
Early onset of rain leads to rise in viral hepatitis and typhoid cases reported in Pune city
2
3
Pune: The early onset of rain this year in the city has led to a spike in the number of viral hepatitis and typhoid cases in May, which is not usually a monsoon month.
Officials said there has been a reported rise in waterborne infections both in the Pune and Pimpri Chinchwad municipal corporations' limits.
As per the Pune Municipal Corporation (PMC), the city saw 14 viral hepatitis cases and 29 typhoid or enteric fever cases in May 2025 alone, which in the corresponding period in 2024 stood at six viral hepatitis cases and 16 typhoid cases.
PMC chief health officer Dr Nina Borade said, "The early onset of monsoon is bound to bring in more vector-borne and waterborne infections. The mosquito breeding cycle has changed; changed climate also often affects immunity.
However, this spike is not high. Also, PMC's water purification cycle is in place and effective. We recently tested our water samples, and they were found to be safe to drink."
Pimpri Chinchwad Municipal Corporation (PCMC) limits are also recording a slight rise in waterborne infections. PCMC chief medical officer Laxman Gophane said there has been a noticeable increase in typhoid and hepatitis cases in May this year compared to the same period last year — but he emphasized that the data is still being analysed in the context of past trends before concluding if it constitutes a significant surge.
"In May 2024, we recorded 58 typhoid cases, which have risen to 78 this year. Similarly, hepatitis cases have slightly increased from 13 last year to 15 this May," Gophane said. He added that health officials are closely monitoring the situation through the Integrated Disease Surveillance Programme (IDSP) portal and immediately alert the teams concerned if any sharp rise is observed.
"At present, the situation is under control, and civic hospitals are fully equipped to manage such cases," he said.
Doctors said there has been a reported rise in private hospitals as well. Dr Mukesh Budhwani, general physician and diabetologist, Apollo Clinic, Vimannagar, said, "Early monsoon causes sharp spike in viral hepatitis and typhoid cases in Pune city. We have witnessed several patients at the clinic reporting monsoon-related health issues. In the past two weeks alone, we have witnessed more than 50-60 patients of viral fever, infection, cough and cold, or serious illnesses like typhoid, gastrointestinal issues such as diarrhea and stomach infections.
This is a 20% rise in the number of cases that we usually observe around this time."
He added, "We recommend taking precautions like drinking purified water, using mosquito repellents, and maintaining good hygiene to prevent waterborne and mosquito-borne diseases. Boost immunity with vitamin C, probiotics, and antioxidants. Stay hydrated and active and stick to home-cooked meals to minimize health risks in the monsoon."
Dr Pramod Katre, gastroenterologist at Noble Hospital, said, "The onset of monsoon brings along waterborne diseases like hepatitis (A and E), typhoid and jaundice. This is because of contaminated water. Hepatitis is seen more in smaller children than adults due to contaminated water and food. In most, it is self-limiting and requires a medication course of one or two weeks. In some cases, it can get serious and affect the liver.
The common symptoms are stomach pain, nausea, vomiting and jaundice. It is important to consult a doctor if symptoms are seen as early detection can help in timely treatment and avoid complications later. There are vaccines available for hepatitis A and typhoid, which can be beneficial for children and adults."
Doctors also recommended some simple precautionary steps during early stages and for the monsoon season — carry your own water bottle, boil water, ensure hand hygiene before eating and avoid outside food.
Hashtags

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


Hindustan Times
3 hours ago
- Hindustan Times
PMC finally approves dog park in Kharadi
After more than two years of planning and two unsuccessful proposals, the Pune Municipal Corporation (PMC) has finally approved the development of a dedicated dog park on a 3-acre plot in Kharadi, bearing survey numbers 25 and 26. The decision was taken by the PMC's veterinary department last week. (REPRESENTATIVE PHOTO) The decision was taken by the PMC's veterinary department last week. The civic body has been working to set up a dog park in Pune since 2023. The previous plans to establish such parks in Katraj and Baner were proposed but later dropped due to administrative approval challenges. Dr Sarika Funde-Bhosale, chief veterinary officer, PMC, said a letter has been given to the road, water supply, electric and building construction departments to start work on the development of roads, water supply lines and electricity lines and build a compound wall. 'The park will be equipped with pet-friendly features such as fenced play areas, walking tracks, shaded zones, drinking water points, and waste disposal bins. Other facilities like a jogging track, swimming pool, parking facility, playing instruments, grooming parlour and veterinary services will be made available at the dog park. However, the facilities will be made available in a phased manner,' said Funde-Bhosale. PMC in June 2023 decided to set up the city's first pet dog park on a 3.5-acre plot on the Katraj-Kondhwa Road. A budget provision of ₹1 crore has been made for its construction. The plot originally belonged to the PMC-run Rajiv Gandhi Zoological Park (RGZP). The civic body had sought permission from CZA to use the land for a dog park. However, CZA on December 26, 2023, rejected the proposal, stating the Wildlife Protection Act, 1972, prohibits zoos from housing domestic animals and pets within premises. Similarly, the civic veterinary department in May 2024 identified a 36,000 square feet plot in Baner to set up a dog park. The proposal for the same was sent to the municipal commissioner of PMC. However, the plot was later allotted to another department of PMC.


