logo
‘Circular Railway DPR around Bengaluru to be ready by August'

‘Circular Railway DPR around Bengaluru to be ready by August'

BENGALURU: The Detailed Project Report (DPR) for the 288-km Circular Railway Project around Bengaluru will be completed and submitted to the Railway Board by August 2025, stated Divisional Railway Manager, Bengaluru Division, South Western Railway (SWR), Ashutosh Kumar Singh, on Thursday.
Singh said the DPR is part of a larger push to expand rail infrastructure. The project is designed to decongest urban traffic through a seven-leg rail network circling the city. Final Location Survey has already been sanctioned, and DPR preparation is under way.
Addressing the delays in the Bengaluru Suburban Rail Project (BSRP), the SWR officials clarified that while the project is managed by K-RIDE, the Railway division has provided all requested land for Corridors 2 and 4 of the total 4 corridors. 'For Corridor 1, the process is still on. Once it's finalised, we will hand it over,' an official said.
Meanwhile, the KSR Railway Station is set to receive two additional platforms, to the existing 10 platforms, at an estimated cost of Rs 222 crore. The expansion will involve the demolition of a portion of the MG Railway Colony, and a fourth entrance to the station is also planned.
Other major infrastructure upgrades include the redevelopment of the Bengaluru Cantonment Station at a cost of Rs 484.58 crore, and the ongoing quadrupling of the 38-km Bengaluru Cantonment-Whitefield section.
Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

Vida VX2 electric scooter launched, price starts at Rs 59,490
Vida VX2 electric scooter launched, price starts at Rs 59,490

India Today

time27 minutes ago

  • India Today

Vida VX2 electric scooter launched, price starts at Rs 59,490

Vida, Hero MotoCorp's electric mobility brand, has launched the new VX2 electric scooter, With prices starting at Rs 59,490 (ex-showroom).Two variants with Battery-as-a-Service optionThe VX2 is available in two variants, VX2 Go and VX2 Plus and introduces an Battery-as-a-Service (BaaS) model. This allows customers to lease the battery instead of buying it outright, significantly reducing the upfront cost. Under this plan, the VX2 Go is priced at Rs 59,490 (ex-showroom) and the VX2 Plus at Rs 64,990 (ex-showroom). Without BaaS, the prices go up to Rs 99,490 (ex-showroom) for the Go variant and Rs 1,09,990 for the Plus (ex-showroom). advertisementBattery, range, and charging capabilitiesVida claims that the BaaS model brings down running costs to just Rs 0.96 per kilometre. As an added benefit, if battery performance drops below 70%, Vida will replace it free of charge during the subscription period. The VX2 Go features a 2.2kWh battery that delivers an IDC-certified range of up to 92km, while the VX2 Plus gets a larger 3.4kWh battery capable of up to 142km on a full charge. Both batteries are removable, offering flexible three-way charging options. Fast charging allows the battery to reach 80% in just 60 minutes. Using the standard 580W charger, a full charge takes about 3 hours and 53 minutes for the Go and around 5 hours and 39 minutes for the VX2 rides on 12-inch wheels, features a sleek, flowing design with a familiar Vida silhouette and comes in seven contemporary colour options, including exclusive shades for the Plus variant. The scooter gets a long, flat single-piece seat, a pillion backrest, and a practical front-mounted frunk for added utility. Underseat storage is generous, 33.2 litres in the Go variant and slightly less in the Plus due to its dual battery and featuresadvertisementIn terms of tech, both variants come equipped with cloud connectivity, remote immobilisation, turn-by-turn navigation, and real-time ride statistics via smartphone integration. The Go variant sports a 4.3-inch LCD display and offers two riding modes, Eco and Ride. The Plus variant upgrades to a 4.3-inch TFT display and includes an additional Sport mode. Both offer Firmware Over-The-Air (FOTA) updates, enhancing the experience over is backing the VX2 with India's largest EV ecosystem, which includes over 3,600 charging points and more than 500 sales and service centres. A comprehensive warranty of 5 years or 50,000 km further boosts customer confidence. The launch of the VX2 marks a significant milestone in Vida's mission to build not just electric vehicles but an ecosystem that empowers cleaner, smarter on the occasion, Dr Pawan Munjal, Executive Chairman of Hero MotoCorp, said, "VIDA was born from a vision far greater than building electric vehicles—we set out to spark a movement. A movement that puts people and planet first, that redefines mobility as a force for good, and that gives every individual—not just the few—the opportunity to thrive, grow, and live better. VIDA means 'life'—and that is exactly what we aim to bring: cleaner air, better choices, and smarter journeys. A name that reflects our purpose—to drive meaningful progress and create a positive impact, not just in cities, but across every corner of Bharat and the world. On the birth anniversary of our Founder Chairman, Dr. Brijmohan Lall Munjal, we renew our commitment to build a future that is smart, connected, and conscious. With the VIDA VX2 EVOOTER, we are not simply launching a product—we are delivering an ecosystem that empowers change. This is our promise: to make sustainable mobility widely accessible, to make our products highly affordable, and to always lead with trust, responsibility, and purpose. Backed by Hero MotoCorp's legacy, VIDA will power a better tomorrow—for everyone."Subscribe to Auto Today Magazine- Ends

