
Dialogue with farmers will continue, says agriculture minister; concludes 15-day agri campaign
Shivraj Singh Chouhan
on Thursday concluded the 15-day '
Viksit Krishi Sankalp Abhiyan
' at a Kisan Sammelan in Bardoli, Gujarat, emphasising that while the campaign was ending, the government's engagement with farmers would continue unabated.
Speaking at the venue that holds historical significance as the site of Sardar Vallabhbhai Patel's Bardoli Satyagraha against British tax policies in 1928, Chouhan drew parallels between past and present struggles for farmers' welfare.
"I feel fortunate to be on this Karmabhoomi of Sardar Vallabhbhai Patel. On this day, 12 June 1928, Sardar Vallabhbhai Patel had held a meeting for the Bardoli Satyagraha," he said.
The campaign, designed to implement Prime Minister Narendra Modi's 'Lab to Land' vision, deployed 2,170 teams comprising 16,000 scientists who travelled village to village across the country. These teams engaged directly with farmers, providing research-based information tailored to local climatic conditions and field requirements.
"Around 1 crore 12 lakh farmers have been communicated under this campaign and access has been ensured to more than 1 lakh villages," Chouhan said, highlighting the campaign's extensive reach.
Live Events
Dialogues were conducted at over 55,000 locations during the fortnight-long initiative.
The minister praised Gujarat's agricultural performance, noting the state's leadership in specific crops. Gujarat produces 77 per cent of the country's castor, 44.5 per cent of groundnut, 24 per cent of cotton, and 15 per cent of gram. The state also ranks first in castor, cumin, fennel, and dates production, an official statement said.
Chouhan outlined six key formulas for agricultural improvement: increasing production, reducing production costs, ensuring fair prices for farmers, providing proper compensation for losses, promoting agricultural diversification, and maintaining soil fertility for future generations.
The minister announced an ambitious target for natural farming across 7.5 lakh hectares this year, with 18 lakh farmers already expressing willingness to participate.
"Many farmers shared their experiences with me regarding natural farming. It was a pleasure to hear from the farmers that natural farming reduces costs and production is also not affected and quality products are obtained," he said.
The campaign, which began in Odisha on May 29, saw Chouhan visiting 13 states, including Odisha, Jammu, Uttar Pradesh, Haryana, Bihar, Maharashtra, Punjab, Uttarakhand, Madhya Pradesh, Karnataka, Telangana, Delhi, and Gujarat. Throughout the tour, he engaged with farmers through Kisan Chaupals, conferences, and padyatras.
Emphasising the campaign's impact beyond mere information dissemination, Chouhan noted encounters with farmers who had increased their income ten-fold through innovative practices and government schemes. "Such farmers are truly scientists, from whom we will also get guidance," he said, adding that these experiences would help in forming future agricultural policies.
Gujarat Chief Minister Bhupendrabhai Patel, state Agriculture Minister Raghavjibhai Patel, and other officials attended the concluding ceremony, while the 2,170 scientist teams participated virtually.
The minister also reaffirmed the government's commitment with the motto 'One Nation-One Agriculture-One Team', promising continuous dialogue and support for the farming community beyond the formal campaign period.
Economic Times WhatsApp channel
)
Hashtags

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


The Hindu
26 minutes ago
- The Hindu
Delhi Assembly Monsoon Session to run on 100% solar power in push for green energy
The Monsoon Session of the Delhi Assembly, beginning on Monday (August 4, 2025), will be powered entirely by renewable energy following the inauguration of a 500-kilowatt rooftop solar power plant by Union Minister of State for Law and Justice Arjun Ram Meghwal on Sunday (August 3, 2025). This milestone makes the Delhi Assembly the first in the country to operate solely on solar energy. Speaking at the inauguration of the solar plant and the new e-Vidhan initiative, which aims to make the Assembly paperless, Mr. Meghwal said, 'Delhi Assembly will be the first where sustainability, self-reliance, and digital empowerment go hand in hand. This fusion of climate responsibility and administrative reform must begin at the heart of democratic institutions.' Sustainable governance Delhi Assembly Speaker Vijender Gupta described the initiative as a model for how legislative institutions can champion environmental stewardship. Highlighting the historic significance of the Assembly building, constructed in 1912 and once home to the country's first Parliament, Mr. Gupta said it is 'an example of how tradition and progress can go together'. He said that the rooftop solar project is expected to yield savings of up to ₹15 lakh per month, or approximately ₹1.75 crore annually, with potential surplus electricity generation through net metering. 'The financial savings generated through solar energy will be reinvested in developmental work for the welfare of Delhi's people,' the Speaker said. The Monsoon Session's opening day will also see the tabling of two reports from the Comptroller and Auditor General of India: State Finances for the year 2023-24, and Welfare of Building and Other Construction Workers for the year ending March 2023. In a key development in education policy, Minister of Education Ashish Sood is set to introduce the Delhi School Education (Transparency in Fixation and Regulation of Fees) Bill, 2025, which aims to regulate fee hikes in private schools across the Capital. A trial run of the new e-Vidhan (paperless) system is scheduled for 11:00 a.m. on Monday, with the official sitting of the House at 2:00 p.m. to be conducted entirely on solar power, without using electricity from conventional sources.


