logo
South Africa: MTN Group nets $30mln from sale of 1.5bn shares in Ugandan subsidiary

South Africa: MTN Group nets $30mln from sale of 1.5bn shares in Ugandan subsidiary

Zawya21-04-2025
South Africa's MTN Group Ltd made a net gain of R564 million ($29.76 million) from the sale of its 1.57 billion shares in the Ugandan subsidiary despite offering the stake at a substantial discount in a bid to comply with a requirement to offload a minimum stake of 20 percent to minority investors.
Latest disclosures through the company's audited financial statements (2024) show that the proceeds generated from the sale of the shares (net of taxes and transaction costs) amounted to R1.03 billion ($54.67 million) resulting in a net gain of R564 million ($29.76 million).'Proceeds generated from the sale of shares, (net of taxes and transaction costs) amounted to Ush214 billion (R1 036 million). This resulted in a net gain of R564 million recognised in equity as a transaction with non-controlling interests,' the group says.
The group disposed of 7.03 percent stake equivalent to 1. 57 billion shares in MTN Uganda as part of its localisation plan that reduced its shareholding in the subsidiary to 76.02 percent from 83.05 percent.
The transaction which was completed in June last year (2024) came after the group managed to sell a 12.97 percent stake in MTN Uganda in November 2021 through an initial public offering (IPO) that was priced at Ush200 ($0.05).
The share sale in the secondary market aimed to help MTN comply with Uganda's local ownership rule that requires foreign telcos operating in the country to cede at least 20 percent shareholding to the public through the stock market.
The offer which ran between May and June 10, 2024, was priced at discount of Ush170 ($0.04) per share compared to the original IPO price of Ush200 ($0.05) per share.
The company also offered 30 free shares for every 140 shares allocated with the incentive shares amounting to a significant discount and making the secondary offer more generous than the IPO.
Consequently, the sale of the additional shares was oversubscribed by 2.3 times, receiving subscription of three billion shares, reflecting the impact of the incentives that included free shares.
In 2019 the Ugandan government directed foreign-owned telecoms operating in the country to list at least 20 percent of their shares on the local bourse within two years to boost Ugandan ownership in the sectorThe policy shift put pressure on multinationals operating in the country such as MTN, Airtel and Lycamobile to sell shares to the public.
President Yoweri Museveni complained that the country was draining its scarce foreign exchange reserves through foreign-owned telecoms repatriating their profits abroad.
Last year Airtel Africa Plc disclosed that it will also sell additional shares amounting to a 9.11 percent stake in its Ugandan subsidiary through a secondary offer to comply with Kampala's listing requirements.
The multinational in November 2023 managed to sell 4.35 billion shares equivalent to a 10.89 percent stake in Airtel Uganda's initial public offering (IPO) and failed to meet the ownership rule.
Airtel Africa said it had received a regulatory extension to sell the balance of 3.64 billion shares by November 2026, a move that will see it replicate MTN group which successfully offloaded a 20 percent stake in MTN Uganda in two transactions including a secondary offer conclude in June 2024Airtel Africa sold its shares at a price of Ush100 ($0.02) per share in the IPO that also offered incentive shares on a band subscription volume to attract investors.
Retail investors who applied for more than 2,500 shares, for instance, received 10 free shares for each 100 shares allocated while institutional investors who applied for at least 1.85 billion shares were offered 112 free shares for each 100 shares allocated.
MTN group's operations in the continent have faced several challenges including the conflict in Sudan's capital Khartoum which started on April 15, 2023, between Sudanese Armed Forces and the Rapid Support Forces leading to the destruction of state-owned infrastructure in the city.
The ongoing conflict in Khartoum has resulted in loss of revenue and earnings for MTN's subsidiary due to prolonged hyperinflationary environment leading to an impairment of R11. 72 billion ($618.66 million) relating to MTN Sudan's non-current assets.'Accordingly, the future economic benefits that can be derived from MTN Sudan's operations have declined,' the group says.
Last year (2024) the group gained R1.3 billion ($68.61 million) from the sale of subsidiaries in Afghanistan and Guinea-Bissau and a loss of R1.9 billion ($100.27 million) on the sale of a subsidiary in Guinea-Conakry.
The sale of MTN Guinea-Bissau and MTN Guinea-Conakry was concluded on August 1, 2024, and December 30, 2024, respectivelyThe group also disposed of 686 million shares in MTN Ghana to Ghanaian citizens as part of the Group's localisation strategy reducing the group's shareholding to 73.99 percent from 81.04 percent.
© Copyright 2022 Nation Media Group. All Rights Reserved. Provided by SyndiGate Media Inc. (Syndigate.info).
James Anyanzwa
Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

