
Anant Raj Q1 profit rises 38 pc to Rs 126 cr
PTI
New Delhi, Jul 25 (PTI) Realty firm Anant Raj Ltd has reported a 38 per cent increase in consolidated profit to Rs 125.90 crore for the first quarter of this fiscal on higher income.
The company had reported a net profit of Rs 91.01 crore in the year-ago period.
Total income rose to Rs 602.40 crore during April-June period of 2025-26 fiscal, from Rs 481.66 crore in the corresponding period of the preceding year, according to a latest regulatory filing.
During the 2024-25 financial year, Anat Raj Ltd had posted a net profit of Rs 425.82 crore on a total income of Rs 2,100.28 crore.
The Delhi-NCR based company mainly develops housing and data centre projects. PTI MJH DRR
Disclaimer: Comments reflect users' views, not News18's. Please keep discussions respectful and constructive. Abusive, defamatory, or illegal comments will be removed. News18 may disable any comment at its discretion. By posting, you agree to our Terms of Use and Privacy Policy.

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


NDTV
8 minutes ago
- NDTV
Mahindra BE 6, XEV 9e Pack Two Deliveries Begin, Check Details
Mahindra is actively expanding its product lineup for the Indian market, aligning with its strategy behind the recent launch of mid-spec Pack Two variants for the BE6 and XEV 9e electric SUVs. These new variants, equipped with the larger B79 battery pack, promise enhanced driving range, with claims of over 500 km on a single charge. Now, customers can choose from the 59 kWh and 79 kWh battery packs, depending on their specific utility needs. The brand has now started the delivery procedure of the Mahindra Be6 and XEV 9e Pack Two B79 variants across India. The Mahindra BE 6 Pack Two B79 is powered by a 79 kWh battery pack and is capable of producing a peak power and torque output of 281 hp and 380 Nm. In comparison, the smaller 59 kWh battery yields 227 hp of power. Also, the larger battery pack option has given it a range boost as it can now run up to 683 km on a single charge. Meanwhile, the 59 kWh battery variant is set to provide a range of just 557 km. Mahindra BE 6 Talking about the Mahindra XEV 9e, the power and torque figures of the pack two remain unchained from the BE6. However, the XEV 9e's B79 variant claims a range of 656 km on a single charge. Meanwhile, its smaller battery, a 59 kWh battery variant, promises 542 km on a single charge. Mahindra XEV 9e The Mahindra BE 6 Pack Two B79 is available at a price tag of Rs 24.25 lakh (ex-showroom). Meanwhile, the Mahindra XEV 9e Pack Two B79 is tagged at Rs 27.29 lakh (ex-showroom). However, customers can also opt for the smaller Pack Two B59 variant as well, available at Rs 22.65 lakh (ex-showroom) for the BE 6 and Rs 25.65 lakh (ex-showroom) for the XEV 9e.


Time of India
8 minutes ago
- Time of India
Indian shrimp exporters brace for unprecedented challenge in US; volumes to drop 7-9%
Indian shrimp exporters are bracing for a tough time in the US market. This is due to new tariffs. These tariffs add to existing duties. Crisil Ratings anticipates a potential drop in export volume. Operating margins may also decline. Exporters are exploring alternative markets. The government supports the sector through schemes like PMMSY. Tired of too many ads? Remove Ads Tired of too many ads? Remove Ads New Delhi:: Indian shrimp exporters will face a new, unprecedented challenge in US markets after the imposition of reciprocal tariffs on India, said Rahul Guha, Senior Director at Crisil Ratings "Indian shrimp exporters face an unprecedented new challenge in the US market, which contributes close to 48 per cent of their exports," Guha noted that with the proposed US tariff hike, additional financial penalties, the 5.77 per cent countervailing duty imposed last year, and existing anti-dumping duties, India is set to become one of the most heavily taxed major shrimp exporters in the US market."In contrast, Ecuador, the largest shrimp exporter globally, faces just a 10 per cent tariff and countervailing duties of 3-4 per cent in the US," Guha added."In this milieu, the shrimp export volume could potentially fall 7-9 per cent in this fiscal, even as players look for alternative markets to boost their exports," he to the Crisil Ratings Senior Director, the operating margin will also fall 50-100 basis points due to the added cost burden of tariffs and their gradual pass-through due to competition from Ecuador."Thus, the credit profiles of shrimp exporters, already under pressure, will witness further challenges," Guha the financial year 2023-24, India exported an all-time high volume of 17,81,602 MT of seafood worth Rs. 60,523.89 Products Export Development Authority (MPEDA), a statutory body under the Ministry of Commerce and Industry, promotes and regulates the export of marine initiatives by MPEDA for boosting shrimp exports are oriented towards production and processing, and not strengthen the export value chain, the government has sanctioned projects adjacent to major ports, namely, modernisation and upgradation of fishing harbour at Visakhapatnam, Chennai, Paradip, Cochin and Mumbai Port with 100 per cent financial assistance under PMMSY in convergence with Sagarmala at a total cost of Rs 651.14 government, under the Pradhan Mantri Matsya Sampada Yojana (PMMSY) scheme, provides financial assistance to the state governments, Union Territories and implementing agencies for the construction of fishing harbours, fish landing centres, the modernisation/upgradation of existing fishing harbours and the maintenance dredging of the fishing the last five years from 2020-21 to 2024-25, Rs 3,490 crore have been allocated under the scheme provides for sustainable investment in infrastructure with the objective of enhancing production, productivity, exports and addressing key gaps, including the reduction of post-harvest losses in various components of the value chain.


Hindustan Times
8 minutes ago
- Hindustan Times
Bengaluru's twin tunnel project to use slurry boring machines for excavation: Report
Plans for Bengaluru's new twin tunnel road, which will link Hebbal's Esteem Mall Junction and Silk Board Junction, will rely on slurry tunnel boring machines (TBMs) to do the heavy digging. A Tunnel Boring Machine (TBM). (Representative image)(PTI) The organization overseeing the project, B-SMILE, opted not to use hard rock TBMs — machines generally preferred when excavating through areas riddled with boulders. Their decision comes after evaluating the city's subsurface, which blends both stones and softer soil, making slurry TBMs a better fit for the job. ALSO READ | Bengaluru resident questions city's liveability after 9 years: 'We're all just surviving' BS Prahlad, the project's technical director, shared that lessons from an earlier tunnel build in Mumbai pushed the team toward slurry-based machines this time around, according to The Hindu. ALSO READ | L&T terminated Corridor-2, Corridor-4 contracts of suburban rail project illegally: K-RIDE For the twin tunnel project, a total of eight tunnel boring machines will be brought in, starting work from five or six launch sites along the nearly 17-kilometre route. The massive venture is structured under a Build, Own, Operate, and Transfer (BOOT) model, which means successful bidders will be responsible for acquiring and managing the machinery, whether they import or locally assemble the TBMs themselves, the report stated. Past tunnel work in Bengaluru — like the Namma Metro — has achieved boring rates between 1.6 and 2 kilometres per year using similar technologies. The exact pace on this project will ultimately depend on the ground composition encountered during the drilling process. As part of the tendering process, the government is providing borewell survey information, but insists that detailed site investigation and analysis will be the winning bidder's responsibility. ALSO READ | Japanese man compares Bengaluru airport to a luxury hotel: 'Never seen anything like this before' The twin tunnel itself, spanning roughly 16.7 kilometres, aims to ease congestion by providing a new north-south route beneath the city's surface. Geological experts say the use of slurry TBMs may also help fill and secure natural fractures in Bengaluru's ancient, complex underground rock, some parts of which date back several billion years.