
Toll hike delay at 10 highways aids nearly one million users
Works Minister Datuk Seri Alexander Nanta Linggi said the quantum of increase for Class 1 vehicles, as set out in the concession agreements for the 10 affected highways, ranges between 50 sen and RM4.56, equivalent to a 79 to 83 per cent hike.
For instance, he said Class 1 vehicle users passing through the Kuala Lumpur–Putrajaya Expressway (MEX) Toll Plaza will save RM6.80 for a round trip.
This is because the toll rate under the concession agreement for 2025 is RM6.90, but the current toll rate is being maintained at RM3.50 per one-way trip, he added.
'If this saving is multiplied over 20 days, or a typical month's usage, or 240 days in a year, the user will save RM136 a month or RM1,632 annually,' he said during the Minister's Question Time in the Dewan Rakyat today.
He was responding to a question from Datuk Seri Sh Mohmed Puzi Sh Ali (BN–Pekan) on the implications for highway users if the government had not postponed the toll rate increase for 2025.
On July 23, Prime Minister Datuk Seri Anwar Ibrahim, in an 'announcement of appreciation for Malaysians', said the government had agreed to postpone the toll rate hikes for 10 highways so that the public could continue to enjoy existing rates.
The affected highways include the MEX Expressway, South Klang Valley Expressway (SKVE), Senai–Desaru Expressway (SDE), Duta–Ulu Kelang Expressway (DUKE) and Kuala Lumpur–Kuala Selangor Expressway (LATAR).
Meanwhile, to a supplementary question from Datuk Che Mohamad Zulkifly Jusoh (PN–Besut), who asked why tolls in Malaysia are not abolished altogether, Nanta said it is not easy to abolish tolls, as the government would need substantial funding, including for maintenance works, which could run into billions of ringgit.
He said such funds could otherwise be channelled to other purposes, including for the people in states without highways.
'However, once the concession companies have reached their return on investment (ROI), the current toll rates, which are said to be burdensome, can be reduced. That would be a more practical and realistic approach,' he said. - Bernama
Hashtags

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


The Sun
41 minutes ago
- The Sun
'No RM10k in savings by 30? Something's wrong' — Viral post ignites backlash
A bold social media post has gone viral, stirring intense debate over financial expectations among Malaysians in their 30s. The post bluntly called out working adults who have yet to save RM10,000, saying it's a sign that 'something is wrong.' ALSO READ: Wife recovers over RM10,000 in coins from bathroom door thanks to husband's habit The user called shaunlsm wrote: 'If you're already 30 and still don't have RM10k in savings, something's not right — not to judge, but let's be honest: you've been working for years, yet you're still living like it's day one.' The no-filter statement split netizens down the middle — with some calling it a harsh but necessary truth, and others slamming it as disconnected from economic realities. Supporters said it's a wake-up call for better money habits. 'Finances can be tough sometimes, but I believe that if someone really wants to save, they'll find a way — just like how they always seem to find a way to spend on lifestyle upgrades,' ishraflatifah echoed. But many clapped back, highlighting the struggles faced by the average Malaysian. Critics pointed to rising living costs, stagnant wages, student loans, and family responsibilities as barriers to savings. Some also said the post unfairly shames those who are already trying their best. Instead of blanket statements, others called for more empathetic and realistic conversations about money. 'Having savings is a luxury not everyone can afford,' kwavemy wrote. 'You think savings are just about discipline? Try feeding a family, paying bills, outstanding debts, covering siblings' studies, all on a paycheck that barely stretches to month-end. Savings are a luxury for many, not a sign of failure. Check your privilege before making blanket statements,' aynynsofeaa voiced.


The Star
3 hours ago
- The Star
Malaysians are not retirement-ready
MOST Malaysians feel uncertain about their retirement. This is no surprise – it's a phase of life with no active income, potentially lasting 20 to 30 years, or even longer. That uncertainty often drives people to take action, seeking ways to secure their future: buying insurance, topping up their Employees Provident Fund (EPF), investing in unit trusts, or even purchasing property. These steps feel productive, responsible and reassuring.


Borneo Post
11 hours ago
- Borneo Post
Long-awaited Kapit rural road project included in 13MP
Nanta says this announcement not only brings new hope, but also injects enthusiasm in him to continue fighting for more progress and fair access for the rural areas of Sarawak. KAPIT (Aug 1): Works Minister Dato Sri Alexander Nanta Linggi has expressed gratitude to Prime Minister Datuk Seri Anwar Ibrahim for including the construction and upgrading of 2,800km of rural roads nationwide under the 13th Malaysia Plan (13MP), which would include those in the former's constituency of Kapit. Specifically, the Kapit MP mentioned the long-awaited road project covering Nanga Serau in Song to Nanga Seranau in Kapit. 'This would be part of the rural road development nationwide throughout the 13MP period (2026 to 2030). 'This is very good news for hundreds of longhouse families on the West Bank of Rejang River, who are still relying on river transport, which has been really hard after the express boat service covering Sibu-Kapit sector was discontinued in November 2021. 'As the member of Parliament for Kapit, I fully understand the pain and hardships of my constituents. 'Therefore, this announcement not only brings new hope, but also injects enthusiasm in me to continue fighting for more progress and fair access for the rural areas of Sarawak. 'We thank the Unity Government and the Prime Minister for the concern expressed through this announcement. 'This is proof that the voices of the rural people continue to be given attention in the national development agenda,' said Nanta. Meanwhile, in his remarks, Katibas assemblyman Lidam Assan hailed the 13MP Nanga Serau-Nanga Seranau road project as 'a gift to so many rural residents'. 'This road project is expected to be a catalyst for change, connecting the rural community with the local economic centre; thus opening the way to new job and business opportunities that have been hindered due to infrastructure constraints,' he added. 13MP alexander nanta linggi Kapit rural road