Latest news with #AliAminKhanGandapur


Express Tribune
a day ago
- Business
- Express Tribune
K-P launches paperless e-summary system
In a landmark step toward digital governance, the Khyber-Pakhtunkhwa government has formally launched an e-summary system to replace traditional paper-based approvals. Chief Minister Ali Amin Khan Gandapur signed the province's first official e-summary through an online platform, marking a major milestone in efforts to modernize administrative processes. The initiative, aimed at making government operations paperless, is part of a broader digital transformation plan. Speaking at the launch, Chief Minister Gandapur highlighted the system's potential to enhance efficiency, save time and resources, and bring transparency to official matters. "This initiative will not only curb bureaucratic delays but also significantly improve departmental performance," he stated. He added that the government is now moving toward digitizing note parts, official letters, notifications, and cabinet documents. The chief minister reaffirmed his government's commitment to expanding digital services across both administrative and public service sectors, in line with the Digital Governance Roadmap. "We are working to transform K-P into a truly digital province, in accordance with the vision of Imran Khan," he emphasized. Several public services have already been digitized as part of this ongoing transformation.


Business Recorder
6 days ago
- Health
- Business Recorder
KP CM inaugurates state-of-the-art food testing laboratory
PESHAWAR: Chief Minister Khyber Pakhtunkhwa Ali Amin Khan Gandapur on Wednesday inaugurated the province's first state-of-the-art 'Provincial Food Testing Laboratory and Centre for Research' in Hayatabad, Peshawar. Established at a cost of Rs 905 million, the facility is the first of its kind static food testing laboratory in the province, equipped with advanced machinery and modern testing capabilities. Officials stated that the laboratory will provide scientific analysis of food quality and detect adulteration using cutting-edge equipment. The lab encompasses specialized sections in food microbiology, food chemistry and nutritional analysis, pesticide residue detection, and mycotoxin analysis. It also includes capabilities for heavy metal analysis, dairy, meat, and edible oil testing, as well as sensory evaluation. Designed under one roof, the facility comprises eight dedicated sub-laboratories and is integrated with an online reporting system and a modern Management Information System (MIS). The lab has the capacity to test nearly 1,500 parameters across more than 100 food items and meets international ISO standards. It can detect harmful chemicals like aflatoxins and formalin, and microbial contaminants including salmonella, listeria, E. coli, and mold. Additionally, it allows testing for heavy metals in water and beverages, and performs comprehensive nutritional profiling including fat, protein, moisture, ash content, and calorific value. Speaking to the media on the occasion, the Chief Minister said the facility aligns with the vision of Imran Khan, under which the provincial government is committed to delivering quality public services and improving public health. He added that the lab is capable of identifying antibiotic residues in dairy and meat products and offers halal certification services. This includes verification of halal meat and detection of harmful or prohibited animal sources. Over 20 Food Authority offices across the province will serve as sample collection points, while a digital traceability system will allow easier public access and transparency. The Chief Minister lauded the timely completion of the project and directed authorities to ensure that the lab's systems are regularly updated and aligned with emerging technological trends. He stressed that food adulteration is a serious crime and those involved are enemies of public health, warning that no leniency will be shown in this regard. The Chief Minister said that only food items approved by this laboratory would be allowed for sale in the market, adding that other departments and government agencies would also benefit from the facility's services. Reiterating his government's commitment, he said the Khyber Pakhtunkhwa government is determined to ensure the availability of safe and healthy food to its citizens and will make no compromises on public health. He termed the establishment of the modern food testing laboratory and research centre a landmark development that will significantly enhance the province's food safety regime. Copyright Business Recorder, 2025