Cabinet clears ₹1,853 crore Tamil Nadu highway project under HAM
Cabinet clears ₹1,853 crore Tamil Nadu highway project under HAM

Business Standard

time30 minutes ago

  • Business Standard

Cabinet clears ₹1,853 crore Tamil Nadu highway project under HAM

The Union Cabinet on Tuesday approved a national highway project in Tamil Nadu at a cost of Rs 1,853 crore in Hybrid Annuity Mode (HAM), Union Minister of Information and Broadcasting Ashwini Vaishnaw announced. The 46.6-kilometre four-lane project between Paramakudi and Ramanathapuram will reduce travel woes between Madurai, Paramakudi, Ramanathapuram, Mandapam, Rameshwaram and Dhanushkodi – the travel is dependent on the existing two-lane National Highway 87 (NH-87) and associated state highways, which experience significant congestion due to high traffic volumes, especially in densely populated stretches and key towns along the corridor. 'To address these challenges, the project will upgrade approximately 46.7 km of NH-87 from Paramakudi to Ramanathapuram to a four-lane configuration. This will decongest the existing corridor, improve safety, and cater to the mobility needs of rapidly growing towns such as Paramakudi, Sathirakudi, Achundanvayal and Ramanathapuram,' the Cabinet said in a statement. According to the Cabinet, the Paramakudi–Ramanathapuram section will play a pivotal role in regional economic growth by strengthening connectivity between major religious and economic centres. This will boost tourism to Rameshwaram and Dhanushkodi, and open new avenues for trade and industrial development. 'The project will also generate approximately 840,000 person-days of direct and 1 million person-days of indirect employment, and will open new avenues of growth, development and prosperity in surrounding regions,' it said. The corridor has an average daily traffic of 12,700 passenger car units. The civil cost of the project is Rs 997 crore and the land acquisition cost is Rs 340 crore.

Saraswat Bank proposes to acquire ailing New India Co-operative Bank
Saraswat Bank proposes to acquire ailing New India Co-operative Bank

Business Standard

time31 minutes ago

  • Business Standard

Saraswat Bank proposes to acquire ailing New India Co-operative Bank

Saraswat Bank seeks RBI nod to merge with ailing New India Co-operative Bank, assuring depositors' protection and turnaround in 18-24 months Aathira Varier Abhijit Lele Mumbai Listen to This Article Saraswat Co-operative Bank has approached the Reserve Bank of India (RBI) to merge with ailing New India Co-operative Bank (New India), subject to shareholder approval of both the banks. In February, the RBI prohibited the Mumbai-based New India Co-operative Bank from issuing fresh loans and suspended deposit withdrawals for six months, starting 13 February. The RBI then superseded the board and appointed an administrator to manage the affairs of the bank. Later, depositors were allowed to withdraw up to Rs 25,000. The RBI's intervention was triggered by allegations of fund misappropriation by some officials of New India Co-operative Bank. The

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into a world of global content with local flavor? Download Daily8 app today from your preferred app store and start exploring.
app-storeplay-store