resources as listed in the table below is based on, and fairly represents, information and supporting documentation prepared by the Competent Person whose name appears in the same row, who is an employee of or independent consultant to the Company and is a Member or Fellow of the Australasian Institute of Mining and Metallurgy (AusIMM), Australian Institute of Geoscientists (AIG) or a Recognised Professional Organisation (RPO). Each person named in the table below has sufficient experience which is relevant to the style of mineralisation and types of deposits under consideration and to the activity which he has undertaken to quality as a Competent Person as defined in the JORC Code 2012 (JORC).
Activity
Competent Person
Membership
Status
Tarcoola Mineral Resource (Stockpiles)
Dr Andrew Fowler (Consultant)
AusIMM
Member
Tarcoola Mineral Resource (Perseverance Mine)
Mr Ian Taylor (Consultant)
AusIMM
Fellow
Tarcoola Exploration Results (until 15 Nov 2021)
Mr Colin Skidmore (Consultant)
AIG
Member
Tarcoola Exploration Results (after 15 Nov 2021)
Mr Marc Twining (Employee)
AusIMM
Member
Tunkillia Exploration Results (until 15 Nov 2021)
Mr Colin Skidmore (Consultant)
AIG
Member
Tunkillia Exploration Results (after 15 Nov 2021)
Mr Marc Twining (Employee)
AusIMM
Member
Tunkillia Mineral Resource
Mr Ian Taylor (Consultant)
AusIMM
Fellow
Challenger Mineral Resource
Mr Dale Sims (Consultant)
AusIMM / AIG
Fellow / Member
The information relating to historic Exploration Results and Mineral Resources in this announcement is extracted from the Company's Prospectus dated 14 May 2021 or as otherwise noted in this announcement, available from the Company's website at www.bartongold.com.au or on the ASX website www.asx.com.au. The Company confirms that it is not aware of any new information or data that materially affects the Exploration Results and Mineral Resource information included in previous announcements and, in the case of estimates of Mineral Resources, that all material assumptions and technical parameters underpinning the estimates, and any production targets and forecast financial information derived from the production targets, continue to apply and have not materially changed. The Company confirms that the form and context in which the applicable Competent Persons' findings are presented have not been materially modified from the previous announcements.
Cautionary Statement Regarding Forward-Looking Information
This document may contain forward-looking statements. Forward-looking statements are often, but not always, identified by the use of words such as "seek", "anticipate", "believe", "plan", "expect", "target" and "intend" and statements than an event or result "may", "will", "should", "would", "could", or "might" occur or be achieved and other similar expressions. Forward-looking information is subject to business, legal and economic risks and uncertainties and other factors that could cause actual results to differ materially from those contained in forward-looking statements. Such factors include, among other things, risks relating to property interests, the global economic climate, commodity prices, sovereign and legal risks, and environmental risks. Forward-looking statements are based upon estimates and opinions at the date the statements are made. Barton undertakes no obligation to update these forward-looking statements for events or circumstances that occur subsequent to such dates or to update or keep current any of the information contained herein. Any estimates or projections as to events that may occur in the future (including projections of revenue, expense, net income and performance) are based upon the best judgment of Barton from information available as of the date of this document. There is no guarantee that any of these estimates or projections will be achieved. Actual results will vary from the projections and such variations may be material. Nothing contained herein is, or shall be relied upon as, a promise or representation as to the past or future. Any reliance placed by the reader on this document, or on any forward-looking statement contained in or referred to in this document will be solely at the readers own risk, and readers are cautioned not to place undue reliance on forward-looking statements due to the inherent uncertainty thereof.
* Refer to Barton Prospectus dated 14 May 2021 and ASX announcement dated 4 March 2025. Total Barton JORC (2012) Mineral Resources include 909koz Au (30.8Mt @ 0.92 g/t Au) in Indicated category and 799koz Au (33.2Mt @ 0.75 g/t Au) in Inferred category, and 3,070koz Ag (34.5Mt @ 2.80 g/t Ag) in Inferred category as a subset of Tunkillia gold JORC (2012) Mineral Resources.
SOURCE: Barton Gold Holdings Limited
View the original press release on ACCESS Newswire
Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