Express Tribune
22-07-2025
- Business
- Express Tribune
K-P set to release Rs8b for Ehsaas initiatives
Khyber-Pakhtunkhwa Chief Minister Ali Amin Khan Gandapur announced the government will release Rs8 billion for the Ehsaas initiatives in the current fiscal year, with Rs2 billion earmarked for interest-free loans under each of four flagship programs. A high-level meeting regarding Ehsas flagship projects in the province was held here at Chief Minister's Secretariat with Khyber-Pakhtunkhwa CM Ali Amin Khan Gandapur in the chair. The meeting reviewed the progress on four major programmes being implemented under Ehsas initiative in the province. These programmes include Ehsaas Nojawan, Ehsaas Hunar, Ehsaas Rozgar, and Ehsaas Apna Ghar (Low cost housing project). During the meeting, a detailed briefing was given on the progress, so far made of the programs. It was informed that under Component-I of the Ehsaas Nojawan Program, being implemented through the Bank of Khyber, Rs408 million in interest-free loans have been distributed among 139 beneficiaries, utilizing 100% of the allocated funds. An additional Rs116 million is required for 52 more approved cases under the same component. Meanwhile, Component-II of the Ehsaas Nojawan Program, implemented through Akhuwat Microfinance, has also achieved 100% disbursement of its allocated funds. So far, Rs602 million in interest-free loans have been disbursed among 3585 beneficiaries, with another 1,745 applications currently under process. It was also highlighted that Akhuwat has achieved a 100% loan recovery rate under this program, with Rs. 42.88 million recovered to date. Under the Ehsaas Hunar Program, Rs307 million have been distributed among 647 beneficiaries, while an additional 592 cases are currently being processed.


Business Recorder
21-07-2025
- Business
- Business Recorder
KP unveils first-ever Forest Carbon Credit Mapping Report
PESHAWAR: The Government of Khyber Pakhtunkhwa unveiled the province's first-ever Forest Carbon Credit Mapping Report. The report, developed with the support of the SEED programme, identifies ten potential forest-based carbon credit projects across 2.2 million hectares of land in the province. Collectively, these projects have the potential to sequester over 400 million tons of carbon, with an estimated revenue generation of four billion dollars and the creation of 50,000 green jobs. Speaking at the occasion, Chief Minister Ali Amin Khan Gandapur termed the launch of the Forest Carbon Credit Mapping as historic milestone for the forestry sector in the province. He extended appreciations to the Forest Department and partner institutions for this remarkable achievement. He emphasized that the mapping initiative lays the foundation for the province's participation in international carbon credit markets and opens new avenues for accessing innovative green financial resources. The Chief Minister noted that this mapping effort represents a comprehensive model for environmental, economic, and social development in the province. He further stated that Khyber Pakhtunkhwa province has been blessed with natural resources, and forests are one of its most vital assets, now recognized globally as an industry. He said, unfortunately serious efforts were not made in the past to harness these invaluable resources. However, during the previous years under the PTI government, significant progress has been made in the forestry sector, as per the vision of the party's patron in chief, Imran Khan. The Chief Minister noted that the global community has acknowledged and appreciated the achievements made under Imran Khan's vision for forest development and environmental sustainability. Highlighting the province's existing forest potential, the Chief Minister shared that there has been a six percent increase in forest cover over the last decade. Currently, forests in Khyber Pakhtunkhwa account for 46 percent of the country's total forest area and have the capacity to sequester 50 percent of the national carbon stock. He added that the province is projected to earn up to 100 million dollars annually through carbon credits. The government is committed to utilizing the province's forestry resources for economic stability and the well-being of its people. Serious steps are being taken to fully capitalize on the province's carbon credit potential. Ali Amin Khan Gandapur also mentioned that the provincial government is actively working to increase its carbon credit stock by reducing industrial and environmental pollution. There are vast opportunities to further expand forest areas across the province, and the government is making continuous efforts toward this goal. He emphasized that government's efforts alone cannot yield desired results without active public participation. He called upon the citizens to play their part in promoting and protecting forests. Appealing to the public, the Chief Minister urged people to plant as many trees as possible, especially on unused lands and around their homes. He concluded by saying that with collective efforts, the dream of a 'Green Khyber Pakhtunkhwa' can become a reality. Copyright Business Recorder, 2025


