
State Highways to construct new bridge across Then Pennar river in Tiruvannamalai
The proposal of the Highways Department comes after the newly-opened ₹15.9-crore bridge across the river collapsed when excess rainwater of over two lakh cusecs was released from Sathanur dam, located 24 km from the village upstream, following heavy rainfall triggered by Cyclone Fengal in December. 'Ever since the bridge collapsed, we had had to trek at least 20 km to reach nearby towns like Thandrampattu and from then, it has been a long-standing demand of the residents of at least 8-10 villages,' D. Pulivendan, president, Thondamanur village panchayat, said.
The bridge that collapsed was inaugurated by Minister for Public Works, Highways and Minor Ports E.V. Velu, on September 2, 2024. 'Technical design and estimated cost for the proposed bridge across the river is ready. Work on the new bridge will commence in the coming months,' a State Highways official told The Hindu.
According to Highways officials, the project to construct the proposed bridge would be executed by the Construction and Maintenance wing of the Department, led by P. Gnanavel, Divisional Engineer (DE), State Highways (Tiruvannamalai), with funds sanctioned under the NABARD scheme. As per plan, the proposed high-level bridge will be 250 metre long and 12 metre wide. The height of the new bridge will be at least 12 metres — five metres higher than the collapsed bridge.
Officials said that an increase in height, especially the decks of the bridge, would help the structure to withstand huge influx of excess rainwater released in the river during heavy rainfall. The rise in height of the new structure was decided based on a study of massive floods that happened over the past 100 years, officials said.
Another key change is that the proposed bridge would be built away from the collapsed structure. Highways officials attribute change of river course to be the reason for moving away from the earlier location of the bridge. 'The new plan is to build the bridge at least 200 metre away from the collapsed bridge as the river course is much more straight now. The study found that the curved portion of the river could have been the reason for the structural instability of the earlier bridge that collapsed,' said an official.
Highway officials said that the proposal for the new bridge has been sent to the State government for financial clearance as technical study for the project has been completed. The project will be announced by the State government in the coming weeks before tenders were floated for the new bridge.

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


India Today
6 hours ago
- India Today
Himachal on edge amid heavy rain, red alert in 4 districts, key roads cut off
Several parts of Himachal Pradesh are expected to receive extremely heavy rainfall in the coming hours as the monsoon intensifies across the state. Four districts -- Chamba, Kangra, Kullu, and Mandi -- have been placed under a red alert for very heavy rain, while the rest of the state remains under an orange alert amid increasing Shimla, which is witnessing heavy to very heavy rainfall, schools have been closed as a precautionary measure. In Mandi district, continuous rain has triggered landslides, blocking over 170 roads, including three National Highways. Ongoing downpours are hampering recovery efforts, making it difficult to restore district is also grappling with the impact of heavy rain. A landslide in Bharmaur destroyed a house, claiming the lives of two people, a man and a woman, who were buried under the debris. Additionally, a cloudburst in the Churah region swept away a small bridge on the Pangola–Thalli road and blocked several key routes, further isolating affected areas. Flash floods have been reported in several locations, destroying agricultural fields and damaging standing maize crops due to overflowing streams. With roads washed away, multiple regions remain cut off and are struggling without essential supplies, as transportation of goods and services has been severely authorities have advised residents across Himachal Pradesh to stay indoors unless absolutely necessary and to avoid travelling through hilly or landslide-prone areas. In neighbouring Uttarakhand, the meteorological department has also issued an orange alert for heavy to very heavy rainfall in six districts on Monday. Dehradun, Tehri, Pauri, Nainital, Champawat, and Udham Singh Nagar are on high alert. The forecast also includes the possibility of lightning and strong winds, adding to the severity of the far, 471 roads, including three National Highways, have been closed due to adverse weather conditions. Local administrations remain on high alert, coordinating efforts to mitigate risks and ensure timely response. The situation remains fluid, with authorities closely monitoring developments.- EndsMust Watch IN THIS STORY#Himachal Pradesh