Brisbane Olympics 2032 main stadium gets major funding boost from federal, state governments
Brisbane Olympics 2032 main stadium gets major funding boost from federal, state governments

Hamilton Spectator

time3 hours ago

  • Hamilton Spectator

Brisbane Olympics 2032 main stadium gets major funding boost from federal, state governments

BRISBANE, Australia (AP) — Queensland state officials said Thursday they had secured a deal with the federal government for the 2032 Olympics in Brisbane which commits 50-50 funding for minor venues and 1.2 billion Australian dollars ($788 million) toward a new main stadium at Brisbane's Victoria Park. The federal government is set to invest more than 3.4 billion Australian dollars ($2.23 billion) in the Games — the single largest contribution towards sporting infrastructure in Australia's history, federal Infrastructure Minister Catherine King said. 'It is about ensuring that when we hand the keys back after the closing ceremony, Queensland has the infrastructure it needs to build on this incredible legacy for decades to come,' King said. The centerpiece of Brisbane 2032 is a proposed 63,000-seat stadium at the inner-city Victoria Park. Investigative works at the site have begun with geotechnical studies and soil sampling ongoing. Brisbane 2032 chief executive Andrew Liveris welcomed the agreement and said he hopes construction will begin at major venues by the end of 2026. 'Today marks a significant shift in forward momentum following the Queensland government's announcement in March of its 2032 Delivery Plan,' Liveris said. The International Olympic Committee has backed the Queensland government's 2032 venue plan after several false starts, saying the Brisbane Games are 'on the right path.' In May, Kirsty Coventry was in Brisbane for a three-day inspection visit before she took over as IOC president. AP Olympics at

Why ASIC Owes Jamie McIntyre and His Investors Far More Than $5.81 Million
Why ASIC Owes Jamie McIntyre and His Investors Far More Than $5.81 Million

