
S'wak to launch sustainability blueprint to drive green economy transition
The Sarawak Public Communications Unit said the blueprint will be launched by Sarawak Premier Tan Sri Abang Johari Tun Openg.
The blueprint features 10 strategic thrusts, 48 strategies, and 111 action plans, with targets including the development of 10 gigawatts (GW) of renewable energy capacity and achieving a 70 per cent renewable energy mix by 2030.
"Recently finalised by the Energy and Environmental Sustainability Sarawak Ministry, the blueprint was a key point of discussion during a high-level roundtable session held earlier today at the London School of Economics and Political Science (LSE).
"The session, led by the Sarawak Premier along with his delegation, brought together scholars and experts to explore sustainability and green development strategies," it said in a statement today.
It said the session marked a pivotal step in strengthening academic-policy collaboration, particularly in the area of sustainable growth and climate resilience.
"The dialogue at LSE emphasised partnerships and knowledge exchange to advance the state's sustainability ambitions, with a shared commitment to balancing economic growth, environmental protection, and social inclusion," it said.
The event was part of the Premier's working visit to the United Kingdom, which began on Tuesday.
The statement added that LSE also expressed strong interest in potential collaboration with Sarawak in areas such as forest conservation, financial services, education, and climate change.
– Bernama
Hashtags

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


Borneo Post
5 hours ago
- Borneo Post
New matriculation college to be built in Sematan, says Tanjong Datu rep
Azizul (third left) presents a prize to a winner of a competition. Also seen are Niponi (first left) and Abdul Aziz (second right). —Ukas photo KUCHING (July 28): A new matriculation college will be built in Sematan to enhance access to education in rural areas, said Tanjong Datu assemblyman Azizul Annuar Adenan. He said the establisment of the college is a crucial initiative to empower rural youths, especially students from Lundu, Sematan and the surrounding areas, by providing better opportunities for higher education. 'This college will not only offer more pathways for our local children to pursue further studies but will also act as a catalyst for economic and social development within the community,' he said when speaking at the closing of the Sematan Festival 2025 on Sunday, according to a Sarawak Public Communications Unit (Ukas) report. Azizul said the construction of the college is expected to begin next year once the planning phase and technical approvals are finalised. He added both the Sarawak and federal governments are expected to work together on the project. On the Sematan Festival 2025, Azizul expressed his appreciation to the Ministry of Tourism, Creative Industry and Performing Arts (MTCP) for their support in making the event a success. He proposed that the festival be held annually with a more inclusive and larger-scale approach. This year's festival featured a wide range of activities, including a powerboat race, E-sports competition, 'rakyat' concert, Joran Challenge, and the Sematan Duathlon 2025, which drew thousands of visitors from various backgrounds. Also present at the event were political secretaries to the Premier of Sarawak, Abang Abdul Aziz Abang Draup and Niponi Undek; MTCP permanent secretary Datu Sherrina Hussaini; and Lundu district officer Awang Yusup Awang Mostapha. azizul annuar adenan college education matriculation


Borneo Post
9 hours ago
- Borneo Post
Abang Johari in Jakarta for pre-meeting ahead of Malaysia-Indonesia Annual Consultation
Abang Johari's arrival at Jakarta today – Photo from Ukas KUCHING (July 28): Premier Datuk Patinggi Tan Sri Abang Johari Tun Openg has arrived in Jakarta with the Sarawak government delegation to attend a pre-meeting session in conjunction with Prime Minister Datuk Seri Anwar Ibrahim's official visit to Indonesia and the 13th Annual Malaysia–Indonesia Consultation today. According to a report from Sarawak Public Communications Unit (Ukas), Abang Johari and his delegation landed safely at Halim Perdanakusuma International Airport at 11.17am local time before heading to Hotel Indonesia Kempinski Jakarta. He was accompanied by Sarawak State Secretary Datuk Amar Mohamad Abu Bakar Marzuki and Deputy Minister for Utility and Telecommunication (Sarawak Energy Berhad and PETROS) Dato Ibrahim Baki. During his stay in Jakarta, he is scheduled to join Anwar in several official programmes, including a meeting with senior editors from Indonesian media and members of the Malaysia-Indonesia Journalists' Friendship Association (ISWAMI), as well as a bilateral meeting with Indonesian President Joko Widodo at the Merdeka Palace on Tuesday. The programme will also see the signing of a Memorandum of Understanding on health cooperation between Malaysia's Minister of Foreign Affairs and Indonesia's Minister of Health. Both delegations are then scheduled to hold the 13th Annual Consultation session, which is an important platform for strengthening Malaysia-Indonesia bilateral ties. Abang Johari will also join the Malaysian delegation for a visit to the ASEAN Secretariat in Jakarta. The visit includes a tree-planting ceremony, a group photo session to mark Malaysia's ASEAN Chairmanship in 2025, a guest book signing, and the symbolic handover of a painting to reaffirm regional cooperation. Abang Johari Tun Openg anwar ibrahim bilateral ties Indonesia-Malaysia lead