Business Recorder
19-07-2025
- Politics
- Business Recorder
Sustainable peace solution in terrorism-prone areas: KP govt to take political parties into confidence, formulate strategy
PESHAWAR: The 35th meeting of the Khyber Pakhtunkhwa Cabinet was held here on Friday, with Chief Minister Ali Amin Khan Gandapur in the chair. Cabinet members, Additional Chief Secretaries, the Senior Member Board of Revenue, Administrative Secretaries, and the Advocate General of Khyber Pakhtunkhwa attended the meeting. Barrister Dr Muhammad Ali Saif, Advisor to the Chief Minister on Information & Public Relations, while explaining the details of the decisions taken in the Cabinet meeting, said that Chief Minister Ali Amin Khan Gandapur announced that an All Parties Conference would be convened next week to take all political parties into confidence and formulate a joint strategy for a sustainable peace solution in terrorism-prone areas. The Chief Minister stated that the restoration of peace in District Kurram is the result of the government's sincere efforts and that peace in other areas can also be achieved through consultations with local jirgas and tribal elders, Barrister Dr Saif said. The Advisor further informed that the meeting also discussed proposed reforms to 3MPO (Maintenance of Public Order) law. It was decided that the implementation of this law would be subject to prior approval from the Home Department to prevent its misuse. The Chief Minister remarked that the 3MPO is a law similar to the Frontier Crimes Regulation (FCR), which is often misused. Speaking on incidents of natural disasters across the country, the Chief Minister emphasized that such tragedies should not be politicized and reaffirmed that the Khyber Pakhtunkhwa government is always ready to assist other provinces in times of need, he added. Barrister Dr Saif said that the Cabinet approved financial assistance of Rs5 million each for the families of martyrs from Khyber Pakhtunkhwa who lost their lives due to Indian aggression. Additionally Rs10 million in compensation was approved for the family of Maulana Khanzeb Shaheed, who was martyred in a terrorist attack. Explaining other important decisions of the Cabinet meeting, he said that the Cabinet approved the Khyber Pakhtunkhwa Agriculture Income Tax Rules, 2025, the Khyber Pakhtunkhwa Environmental Audit Rules, 2025, and the Khyber Pakhtunkhwa Environmental Protection (Sealing or Seizing) Rules, 2025. The Cabinet formed a cabinet committee on the agenda item related to the removal of the death penalty provision from the Khyber Pakhtunkhwa Control of Narcotic Substances Act, 2019. The Cabinet Committee will submit its recommendations to the Cabinet. The Cabinet approved financial assistance totaling Rs48.1 million for four individuals - Rozina, Anas Khan, Muhammad Aman, and Muhammad Azlan - to help cover the cost of high-expense treatments for acute medical conditions that were otherwise beyond their financial means. The Cabinet approved the handing over of Dir Model School Dodba for the establishment of a campus of Khyber Medical University's Institute of Health Sciences in District Dir Upper, so that the current academic session could begin at the building. The Cabinet also approved land acquisition, at a total cost of Rs38.69 million, through private negotiations for the supply of Swat River surface water to Mingora via gravity flow. The Cabinet approved a cost enhancement from Rs318.501 million to Rs375.210 million for the project titled Strengthening Health Management Information System / District Health Information System in Khyber Pakhtunkhwa (Phase-II). It also approved a series of important administrative measures, including the appointment of members to the Board of Governors of the Paraplegic Center, and the posting and transfer of the Managing Director of the Health Foundation. Furthermore, the Cabinet approved the appointment of five members to the Khyber Pakhtunkhwa Child Protection and Welfare Commission. Under the Provincial Action Plan, the Cabinet approved the installation of RFID systems and machine-readable number plates on already-profiled NCP vehicles in the province. The Cabinet also decided to limit the measure strictly to profiling of NCP vehicles, with no tax collection involved, he explained. He said that requests for relaxation of the ban and procurement of vehicles for various departments were placed before the Cabinet. It was decided that, on a case-to-case basis, the required vehicles would be arranged through the Excise Department. Copyright Business Recorder, 2025