
Five pineapple waste processing centres in the pipeline
JOHOR BARU: The Malaysian Pineapple Industry Board (LPNM) is formulating a comprehensive plan to strengthen the country's pineapple waste industry, says its director-general Mohd Khairuzamri M. Salleh.
He said the plan includes the proposed setting up of five Pineapple Waste Processing Centres (PPSN) and 50 waste collection kiosks nationwide.
The initiative will be funded under the 13th Malaysia Plan (13MP), he added.
Mohd Khairuzamri said the five centres are expected to be built in the east coast, southern, northern, central and Sarawak zones, to turn farm waste into a new source of income for farmers while supporting the nation's environmental sustainability goals.
'The PPSNs will collect and process pineapple waste such as leaves and stems into value-added products such as animal feed, planting media, paper pulp and composite materials,' he told Bernama at the Malaysian Pineapple Day 2025 celebration held here yesterday.
He said the first pilot PPSN project began operations in Rompin, Pahang last year.
It is equipped with modern machinery, including harvesters, crushers, extruders and dryers, with a capacity to process between one and three tonnes of waste daily.
On the waste collection kiosks, Mohd Khairuzamri said they will be set up at the community and smallholder levels to facilitate the sale of pineapple waste to nearby PPSNs.
'These kiosks will streamline logistics and centralised waste collection, thereby accelerating the value chain process in the pineapple waste industry,' he said.
Hashtags

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


Borneo Post
24 minutes ago
- Borneo Post
Sarawak eyes 1,500MW solar energy production by 2030
File photo for illustration purposes SIBU (July 1): Sarawak aims to achieve a solar energy production capacity of 1,500 megawatts (MW) by 2030, said Minister of Utility and Telecommunications Dato Sri Julaihi Narawi. He disclosed that the Murum and Bakun dams have been identified as potential sites for future floating solar projects, and added that several keen investors had also been identified. 'The floating solar project at the Batang Ai Dam, with a 50MW capacity, has been operational since December 2024. 'The success of this project has opened up opportunities for the development of other Large Scale Solar (LSS) projects, including floating solar at the Batang Ai, Bakun and Murum dams,' he said. He said this when met by reporters after a ceremony to hand over the accreditation certificate to University of Technology Sarawak (UTS) as the certified Training and Examination Centre for Solar Photovoltaic System Design, here yesterday. In this regard, Julaihi said active participation from the private sector and the public is strongly encouraged to ensure that this target is achieved, thereby strengthening collective efforts toward a clean, safe, and competitive energy future. Additionally, he said the Sarawak government is targeting an electricity generation capacity of 10,000MW by 2030. 'As of now, the total energy we are generating stands at 5,898MW compared to the current demand of 4,897MW.' In his speech earlier, he mentioned that with a generation mix consisting of at least 60 per cent from renewable energy sources like hydro, solar, and biomass, this goal is part of the efforts to achieve Sarawak's aspiration of becoming the 'Battery of Asean'. Julaihi also shared about the Additional and Late Applicant Fund (Alaf) projects under the 12th Malaysia Plan, where the Sarawak government had set aside RM315 million for its implementation. He said from Phase 1 to Phase 4, which is still ongoing, Alaf has benefitted over 21,000 households. 'The Sarawak government has approved RM550 million under the 13th Malaysia Plan to continue implementing Alaf projects, which are expected to benefit over 30,000 rural households,' he added. He also touched on how the amendment to the Electricity Ordinance 2023 has appointed Sarawak Energy as the Single Buyer. 'This amendment aims to facilitate the development and private sector investment in energy generation through renewable sources such as LSS, including floating solar at the Batang Ai Dam.' floating solar project julaihi narawi lead solar energy