Uganda: The end of the runway? Kabalega airport fabled finish line
Uganda: The end of the runway? Kabalega airport fabled finish line

Zawya

time27-06-2025

  • Zawya

Uganda: The end of the runway? Kabalega airport fabled finish line

Uganda's Kabalega International Airport (KIA) has featured in several budget and State of the Nation addresses, but it has remained at 95 percent completion, and the government now says that the facility will begin operations within the next financial year. While presenting the budget for the 2025/26 financial year, Finance Minister Matia Kasaija reported that the 'operationalisation of Kabalega International Airport' is one of the 'priority interventions' but did not provide more details. Mr Kasaija echoed President Yoweri Museveni's statement during the State of the Nation Address on June 5 that the airport is near completion, as part of the requisite infrastructure that the Ugandan government has invested in to support commercial oil production. But the project has been stuck 'at 95 percent completion' for over two years, lacking an air traffic control tower and other infrastructure, partly due to modifications in the design for a mobile air traffic control tower, which was dropped midway. The switch to a fixed tower required a redesign of this aspect, which sent the project contractor back to the drawing board, causing delays, according to Amos Muriisa, the contractor's spokesperson. In the next financial year, the government has allocated Ush6.92 trillion ($1.91 billion) for integrated transport infrastructure, namely roads, bridges, railways, water transport, and air transport, to undertake interventions that include completion of the airport. Two years ago, the contractor, SBC Uganda Ltd, a joint venture of Israeli-British firms, Shikun and Binui International-SBI, and Colas Ltd, sought to avoid delays and proposed handing over the project to the government, with a plan for the airport's air traffic control to be handled by Entebbe International Airport. Construction of Uganda's second international airport began in April 2018 and was expected to be completed in 48 months as part of the support infrastructure for oil and gas in the Lake Albert region. Its completion was planned to coincide with the surge in oil and gas logistics, as oil companies were preparing to ship in heavy equipment ahead of launching field development works at the upstream oil and gas projects Tilenga and Kingfisher, as well as midstream operations of the East African Crude Oil Pipeline (Eacop). But, as the airport fell behind the timelines, the oil majors shipped all equipment, including four drilling rigs and pipes, by road from Mombasa to the drilling sites in the Albertine Graben. China National Offshore Oil Corporation launched well spudding at its Kingfisher oilfield on January 24, 2023, while TotalEnergies began drilling six months later at two of the three drilling sites of the Tilenga project. Funded to the tune of €264 million ($309 million) through loans from the UK Export Finance and Standard Chartered Bank, officials also blame the airport's slow progress on funding shortfalls, as the government delayed disbursing additional funds for the project. Mr Muriisa said that Covid-19 restrictions disrupted the pace of construction, as the contractor was compelled to halve the workforce, per Ministry of Health directives. The airport was intended to support Uganda's oil and gas upstream and midstream operations by facilitating the transportation of heavy equipment to the oil-rich Lake Albert region, but it is now far behind the oilfield developments it was expected to service. Industry executives argue that Kabalega remains a critical project for the sector. The airport has a 3.5km runway, 45-metre shoulders, a cargo terminal, and an apron that can hold four large Antonov-sized aircraft simultaneously, but the critical air traffic control tower remains the missing link. Other infrastructure to support commercial oil production includes 700 kilometres of tarmac roads that have been constructed in the Albertine region, and the export pipeline, currently at 58 percent. © Copyright 2022 Nation Media Group. All Rights Reserved. Provided by SyndiGate Media Inc. (

Uganda's Coffee Export Surge Delivers Record-Breaking Earnings in May
Uganda's Coffee Export Surge Delivers Record-Breaking Earnings in May