Indian Express
23-06-2025
- Indian Express
Rapid warming, extreme weather hit Asia hard in 2024, killing thousands and impacting economies: report
With its average temperature 1.04 degree Celsius above the last 30-year average, 2024 ranked as Asia's warmest to second warmest year on record, owing to different dataset interpretations, and its warming was nearly twice as fast as the global average, said a new report by the World Meteorological Organization (WMO). The impacts of this high rate of warming in 2024 manifested through a range of extreme weather events, such as 29 tropical cyclones, prolonged and intense heat waves, and extreme rainfall events, that together killed thousands. These weather events also caused substantial losses to local communities and economies at large. 'The warming trend between 1991-2024 was almost double of that during the 1961-1990 period,' said the State of Climate in Asia 2024 report. The report is prepared by WMO in collaboration with regional and international meteorological organisations. 'Extreme weather is already exacting an unacceptably high toll,' said Professor Celeste Saulo, Secretary-General, WMO. She added that the report highlights how changes in key climate indicators such as surface temperature, glacier mass and sea level will have major repercussions for societies, economies and ecosystems in the region. The surface temperatures were warmer than average for almost the entire region, the WMO report said, and they were particularly above average from western China to Japan, over the Indochina Peninsula, the Middle East and central northern Siberia. Japan, for instance, experienced its warmest year on record, exceeding the previous record set in 2023. The region was hit by intense land heat waves as well as marine heat waves. East Asia saw prolonged heatwaves from April to November, and monthly average temperature records were shattered in Japan, the Republic of Korea and China. In India, extreme heatwaves caused over 450 deaths across the country, the report said. India also saw deadly lightning events, killing about 1,300 people across the country. Among tropical cyclones, Yagi was the strongest and deadliest in 2024. It impacted the Philippines, Vietnam, Hong Kong, Macau, China, Laos, Thailand and Myanmar, and according to estimates, the damages ran into billions of dollars. The northern Indian Ocean, which is adjacent to Japan and the Yellow and East China seas, faced particularly severe or extreme intensity of marine heatwaves. In terms of its extent, marine heatwaves created a record in 2024, impacting an area of nearly 15 million square kilometres. While four tropical cyclones – Remal, Fengal, Dana – made landfall in the Indian sub-continent and killed about 90 people, Cyclone Asna, originating from the Arabian Sea, caused flooding in Gujarat and killed about 50 people. In terms of rainfall, above normal rain was observed in the Arabian desert, Balochistan, parts of Myanmar, certain islands in Japan and even in the Siberian plains. Very heavy rainfall affected western Asia in mid-April, with daily rainfall in some areas exceeding the long-term annual average rainfall. The Dubai airport received 162.88 mm in 36 hours on 15 and 16 April, including 142 mm on April 16. Meanwhile, Pakistan recorded its wettest April, and India witnessed the deadly rain-triggered landslide in Kerala's Wayanad district. Over 500 mm of rainfall in 48 hours was said to be one of the chief causes of the disaster, which killed over 350 people. Glaciers continued to lose mass, as per the report, with 23 out of 24 glaciers in the High Mountain Asia region of central-south Asia spanning the Himalayas, Pamir mountains, Karakoram, and Hindu Kush. 'Reduced winter snowfall and extreme summer heat in the central Himalayas and most of the Tian Shan intensified mass loss for most glaciers. Notably, Urumqi Glacier No. 1, located in eastern Tian Shan, recorded its most negative mass balance since measurements began in 1959,' the report. An award-winning journalist with 14 years of experience, Nikhil Ghanekar is an Assistant Editor with the National Bureau [Government] of The Indian Express in New Delhi. He primarily covers environmental policy matters which involve tracking key decisions and inner workings of the Ministry of Environment, Forest and Climate Change. He also covers the functioning of the National Green Tribunal and writes on the impact of environmental policies on wildlife conservation, forestry issues and climate change. Nikhil joined The Indian Express in 2024. Originally from Mumbai, he has worked in publications such as Tehelka, Hindustan Times, DNA Newspaper, News18 and Indiaspend. In the past 14 years, he has written on a range of subjects such as sports, current affairs, civic issues, city centric environment news, central government policies and politics. ... Read More


The Hindu
05-06-2025
- The Hindu
State Highways to construct new bridge across Then Pennar river in Tiruvannamalai
The State Highways Department is planning to construct a new high-level bridge across the Then Pennar river between Agarampallipattu and Thondamanur village near Thandrampattu town in Tiruvannamalai as a replacement to the collapsed bridge there, as residents have been pressing for their demand of easy connectivity to reach nearby towns. The proposal of the Highways Department comes after the newly-opened ₹15.9-crore bridge across the river collapsed when excess rainwater of over two lakh cusecs was released from Sathanur dam, located 24 km from the village upstream, following heavy rainfall triggered by Cyclone Fengal in December. 'Ever since the bridge collapsed, we had had to trek at least 20 km to reach nearby towns like Thandrampattu and from then, it has been a long-standing demand of the residents of at least 8-10 villages,' D. Pulivendan, president, Thondamanur village panchayat, said. The bridge that collapsed was inaugurated by Minister for Public Works, Highways and Minor Ports E.V. Velu, on September 2, 2024. 'Technical design and estimated cost for the proposed bridge across the river is ready. Work on the new bridge will commence in the coming months,' a State Highways official told The Hindu. According to Highways officials, the project to construct the proposed bridge would be executed by the Construction and Maintenance wing of the Department, led by P. Gnanavel, Divisional Engineer (DE), State Highways (Tiruvannamalai), with funds sanctioned under the NABARD scheme. As per plan, the proposed high-level bridge will be 250 metre long and 12 metre wide. The height of the new bridge will be at least 12 metres — five metres higher than the collapsed bridge. Officials said that an increase in height, especially the decks of the bridge, would help the structure to withstand huge influx of excess rainwater released in the river during heavy rainfall. The rise in height of the new structure was decided based on a study of massive floods that happened over the past 100 years, officials said. Another key change is that the proposed bridge would be built away from the collapsed structure. Highways officials attribute change of river course to be the reason for moving away from the earlier location of the bridge. 'The new plan is to build the bridge at least 200 metre away from the collapsed bridge as the river course is much more straight now. The study found that the curved portion of the river could have been the reason for the structural instability of the earlier bridge that collapsed,' said an official. Highway officials said that the proposal for the new bridge has been sent to the State government for financial clearance as technical study for the project has been completed. The project will be announced by the State government in the coming weeks before tenders were floated for the new bridge.