Time Business News

time3 hours ago

  • Time Business News

Why ASIC Owes Jamie McIntyre and His Investors Far More Than $5.81 Million

Why ASIC Owes Jamie McIntyre and His Investors Far More Than $5.81 Million In what could become one of the most controversial and politically explosive financial scandals in recent Australian history, questions are intensifying around the conduct of government agencies such as the Australian Securities and Investments Commission (ASIC), and whether they owe not only Jamie McIntyre a refund of $5.81 million-but also potentially hundreds of millions in compensation to him and his investors. The heart of the issue lies not just in financial mismanagement or regulatory overreach, but in what appears to be an orchestrated abuse of judicial and government power. McIntyre-entrepreneur, early Bitcoin investor, founder of independent media outlet Australian National Review ( and political activist-has long claimed that he and his business ventures were unfairly targeted due to his outspoken opposition to government corruption, his efforts to disrupt the political status quo, and his exposure of corporate and pharmaceutical fraud. The Origins of the Attack Jamie McIntyre rose to prominence in the early 2000s for his work in financial education and wealth creation. By 2013, his ambitions expanded into the political and media arenas with the launch of the political party 21st Century Australia and the news platform Australian National Review. The media outlet quickly became a voice for independent thinkers, political dissidents, and health freedom advocates, challenging mainstream narratives and providing platforms for whistleblowers. His biggest 'crime,' many argue, was telling his readers to buy Bitcoin when it was just $75-years ahead of the financial mainstream. He was one of Australia's earliest and most vocal crypto advocates. The success of that advice alone created thousands of new millionaires and financially independent readers, something that did not sit well with traditional banking and political interests. What followed was an intense and persistent campaign against McIntyre-culminating in ASIC actions, media smears, court proceedings, and asset freezes. He and his supporters argue that the legal actions were not driven by legitimate regulatory concerns, but rather by political retaliation. Abuse of Power and Judicial Manipulation The central allegation is that ASIC and other agencies knowingly misled Supreme Court judges by presenting distorted, incomplete, or outright false information-causing significant financial losses to McIntyre and his investors, which are now estimated to be as high as $250 million. Using taxpayer-funded resources, regulators allegedly abused the legal system to shut down McIntyre's ventures, freeze his assets, and destroy investor confidence. For many, this was not regulation-it was weaponized bureaucracy designed to silence a dissident. Critics argue that ASIC and its allies pursued McIntyre with more aggression than they ever applied to the executives of collapsed banks or corporations whose failures harmed hundreds of thousands of Australians. Meanwhile, the damage to McIntyre's companies, personal reputation, and investor capital went largely unacknowledged. A Call for Justice and Accountability Now, with mounting pressure and emerging documentation of judicial misconduct and regulatory overreach, calls are growing for a Royal Commission into ASIC's actions-not just in McIntyre's case, but in a broader context of how independent entrepreneurs and media voices are treated in Australia. While the return of $5.81 million-ordered or negotiated through the courts-is a start, it does little to address the massive real-world losses incurred by McIntyre and his investor base. Compensation, some argue, should be calculated not only on direct losses, but on opportunity cost, damage to business continuity, reputation, and the suppression of one of Australia's first truly independent media platforms. Silencing Political Dissent This case is not just about money. It is about freedom of speech, political persecution, and whether Australia is still a nation where independent thought is protected-or punished. McIntyre's exposure of the vaccine industry, his political aspirations, and his refusal to be silenced by institutional power made him a target. But in doing so, he also became a symbol for thousands of Australians who feel equally bullied, censored, or financially devastated by regulatory overreach. Final Thoughts If Australia is to maintain its reputation as a fair and democratic society, it must take seriously allegations of regulatory abuse. Compensation to McIntyre and his investors is not just justified-it is necessary to restore public trust and to send a clear message: that the political persecution of entrepreneurs and independent media voices will not be tolerated in a free society. This is more than a personal battle. It is a national reckoning with the unchecked power of unelected bureaucrats who, for too long, have operated with impunity. Contact Media : Contact Name : Cherine Delourelle Email : chertou@ TIME BUSINESS NEWS

Brisbane 2032 main stadium gets major funding boost from federal, state governments
Brisbane 2032 main stadium gets major funding boost from federal, state governments

San Francisco Chronicle​

time3 hours ago

  • San Francisco Chronicle​

Brisbane 2032 main stadium gets major funding boost from federal, state governments

BRISBANE, Australia (AP) — Queensland state officials said Thursday they had secured a deal with the federal government for the 2032 Olympics in Brisbane which commits 50-50 funding for minor venues and 1.2 billion Australian dollars ($788 million) toward a new main stadium at Brisbane's Victoria Park. The federal government is set to invest more than 3.4 billion Australian dollars ($2.23 billion) in the Games — the single largest contribution towards sporting infrastructure in Australia's history, federal Infrastructure Minister Catherine King said. 'It is about ensuring that when we hand the keys back after the closing ceremony, Queensland has the infrastructure it needs to build on this incredible legacy for decades to come,' King said. The centerpiece of Brisbane 2032 is a proposed 63,000-seat stadium at the inner-city Victoria Park. Investigative works at the site have begun with geotechnical studies and soil sampling ongoing. Brisbane 2032 chief executive Andrew Liveris welcomed the agreement and said he hopes construction will begin at major venues by the end of 2026. 'Today marks a significant shift in forward momentum following the Queensland government's announcement in March of its 2032 Delivery Plan,' Liveris said. The International Olympic Committee has backed the Queensland government's 2032 venue plan after several false starts, saying the Brisbane Games are 'on the right path."

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into a world of global content with local flavor? Download Daily8 app today from your preferred app store and start exploring.
app-storeplay-store