logo
Matsyagandha Express to arrive late on July 23, 24

Matsyagandha Express to arrive late on July 23, 24

The Hindu20 hours ago
Train No. 12619, Mumbai LTT-Mangaluru Central Matsyagandha Express, will be regulated for 55 minutes and 20 minutes, respectively, between Udupi and Mulki on Wednesday and Thursday to facilitate signal points replacement at Surathkal Railway Station.
A release from Konkan Railway Corporation Ltd. stated that it would operate a non-interlocking block for the replacement of points No. 101 and 102 at Surathkal from July 23 to July 26, resulting in the detention of some trains and consequent delays. Matsyagandha's regulation en route could delay its arrival at Mangaluru Central. Train No. 20646, Mangaluru Central-Madgaon Vande Bharat Express, would be regulated for 35 minutes at Thokur on July 23.
Also, Train No. 16311, Shri Ganganagar-Thiruvananthapuram North Express, would be regulated on the Udupi-Mulki section for 50 minutes on July 24, the release added.
Block at Loliem and Asnoti section
In another release, KRCL said it would operate a traffic and power block for PTFE Erection at overhead equipment mast between Loliem and Asnoti section on July 24 between 10.20 a.m. and 1.50 p.m.
Consequently, Train No. 56616 Mangaluru Central-Madgaon Passenger of July 24 would be regulated for 90 minutes between Kumta-Karwar section. Train No. 56615, Madgaon-Mangaluru Central Passenger, of July 24 would leave Madgaon at 3.10 p.m. instead of 2.10 p.m.
Train No. 09057, Udhna-Mangaluru Junction Special, of July 23 would be regulated for 30 minutes on Madgaon-Canacona section, the release added.
Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

Matsyagandha Express to arrive late on July 23, 24
Matsyagandha Express to arrive late on July 23, 24

The Hindu

time20 hours ago

  • The Hindu

Matsyagandha Express to arrive late on July 23, 24

Train No. 12619, Mumbai LTT-Mangaluru Central Matsyagandha Express, will be regulated for 55 minutes and 20 minutes, respectively, between Udupi and Mulki on Wednesday and Thursday to facilitate signal points replacement at Surathkal Railway Station. A release from Konkan Railway Corporation Ltd. stated that it would operate a non-interlocking block for the replacement of points No. 101 and 102 at Surathkal from July 23 to July 26, resulting in the detention of some trains and consequent delays. Matsyagandha's regulation en route could delay its arrival at Mangaluru Central. Train No. 20646, Mangaluru Central-Madgaon Vande Bharat Express, would be regulated for 35 minutes at Thokur on July 23. Also, Train No. 16311, Shri Ganganagar-Thiruvananthapuram North Express, would be regulated on the Udupi-Mulki section for 50 minutes on July 24, the release added. Block at Loliem and Asnoti section In another release, KRCL said it would operate a traffic and power block for PTFE Erection at overhead equipment mast between Loliem and Asnoti section on July 24 between 10.20 a.m. and 1.50 p.m. Consequently, Train No. 56616 Mangaluru Central-Madgaon Passenger of July 24 would be regulated for 90 minutes between Kumta-Karwar section. Train No. 56615, Madgaon-Mangaluru Central Passenger, of July 24 would leave Madgaon at 3.10 p.m. instead of 2.10 p.m. Train No. 09057, Udhna-Mangaluru Junction Special, of July 23 would be regulated for 30 minutes on Madgaon-Canacona section, the release added.

Madgaon-Mangaluru MEMU Express to stop at Harwada and Mirjana
Madgaon-Mangaluru MEMU Express to stop at Harwada and Mirjana

The Hindu

timea day ago

  • The Hindu

Madgaon-Mangaluru MEMU Express to stop at Harwada and Mirjana

The Railways has provided stoppages for Train No. 10107/108 Madgaon-Mangaluru Central-Madgaon Mainline Electrical Multiple Unit (MEMU) Express at Harwada and Mirjana stations in Uttara Kannada district on an experimental basis, effective from Tuesday. Train No. 10107 Madgaon-Mangaluru Central MEMU Express arrives at Harwada at 5.52 a.m. and Mirjana at 6.40 a.m. Train No. 10108 Mangaluru Central-Madgaon MEMU Express arrives Mirjana at 7.36 p.m. and Harwada at 8.14 p.m. The trains would stop for one minute at both stations, according to releases from the Konkan Railway Corporation Ltd. and Southern Railway.

Ministry approves regularisation of Vijayapura-Mangaluru train
Ministry approves regularisation of Vijayapura-Mangaluru train

Time of India

time28-06-2025

  • Time of India

Ministry approves regularisation of Vijayapura-Mangaluru train

Mangaluru: The railway ministry has approved the South Western Railway's (SWR) proposal to regularise the services of train No. 07377/07378 Vijayapura-Mangaluru Central-Vijayapura Special, thereby bringing much relief to passengers. Dakshina Kannada MP Capt Brijesh Chowta said the long-pending demand to regularise the Vijayapura–Mangaluru train has been fulfilled. "This move will benefit patients from north Karnataka seeking medical care in Mangaluru, students pursuing education in coastal districts, and regular passengers. Much gratitude to our Union minister of railways Ashwini Vaishnaw, minister of state for railways V Somanna for enabling this," Capt Chowta wrote on social media platform X. The ministry stated in a notification dated June 27 that it approved the proposal of SWR for regularisation of 07377/ 07378 Vijayapura-Mangaluru Central Special as 17377/ 17378 Vijayapura-Mangaluru Central Express. "The above regularisation may be given effect from an early convenient date,'" the ministry stated. Passengers had to pay enhanced fares on the special (train on demand) services compared to the regular services. As per the June 27 notification, the departure timing of train No. 17378 is 4.45pm from Mangaluru Central, and will arrive in Vijayapura at 11.15am. Meanwhile, train No. 17377, Vijayapura-Mangaluru Central Express, leaves Vijayapura at 3pm to reach Mangaluru Central at 9.50am. The Vijayapura-Mangaluru Junction train was introduced in Nov 2019. Later, the special trains got cancelled during the Covid-19 pandemic. After the restoration of the services from Dec 1, 2021, the route was extended to Mangaluru Central from April 2024. The trains will have stoppages at Basavana Bagewadi Road, Alamatti, Bagalkot, Guledagudda Road, Badami, Hole Alur, Mallapur, Gadag, Annigeri, Hubballi, Yalvigi, Haveri, Byadagi, Ranebennur, Harihar, Davanagere, Chikjajur, Birur, Kadur, Arasikere, Hassan, Sakleshpur, Subrahmanya Road, Kabaka Puttur, Bantwal, and Mangaluru Junction.

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into a world of global content with local flavor? Download Daily8 app today from your preferred app store and start exploring.
app-storeplay-store