Arabian Post

time23-06-2025

  • Arabian Post

Uganda's Coffee Export Surge Delivers Record-Breaking Earnings in May

Uganda achieved a significant leap in coffee export earnings and volumes during May, driven by a strong harvest in key growing regions and sustained high global prices. The May coffee shipments reached 793,445 bags of 60 kg—an increase of 44% year‑on‑year—while export earnings soared to US$243.95 million, marking a 92% rise compared to May 2024. The Ministry of Agriculture, Animal Industry and Fisheries attributes the performance to robust output from the main harvest in Masaka and the southwestern districts, coupled with supportive international market conditions. Robusta, which accounted for around 87% of the total volume, reached 691,176 bags, valued at US$203.5 million. Arabica exports of 102,269 bags generated US$40.45 million—reflecting a near 110% surge in value year‑on‑year. Despite a slight dip in global prices in May due to improved output from Brazil, Uganda managed to sustain earnings growth through volume expansion. May's average export price stood at US$5.12 per kilogram, just marginally below April's US$5.15, but significantly higher than May 2024's US$3.83. ADVERTISEMENT Over the past 12 months—from June 2024 to May 2025—Ugandan coffee exports totalled 7.43 million bags, generating an impressive US$2.09 billion. This performance represented increases of 22% in volume and 94% in value relative to the previous year. The government has pursued a proactive strategy to bolster production. A 15‑year agroindustrialisation plan unveiled in the State‑of‑the‑Nation address emphasises high‑yield seedlings, post‑harvest improvements, irrigation expansion and credit support for commercial farmers. These measures, coupled with the integration of UCDA's functions into the Ministry of Agriculture, underpin the structural push to upscale the sector. Uganda remains one of Africa's leading coffee exporters, trailing Ethiopia, and coffee accounts for nearly 20% of its export revenue. In the May crop, European countries continued to dominate the demand landscape—with Italy, Germany and Spain among the main markets—though exports to Sudan, Algeria and other African destinations also showed clear growth. This rise in coffee export receipts has contributed to macro‑economic resilience. April data showed Uganda's merchandised export earnings rose to US$1.11 billion, with coffee alone contributing over US$214 million—a jump of 153% compared with April 2024. That month, the trade deficit narrowed sharply, falling from US$303 million to US$127 million. According to the USDA's FAS Nairobi report, production is projected to grow modestly through the 2025/26 marketing year, with estimates of green‐bean output for 2024/25 at 6.7 million bags and anticipated growth to 6.88 million bags in 2025/26, supported by good weather and improved crop management. One of the sector's evolving trends is the rise of women-led initiatives. In Sironko district, the Bayaaya Specialty Coffee cooperative has expanded membership to over 600 women—about 75% of participants—by offering incentives for female growers and aiming to rebalance gender dynamics in the value chain. The group's structure promotes shared decision‑making, enabling women to invest in household expenses and gain autonomy. Given the sustained global demand, strong yield improvements, supportive government policies and growing diversification among exporters and producers, Uganda appears poised to further strengthen its coffee sector contributions. The country has ambitions to scale annual coffee export value from the current US$2 billion towards a target range of US$4 billion. Continued monitoring will be needed around price volatility, global supply dynamics, and compliance with sustainability regulations, particularly in European markets.

Uganda SGR plan on track as Kenya pursues China bond
Uganda SGR plan on track as Kenya pursues China bond

