Basra to Add Four New Water Desalination Plants
The Iraqi government has approved a proposal from the Basra Governorate to include four new water desalination projects in its development plans.
The approved plants are:
Shatt Al-Arab Desalination Plant, with a capacity of 5,000 m³/hour;
Al-Faw and Al-Seeba Desalination Plant, with a capacity of 3,000 m³/hour;
Abu Floos Desalination Plant, with a capacity of 3,000 m³/hour;
Safwan Desalination Plant, with a capacity of 1,000 m³/hour.
These projects aim to address the growing demand for potable water and support public health and infrastructure in the province.
(Source: PMO)

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


Iraq Business
9 hours ago
- Iraq Business
Iraq Eyes Global Operator for Next Phase of Al-Faw Grand Port
By John Lee. The General Company for Ports of Iraq (GCPI) has announced the near-completion of the infrastructure phase of the Grand Al-Faw Port, with plans to soon select a global operator to develop and manage the superstructure. Director General Farhan Al-Fartousi told the state-run Iraqi News Agency (INA) that 11 major international companies have been invited to bid, with the contract to be awarded to the operator that best aligns with the port's technical and commercial requirements. He also confirmed that several key components of the project, including the main connecting road and five berths, have already reached 100% completion. In parallel, the GCPI is implementing an advanced maritime navigation and monitoring system in coordination with the International Maritime Organization (IMO). Al-Fartousi noted that the IMO's technical consultant recently held meetings in Iraq with the Italian firm overseeing specifications for the port's navigation channel. A follow-up visit by IMO's maritime advisor in London is planned for November. As part of these improvements, GCPI will deploy a new system of buoys and sensors - with lighting akin to airport runways - to enhance visibility for vessels navigating through fog and high humidity. The spacing between buoys will be reduced to 1.5-2 nautical miles (compared to 3 nautical miles in the Khor Abdullah channel) to accommodate large vessels and deep-water operations. Two offshore platforms will also be installed near the breakwater to monitor wind speed, wave height, and tidal conditions, improving safety for incoming and outgoing ships. The port has been designed with future growth in mind, including vessel drafts of up to 16.4 metres, and reserves deeper strategic capacity for even larger vessels and expanded trade volumes in the future. (Source: INA)


Iraq Business
9 hours ago
- Iraq Business
Basra to Add Four New Water Desalination Plants
By John Lee. The Iraqi government has approved a proposal from the Basra Governorate to include four new water desalination projects in its development plans. The approved plants are: Shatt Al-Arab Desalination Plant, with a capacity of 5,000 m³/hour; Al-Faw and Al-Seeba Desalination Plant, with a capacity of 3,000 m³/hour; Abu Floos Desalination Plant, with a capacity of 3,000 m³/hour; Safwan Desalination Plant, with a capacity of 1,000 m³/hour. These projects aim to address the growing demand for potable water and support public health and infrastructure in the province. (Source: PMO)


Iraqi News
13 hours ago
- Iraqi News
Iraq to choose foreign firm to finish Al-Faw Grand Port's superstructure
Baghdad ( – The director of the General Company for Ports of Iraq (GCPI), Farhan Al-Fartousi, revealed on Thursday that the infrastructure phase of the Al-Faw Grand Port will be completed soon and that an internationally recognized operator is being chosen to complete the superstructure. Al-Fartousi told the state-run news agency (INA) that 11 foreign firms were asked to bid on a contract and that it would be awarded to the operator who best fits the port's operational and commercial demands, as backed by a full feasibility assessment covering volume and return expectations. The Iraqi Minister of Transport, Razzaq Al-Saadawi, revealed in March that the first phase of the Al-Faw Grand Port will be completed by the end of 2025. The first phase of the project consists of five piers, which have been completely finished; a 62-kilometer road that connects the Al-Faw Grand Port to Umm Qasr port city; a 2,400-meter-long submerged tunnel; a ship canal; and a container yard, according to the Iraqi News Agency (INA). The Al-Faw Grand Port is located on the Khor Abdallah Channel, near the mouth of Shatt Al-Arab. According to Maritime Gateway News, the five container shipping berths, which have been constructed by Daewoo E&C, a company located in South Korea, can each hold ships up to 23,000 twenty-foot equivalent units (TEU). With 100 berths and the potential to accommodate 7.5 million TEU per year, the Al-Faw Grand Port is projected to overtake Dubai's 67-berth Jebel Ali as the Middle East's largest container port when completed in 2038. The port's first phase, which is expected to be completed in 2028, has the potential to accommodate four million TEU of cargo per year. The $7 billion logistics project, which connects Basra to Turkey by land, will compete with Egypt's Suez Canal and establish Basra as a gateway to Europe.