
State government formulates action plan to address waste management issues in capital
The decision was taken at a high-level meeting chaired by Minister for Local Self-Governments (LSG) M.B. Rajesh in the presence of Thiruvananthapuram Mayor Arya Rajendran and other LSGD officials. Special Secretary of the Local Self-Government department T.V. Anupama will be responsible for implementing the action plan. The progress of the action plan will be assessed weekly under the leadership of the Special Secretary. Mr. Rajesh said that a permanent solution will be found for waste management issues in the capital within four months.
A compressed biogas (CBG) plant for treatment of biodegradable waste will be set up in partnership with the Bharat Petroleum Corporation Limited (BPCL). This plant will be completed within a year and a half. The capacity of the existing Rapid Convert System will be increased to 50 tonnes to enable faster processing of biowaste. The modern abattoir at Kunnukuzhy will be inaugurated by the end of the month. A special plan will be formulated and implemented to collect and dispose of poultry waste properly.
Detailed investigation
A detailed investigation will be conducted regarding the forward linkage of private agencies collecting organic waste. The municipality and the Suchitwa Mission will jointly examine whether waste is being collected illegally and whether there are systems to manage the collected waste.
The Minister also directed to strengthen enforcement activities against dumping waste. Prosecution proceedings will be initiated against those who have not yet paid the fines imposed for dumping waste. The Minister also directed to take strict action in cooperation with the police against those who are accused of more serious offences.
Sufficient container Material Collection Facilities (MCF) will be established as a primary storage system for non-biodegradable waste. Currently, 20 container MCFs have been established. A detailed transportation plan will be prepared to transport the collected non-biodegradable waste. Within three weeks, 100 e-autos will be made available to the Harithakarma Sena for this purpose. The Harithakarma Sena volunteers will also be trained in driving these e-autos. Four large covered vehicles will also be ready for waste collection soon.
Bulk waste generators
The meeting also decided to prepare detailed guidelines for collecting waste from bulk waste generators. Arrangements will be made to collect waste daily from institutions that generate large amounts of non-biodegradable waste. Notices will be issued to large institutions immediately, instructing them to hand over the waste to an agency designated by the Corporation.
The Minister also directed to take action to cancel the licenses of institutions that do not hand over waste properly. It was decided that the Harithakarma Sena will continue to collect waste from institutions that have to collect and remove waste only once a week (small institutions).
Hashtags

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


The Hindu
3 days ago
- The Hindu
Suchitwa Mission to step up activities to reduce plastic use
The Suchitwa Mission in collaboration with local bodies will be stepping up its activities to reduce the use and availability of plastic carry bags, as part of the observance of International Plastic Bag Free Day on July 3, said a press release on Wednesday. The State government has already banned several products, including single-use plastic bags, to pave the way for reducing plastic use. Haritha Karma Sena Currently, 37,894 Haritha Karma Sena members are working in various local self-government institutions to collect inorganic waste, including plastic waste, and scientifically dispose of it through the Clean Kerala Company. Suchitwa Mission Executive Director U.V. Jose urged the public to participate in the activities to make the State plastic-free by properly classifying waste and handing it over to the Haritha Karma Sena members, reusing plastic products as much as possible, using alternatives like cloth bags for shopping, and participating in activities to remove plastic waste from public places, beaches, waterbodies, markets and office premises.


New Indian Express
4 days ago
- New Indian Express
Thiruvananthapuram corporation turns into battleground as BJP, LDF trade corruption charges
THIRUVANANTHAPURAM: With just months left for the Thiruvananthapuram corporation council's term to end, tensions are escalating between the BJP and LDF, as both fronts trade corruption allegations. The corporation's main office has effectively turned into a protest zone, frequently disrupting normal functioning and causing inconvenience to the public. The latest council meeting too was marred by noisy confrontations, with corruption charges dominating the session, leaving little room for meaningful discussion on civic issues. BJP councillors have raised a slew of corruption charges against the ruling LDF, including irregularities in the distribution of laptops for students, the purchase of kitchen bins, and other issues. On the other hand, the LDF has levelled serious accusations against BJP women councillors, including misappropriation of Rs 3 lakh by the Punnakkamughal councillor and bribe collection for distributing application forms for various welfare schemes by the Pappanamcode councillor. On Monday, the corporation's main office witnessed yet another round of protests. A march led by Haritha Karma Sena workers belonging to CITU reached the corporation office, demanding the resignation of the tainted BJP councillors. They also demanded that Haritha Karma Sena workers who were suspended in connection with the incident in the Punnakkamughal ward be reinstated. UDF parliamentary party leader P Padmakumar criticised both the BJP and LDF, stating that the two parties were hurling allegations at each other to divert attention from their own corruption. 'The ruling front has been mired in corruption since it assumed power. Backdoor appointments, anomalies in tax collection, and irregularities in the purchase of kitchen bins and laptops, as well as misappropriation of SC/ST funds, are among the many allegations involving the LDF,' he said. Meanwhile, amidst the allegations against BJP women councillors, the BJP staged a march to the corporation office, highlighting corruption in the LDF-led laptop distribution scheme. 'This LDF-led administration is corrupt and is targeting our councillors to divert attention from their own misdeeds. The allegations against us are baseless. As the Opposition, we don't have access to public funds to misappropriate,' said BJP parliamentary party leader M R Gopan. The LDF has announced plans to intensify protests against BJP councillors accused of corruption at the ward level. LDF parliamentary party leader D R Anil demanded the resignation of the accused councillors. 'The Pappanamcode councillor herself admitted that corruption took place in her ward. This has embarrassed the entire council and betrayed public trust. We will launch a protest to make the public aware of their actions,' he said.


The Hindu
5 days ago
- The Hindu
From The Hindu, July 1, 1975: Detention without assigning grounds: ordinance issued
The President has promulgated an ordinance amending the Maintenance of Internal Security Act (MISA) to empower the Central and State Governments to detain any person upto a maximum period of one year during the operation of the Emergency, without assigning any grounds for the detention. The ordinance issued late last night under Article 123 of the Constitution, however, stipulates that the detaining authority has to make a declaration — and communicate it to the person concerned — that the detention is necessary 'for effectively dealing with the Emergency.' When the orders for detention have been passed by a subordinate authority, it has to be reviewed by the State Government within 15 days of the issue of the necessary declaration. It will cease to have any effect unless it has been confirmed by the State Government. The question whether the detention of a person should be continued shall be considered by the appropriate Government within four months of the date of the original declaration and thereafter at intervals not exceeding four months in each case. The ordinance empowers the Central and State Governments to detain a person without disclosing the grounds for detention during the operation of the Emergency or a period not exceeding 12 months whichever is shorter, but it also provides for the extension of detention of the same person beyond one year through a fresh order issued under the amended act.