The Star
18 hours ago
- The Star
Coping with Bintulu's rising energy demand towards industrial growth
KUCHING: Bintulu's power generation capacity will be tripled to 1.5 gigawatts (GW) from the existing 500 megawatts (MW) to cope with the rising energy demand in its rapid industrial development. A new 500MW gas-powered plant is currently in construction under Sarawak Gas Roadmap to double the power generating capacity, according to Sarawak Premier Tan Sri Abang Johari Tun Openg. He said another upcoming 500MW project would bring Bintulu's total power generation capacity to 1.5GW. However, he had not provided a time-line for the implementation of this second project when launching the RM466mil iconic Bintulu-Jepak Bridge, stretching 1.2km across Batang Kemena. The Premier later renamed the bridge as Tun Taib Mahmud Bridge. The 500MW gas power plant will be managed by Petroleum Sarawak Bhd (Petros). Abang Johari also announced the construction of a new dual-carriage road to link the bridge to Bintulu Airport, opening the way for urban expansion, including modern residential and commercial zones. Bintulu was a small and under-populated fishing village 50 years ago. The town has dramatically transformed with the discovery of offshore gas resources. This led to the development of MLNG Satu liquefaction terminal by Petroliam Nasional Bhd which commenced operations in 1983. MLNG now has nine production trains with capacity of 30 million tonnes per annum. Bintulu's industrial development took a major leap with the launch of Sarawak Corridor for Renewable Energy (Score) in 2008, and the set up of the Samalaju Industrial Park for energy-intensive industries powered by hydro power. The park has attracted large investments in aluminium and ferroalloys smelting plants and other industries. Two weeks ago, Abang Johari performed the ground breaking ceremony for the RM2bil investment by OCI Tokuyama Semiconductor Materials Sdn Bhd in a manufacturing plant to produce high-purity semiconductor-grade polysilicon for export. In January, state-owned Sarawak Petchem Sdn Bhd marked a milestone by starting the export of methanol to China from its plant in Bintulu. Besides, a Sarawak Petrochemical Hub and Sarawak New Energy Hub are under development in Bintulu where manufacturing plants under Projects H2biscus and H2ornbill to produce hydrogen derivatives, and hydrogen are in the pipeline. While on his working trip to Bintulu, Abang Johari also launched Petros's first piped gas project for the industrial town to residential homes in the Sungai Plan housing area. The pilot phase involves the construction of a dedicated reticulation system, which includes a newly built city gate station, over 3km long distribution pipeline and internal piping for the initial 39 connected households. Petros targets to extend the piped gas coverage to 3,500 houses by end-2027. Before Bintulu, Miri is the only town in Sarawak to get piped gas. Under the Sarawak Gas Roadmap, state-owned Petros said Bintulu has been designated as one of the four strategic gas hubs, alongside Miri, Samalaju and Kuching. These hubs form part of a statewide 'hub-and-spoke' model that aims to deliver consistent and reliable gas supply to both urban and hinterland areas across Sarawak. According to Petros, which is Sarawak' sole gas aggregator, investments in supporting infrastructure for the gas hubs are well underway. In Bintulu, Petros said it is constructing the 65km-long Samalaju Pipeline to supply natural has to industries in Samalaju Industrial Park. 'Petros is also progressing works on the gas to Bintulu Trunkline project, extending gas pipeline from the Kidurong Industrial Area to Jepak and Samalaju Industrial Park Ringmain, which will further enhance intra-zone gas distribution. 'For areas not yet connected to the pipelines, Petros has implemented a Virtual Pipeline System (VPS) using modular transport to deliver natural gas via road and sea.' In Kuching, Petros said the first customer is expected to receive natural gas supply via the VPS by December this year, with a broader rollout planned for 2026. 'These efforts aim to raise Sarawak's domestic gas utilisation from 6% to at least 30% by 2030 in alignment with the Sarawak government's energy transition agenda,' it added. Abang Johari also announced plans to implement the Autonomous Rail Transit (ART) System to connect Bintulu, Kidurong and Samalaju to enhance mobility. The ART system is currently in advanced development in Samarahan-Kuching Divisions under Kuching Urban Transportation System. Under Phase 1 (Blue Line), ART is expected to commence operations in stages from the fourth quarter of 2026.