Time of India
an hour ago
- Time of India
PM to open Metro line to IT corridor on Aug 10
Bengaluru: Missing the original deadline by two-and-a-half years, Bengaluru Metro Yellow Line — from RV Road in Jayanagar to tech hub on Hosur Road, offering a congestion-free commute for lakhs of tech workers — will be inaugurated by PM Modi on Aug 10. Tired of too many ads? go ad free now Commercial operations are likely from Aug 11. Union minister of housing and urban affairs Manohar Lal Khattar announced the launch date on X. On the same day, Modi will lay the foundation for Phase III of Namma Metro project, which proposes 45km lines at a cost of Rs 15,611 crore, the post added. Though infrastructure was ready for over two years for the 19km yellow line built by BMRCL at a cost of Rs 7,000 crore, the inauguration of this stretch, having missed revised deadlines multiple times, was further delayed due to shortage of coaches. BMRCL recently set Aug 15 as the revised target to open the line with just three trainsets. After receiving safety clearance from the Commissioner of Metro Railway Safety to open the new line connecting Electronics City, BMRCL approached the state govt. In 2023, ahead of the Karnataka assembly elections, Modi inaugurated the extended Purple Line from KR Pura to Whitefield. Later, three Namma Metro projects — two Purple Line stretches, the Green Line extension towards Tumakuru, and the Ragigudda–Silk Board double-decker flyover—were opened without fanfare. Although the Centre sanctioned Orange Line in 2024, the state govt's plan for a double-decker flyover delayed tendering. BMRCL is expected to float tenders by year-end. The agency is finalising the design plan, while environmental and social impact consultations are in progress, with reports likely to be published between Oct and Nov.


Time of India
an hour ago
- Time of India
‘Punjab has sent no proposal for solar parks under central scheme in last 5 yrs'
Bathinda: Even as 18 solar parks were developed in several states under the central scheme of 'development of solar parks and ultra-mega solar power projects', the Punjab govt did not send any proposal for the development of a solar park under the scheme in the last five years. Tired of too many ads? go ad free now This was revealed by Union minister of state for new and renewable energy and power, Shripad Yesso Naik, in a written reply in Lok Sabha on Wednesday in response to a question by Bathinda MP Harsimrat Kaur Badal. The development of solar parks and ultra-mega solar power projects aims to accelerate large-scale solar power generation by facilitating the development of solar parks and ultra-mega solar power projects. These parks provide a platform for developers to set up solar projects with shared infrastructure, including land, transmission lines, and other necessary facilities, reducing costs and speeding up project completion. The country in the past increased maximum renewable energy under solar energy to achieve its target of 450 GW renewable energy by 2030 as per its nationally determined contributions (NDC) under the Paris Agreement. After the scheme was launched in Dec 2014 to accelerate large-scale solar power generation and support the country's renewable energy goals, 50 solar parks with a total capacity of 37,990 MW were sanctioned across 12 states, while 18 with 10,856 MW were developed. As per the minister, 18 projects were developed in nine states with a capacity of 10,856 MW, with a maximum of four projects each in MP and Rajasthan. Under the project, central financial assistance (CFA) of Rs 3,661.93 crore was released to various states in the last five years under the 'development of solar parks and ultra-mega solar power projects', with a maximum of Rs 1,116.4 crore to Gujarat, even as only one solar park with 700 MW was developed there. Tired of too many ads? go ad free now Harsimrat Kaur asked for details of the number of solar parks set up under the 'development of solar parks and ultra mega power projects' in the country, including Punjab; the details of funds allocated and utilised by the different states under the said scheme since its inception; whether the Union govt received any application/financial assistance proposal for the development of a solar park from the state govt of Punjab under this scheme during the last five years; and the reasons behind the delay in the implementation of the said proposal, if any, in Punjab. MSID:: 122994674 413 |