Malaysian Reserve
14 hours ago
- Malaysian Reserve
PM Anwar: ECERDC records RM6.4b realised investments in 1H2025
KUALA LUMPUR — The East Coast Economic Region Development Council (ECERDC) has successfully recorded RM6.4 billion in realised investments in the first six months of this year, said Prime Minister Datuk Seri Anwar Ibrahim. Anwar, who is also the Finance Minister, said the ECERDC has also successfully created more than 2,800 jobs to date. 'At the same time, the amount of committed investments has reached RM10.4 billion, surpassing the RM10 billion target set for 2025,' he said in a post on his official Facebook page today. Earlier on, Anwar attended a meeting with the ECERDC to review the latest progress on key performance indicators for the economic corridor, and to discuss the development framework for East Coast Economic Region (ECER) under the upcoming 13th Malaysia Plan, which is currently being formulated by the government. The Prime Minister said the government's strategic plans, especially through the ECER Development Plan, among others, will see eight strategic and high-impact projects scheduled for completion this year. 'I emphasised the importance of prioritising the country's long-term interests in attracting investors, including the importance of ensuring a percentage of technology and skills transfer elements in every approved investment. 'The ECERDC needs to maintain this momentum through an efficient and proactive facilitation process which will strengthen the East Coast Region as a competitive investment destination both nationally and internationally,' he added. In a separate statement, the ECERDC said the manufacturing sector accounted for 59 per cent of the RM6.4 billion realised investments. The council said Pahang led the list with realised investments totalling RM4 billion, followed by Terengganu (RM1.3 billion) and Kelantan (RM1.1 billion), while Johor saw RM13.3 million of investments in agriculture from the development of a biocompost facility in Mersing. 'Key realised investments also include a RM1 billion integrated oil refinery plant, a RM950 million tourism development, and a RM667 million facility to produce Maleic Anhydride in Pahang. 'In Kelantan, a RM1 billion 84-megawatt mini hydroelectric plant is being developed, while Terengganu secured a RM638 million investment for the processing of pulverised quartz,' it added. — BERNAMA


New Straits Times
17 hours ago
- New Straits Times
Priorities for the 13th Malaysia Plan
LETTERS: THE Alliance for a Safe Community welcomes the scheduled tabling of the 13th Malaysia Plan (13MP) in Parliament on July 28. As Malaysia charts its course for the next five years, the 13MP must be bold, inclusive, and future-focused to address current challenges and prepare the nation for long-term resilience and sustainability. We urge the government to give serious consideration to the following critical areas for inclusion in the final Plan: 1. Social Protection and Healthcare Reform The plan must strengthen social safety nets, especially for the B40 and vulnerable communities. With an ageing population and rising chronic diseases, Malaysia needs comprehensive healthcare reforms, including mental health services, primary care strengthening, and greater support for caregivers and persons with disabilities. 2. Education and Human Capital Development A strong emphasis must be placed on quality education, digital literacy, STEM development, and upskilling. Teachers must be empowered, and school infrastructure upgraded. Equal access to education in rural and underserved areas is essential to reduce inequality and ensure intergenerational mobility. 3. Climate Change and Environmental Sustainability Climate resilience must be mainstreamed across all sectors. The 13MP should include strong climate action commitments, sustainable urban planning, improved waste management, water security strategies, and reforestation programmes to address environmental degradation. 4. Economic Restructuring and Innovation A sustainable, high-value economy must be prioritised — moving away from low-skilled, low-wage models. The Plan should foster innovation, support MSMEs, increase automation, and attract green and digital investments. Regional development must also be equitable to avoid economic disparity. 5. Housing and Urban Liveability Affordable, safe, and accessible housing must be a priority. Urban renewal initiatives must be fair and inclusive, benefiting all stakeholders. Public transportation, pedestrian safety, and community infrastructure need urgent upgrades to enhance quality of life. 6. Good Governance and Institutional Reform The 13MP should incorporate stronger mechanisms for good governance, transparency, and accountability in public service. Strengthening integrity units, enhancing public participation in policymaking, and reducing bureaucracy are key to restoring public trust. 7. Public Safety and Crime Prevention A safe and secure environment is a prerequisite for national progress. Investments in community policing, cybercrime prevention, and drug abuse rehabilitation, especially among youth, must be scaled up. 8. Digital Transformation and Bridging the Digital Divide Digital inclusion should be made a national priority. Broadband access, particularly in rural areas, must be improved. The 13MP must also support digital safety education to prepare citizens for the evolving digital landscape. As we look ahead, the 13MP represents a timely opportunity for Malaysia to rebuild better — socially, economically, and environmentally. It must not only address current gaps but also anticipate future trends. We call on all stakeholders, including civil society, to participate actively in the shaping and monitoring of the plan's outcomes. Only through a whole-of-nation approach can we achieve a more equitable, secure, and resilient Malaysia.