Zawya

time23-06-2025

  • Zawya

Uganda SGR plan on track as Kenya pursues China bond

The Ugandan government has earmarked Ush2.17 trillion ($560.2 million) in the next financial year for construction of the standard gauge railway, signalling that the long-awaited works on the Malaba-Kampala line are about to start. This financing comes from the Islamic Development Bank (IsDB), with the government providing Ush79.03 billion ($21.9 million). With a 19.4 percent the financing of the Malaba-Kampala stretch secured, construction is set to begin after a decade of waiting, on one of the Northern Corridor Integration Projects (NCIP), which aims to enhance regional trade and connectivity.'In November 2024, President Yoweri Museveni launched construction of the 272-kilometre standard gauge railway (SGR) from Malaba to Kampala. The SGR is a strategic investment for our country. It will cut cargo transport cost by half from the current 120 per tonne and reduce transit time from Mombasa to Kampala from seven days to one day, turning Uganda into a land-linked country as opposed to being landlocked,' said Finance minister Matia Kasaija in his budget speech on June 12. Uganda's SGR has faced delays largely due to funding headaches, after many potential financiers withdrew from bankrolling the project, until Kampala recently negotiated for $800 million in funding from the IsDB. The financing agreement was reached on May 20, 2025, during the IsDB's 50th Annual Meetings in Algiers, the three-year agreement forming part of Uganda's Country Engagement Framework (CEF) for 2025–2027. Construction players say an NTP is a formal authorisation issued by a project owner, giving a contractor the green light to begin work on a project. The NTP is a critical milestone, ensuring that all necessary contractual, financial, and regulatory requirements are in place before any site activities kick off. The NTP's current funding helps the start of civil works as the remaining parties seek to conclude the syndicated loan deal with multiple lenders, including UK Export Finance, Turkish Exim Bank, and China Exim Bank. The total land acquisition estimate from Malaba to Kampala currently stands at Ush620.87 billion ($172 million) covering about l35 kilometres out of the 232 kilometres mainline right of way, which is about 58 percent. Land compensation has been done from Malaba to Buikwe, and will be continued to Kampala depending on availability of funds. Meanwhile Kenya is looking to raise Ksh358 billion ($2.77 billion) from the Chinese money markets to put on track its standard gauge railway from Naivasha to Malaba as Uganda announced its readiness to start construction on the other side of the border towards the capital Kampala. Kenyan Treasury has been in China to fine-tune details on Nairobi's maiden Panda bond and government sources privy to the deal told The EastAfrican that issuance was being fast-tracked to float the bond in Shanghai before the end of this year. A Panda bond is a sovereign facility issued in the Chinese domestic market and denominated in Yuan Renminbi targeting Chinese investors and institutions.'The bond is Ksh358 billion ($2.77 billion) and there is a mission there in China which are working on the details of that Panda bond. There are currently two officers from the Treasury in China working on that bond,' the source said.'We are still coming up with structures around it (Panda bond) but we have agreed the project (SGR) is going to be funded by the Chinese. In principle, we have agreed but it is still at the conceptual level but I believe it is going to be done before the end of this year. Give it another two to three weeks then we will know how the funding will be done.'China was the key financier of the first two SGR phases—from Mombasa to Nairobi, and then from Nairobi to Naivasha dry port—through loans from the China Export-Import (Exim) Bank. Beijing, however, pulled out of the Malaba extension after Naivasha, citing concerns over its commercial viability and Kenya's rising debt, which raised the risk of loan default—including on Chinese credit. After years of seeking alternative financing, Kenya recently returned to Beijing for funding and last week Prime Cabinet Secretary and Foreign and Diaspora Affairs secretary Musalia Mudavadi said Nairobi was banking on Chinese support to ensure the Panda bond is floated at the start of the next fiscal year.'Panda bond discussions have started and Kenya looks forward to the support of China,' he said after meeting with Chinese counterpart Wang Yi in Changsha, the capital of Hunan province in Southern China. Mudavadi was in China to attend the Ministerial meeting of Coordinators on the Implementation Follow-up Actions of the Forum on China-Africa Cooperation. If successful Kenya would become the second African country, after Egypt, to access the Chinese capital markets through a Panda bond. Cairo raised $480 million via such an instrument in October 2023, which was priced at 3.5 percent for a three-year period. But Nairobi has since expressed difficulty in raising its share and requested additional Chinese support. During President William Ruto's state visit to Beijing in April, the two countries signed a deal to jointly finance the 475-kilometre rail from Naivasha to Malaba, where it is expected to link with Uganda's own SGR extending to Kampala. Lack of a rail link between Kenya and Uganda has meant that most cargo from the Mombasa port is transported by road to Uganda, Rwanda, Burundi, South Sudan and DRC. This overreliance on roads increases both time and cost. But financing constraints in both Kenya and Uganda have long delayed efforts to complete the Naivasha-Kampala railway connection, pushing both governments to court new financiers for their respective sections. With concessional funding drying up—following the expiry of an international programme in March—bonds issued in China, Japan, or the United Arab Emirates (UAE) appear more attractive, especially as Eurobond yields remain high. © Copyright 2022 Nation Media Group. All Rights Reserved. Provided by SyndiGate Media Inc. (

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into a world of global content with local flavor? Download Daily8 app today from your preferred app store and start exploring.
app-storeplay-store