Indian Express
13 hours ago
- Indian Express
Foundational learning has improved by over 20% in ‘balwadis' through ECCE strategy, claims PCMC
The Pimpri Chinchwad Municipal Corporation (PCMC) initiative to transform all 211 of its Balwadis (pre- primary schools) has led to more than 6,000 young children receiving stronger, safer, and much more engaging early education. In just three years, the initiative, driven by a focused Early Childhood Care and Education (ECCE) strategy, has delivered measurable improvements in foundational learning, with assessments showing a 20–24% jump in skills. 'Early childhood is the most critical stage of development, and our goal has been to give every child a strong and joyful start,' said PCMC Commissioner Shekhar Singh. 'By investing in our Balwadis, training our teachers, involving parents, and adopting play-based learning, we are laying the foundation for a more inclusive and better-educated Pimpri Chinchwad.' The programme began with a small working group of teachers, supervisors, and education professionals who redesigned the curriculum into activity-based modules. With regular monthly trainings, curated teaching materials, and strengthened teacher-student-parent relationships, the initiative scaled up rapidly. A cluster-based model with 16 master trainers and 9 supervisors now supports implementation across all Balwadis. 'With every cluster session, we're seeing greater alignment in curriculum delivery and pedagogy,' added Yamuna Khandagale, Assistant Coordinator, Pre-Primary Department. 'Teachers now plan their daily classes around each month's theme and ensure quality education reaches every child.'


Indian Express
14 hours ago
- Indian Express
‘Less than 10% of PMC's goal achieved': How cycle tracks fail cyclists in Pune city
In 2017, the Pune Municipal Corporation (PMC) came out with a Comprehensive Bicycle Plan with an aim to create a 824- km cycle network and to increase the modal share of cycling from 3 per cent to 25 per cent by 2031. However, according to ground research by NGO Parisar based on the PMC data, only 83 kilometers of tracks have been built till date, and many of them have faded away or are not operational anymore. PMC's plan envisioned 824 km of cycle network across the city with 531 km segregated cycle track, 154 km marked or painted cycle lanes, 75 km independent cycle ways/ greenways, 54 km or currently existing cycle tracks that are to be retrofitted, and 11 km of footpath and cycle track merged. Less than 10% of this goal has been achieved, observed Parisar. Tanzeel Allapur, Project Lead-Sustainable Mobility at Parisar, said, 'The plan is very good. If some other city wants to do it, they should look at the Pune bicycle plan. But in implementation it has absolutely not met the goal that it set out to do. We have nowhere reached track length or increase in modal share envisioned. The cycling department at PMC was merged with the road department, so there is no dedicated authority to look after it as well.' Ranajit Gadgil, avid cyclist and programme director at Parisar, said that comprehensive coverage of cycling tracks is really lacking in the city as some officials did not follow through on the Comprehensive Bicycle Plan. 'Cycle tracks need to be in really good condition and designed exceedingly well for cyclists to be able to use them. If there are problems with that cycle track—continuity, lack of ham, obstacles, host of other things—cyclists will just not use them. They will just start using the carriageway,' he explained. On roads like Fergusson College Road and Jungli Maharaj Road, where cycling paths exist along with the footpaths, better marking and distinction could help pedestrians keep off the paths, said Gadgil. 'If there are enough cyclists using that cycle track, then pedestrians sort of know that people are cycling on this. It is a chicken-and-egg problem,' Gadgil added. Kiran Wargale, a Pune-based cycling enthusiast, flagged safety concerns for cyclists in the city. 'Most roads in the city are extremely unsafe for cycling. It's unfortunate, especially for a city that was once known for its vibrant cycling culture. Apart from a few exceptions like Aundh Road, Pashan–NDA Road, and some stretches in Pimpri-Chinchwad, the overall infrastructure is in a very bad state,' he said. 'Poorly maintained cycle tracks, damaged roads where no tracks exist, and the constant threat from unruly traffic, especially heavy vehicles pose serious risks. As a result, many cyclists are forced to ride on the city's outskirts, but even reaching those areas on a cycle involves significant danger,' he added. Another cyclist Ashwin said, 'There's no real thought given to integrating cycling into the city's transport planning. Cycle lanes, where they exist, are mostly encroached and abruptly end. It feels like cyclists are invisible in the bigger mobility picture. Instead of being encouraged as a sustainable and healthy mode of transport, cycling is treated as an afterthought. Non-existent cycling infrastructure is a sign that the city is moving in the opposite direction of sustainable development.' Rahul Nene, founder of cycling group Speaking Wheels, however has a different view. He said that the focus should be on increasing awareness about cycling rather than focusing on building cycling tracks. 'Rented cycles with proper safety mechanisms need to be reintroduced so that more people are out on the roads and driving. Currently there is not enough demand for cycling tracks, they are empty when I drive on them. Only once there is more awareness and the demand is created, we can think of building cycling tracks,' he opines. (With inputs from Sushant Kulkarni) Soham is a Correspondent with the Indian Express in Pune. A journalism graduate, he was a fact-checker before joining the Express. Soham currently covers education and is also interested in civic issues, health, human rights, and politics. ... Read More