logo
Sohna Road caves in for fifth time as GMDA fails to repair master pipeline

Sohna Road caves in for fifth time as GMDA fails to repair master pipeline

Hindustan Times3 days ago
Jun 30, 2025 11:50 PM IST
Gurugram: A large portion of the surface road on the Sohna highway caved in on Monday evening leaving 20 square feet gaping hole, which was barricaded by the highway maintenance company. National Highways Authority of India (NHAI) officials said that this was the fifth time the highway had caved in at the same stretch due to a damaged master sewage line, which is in very poor condition. A portion of the surface road on the Sohna highway caved in on Monday evening leaving 20 square feet gaping hole. (HT PHOTO)
The road has been barricaded and signages installed for commuters to avoid the stretch, they added.
An official of the highway project contractor, Oriental Engineering, said that just a few days earlier, GMDA officials had repaired a similar damaged stretch of sewage pipeline near Shishpal Vihar and asked them to repair the road. 'The sinkhole is 5 feet by 4 feet and is quite large. It happened on Monday evening at the same place where the road was damaged last year. The sewage drain under the Sohna Road is almost 20 years old and in bad shape. It needs to be reconstructed or repaired,' the official said.
NHAI project director, Yogesh Tilak, said that they had brought the matter to the notice of GMDA. 'We had asked the GMDA for permanent repairs earlier and we will do it again today. It is the fifth time the road has collapsed,' he said.
A senior GMDA official, who is aware of the matter, said that they have decided to carry out permanent repairs to the damaged sewage pipeline, which is quite old to prevent any further recurrence of such incidents. 'The tender for the project will be floated again. This master sewage pipeline will be repaired through the CIPP technology,' the official said.
Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

Delhi-Jaipur In 3 Hours: Trial Run On Expressway Link Begins
Delhi-Jaipur In 3 Hours: Trial Run On Expressway Link Begins

NDTV

timea day ago

  • NDTV

Delhi-Jaipur In 3 Hours: Trial Run On Expressway Link Begins

Jaipur: The trial run on the Bandikui-Jaipur Link Expressway, connecting the Delhi-Mumbai Expressway to Jaipur, started on Wednesday. The journey from Jaipur to Delhi will now take just 2.5 to 3 hours, offering a faster and smoother travel experience. The trial run started at 8 a.m., and no toll will be levied during this trial period of ten days. The ultramodern expressway is undergoing quality checks and facility testing through the trial runs to identify and rectify any shortcomings before toll collection officially begins in the coming days, said officials. On the first day, the expressway was opened directly for traffic. Additionally, the Khuri Interchange has been made operational to manage traffic coming from the Manoharpur-Kauthun highway. If all goes smoothly, traffic from other interchanges will also be allowed on the expressway within a day or two. The 67-kilometre-long, four-lane access-controlled expressway stretches from Bandikui in Dausa district to Jaipur in Rajasthan and is nearly complete. Vehicles will be permitted to travel at speeds of up to 120 km/h on this modern roadway. Impressively, construction was completed ahead of schedule. Once fully operational, the expressway will significantly reduce travel time and will reduce the journey from Bandikui to Jaipur to just 25-30 minutes, compared to the previous duration of over an hour, which will eventually reduce travel time from Jaipur to Delhi and so on. Furthermore, with its link to the Delhi-Mumbai Expressway, travel time from Gurugram to Bandikui will be reduced to just three hours. Other tracks which will be connected on the Expressway include Delhi-Mumbai Expressway, Manoharpur-Kauthun Highway (via Khuri Interchange) and additional interchanges which will be opened soon, depending on trial success. "All preparations for toll collection are complete. As soon as we receive the green signal from higher authorities, toll operations will commence," said B.S. Joiya, Project Director, NHAI Dausa Unit. According to officials from the National Highways Authority of India (NHAI), the 66.91-kilometre-long Bandikui-Jaipur Expressway has been constructed at a cost of Rs 1,368 crore. During the ongoing trial phase, all vehicles except tractors, motorcycles, and other restricted categories will be allowed to pass without interruption. Once fully operational, the new expressway is expected to significantly reduce travel time, with the journey from Jaipur to Delhi expected to take just 2.5 to 3 hours. Proposed Toll Rates (for private cars) include Rs 150 for the 66.91 km Jaipur-Bandikui Expressway, Rs 550 to Rs 560 for the full Jaipur-Bandikui-Sohna stretch, Rs 130 for the Sohna-Gurugram six-lane highway and Rs 680 to Rs 690 total toll between Jaipur and Delhi.

NICE Road toll fee hiked by up to Rs 5
NICE Road toll fee hiked by up to Rs 5

Time of India

time2 days ago

  • Time of India

NICE Road toll fee hiked by up to Rs 5

Bengaluru: Toll on NICE Road, which provides congestion-free commuting on the periphery of Bengaluru linking suburbs and tech and industrial hubs, has been increased by up to 7% effective July 1 for various categories of vehicles. Nandi Economic Corridor Enterprises (NECE), which operators the road that connects Tumakuru Road with Hosur Road covering a length of 45km and comprising seven stretches, called the revision an annual exercise. According to a public notice, the revision is in line with the concession agreement signed with Karnataka government in 2000. For cars, toll fees have been increased by Rs 3 to Rs 5, depending on the stretch. For example, on the longest stretch — from Mysuru Road to Magadi Road — toll has gone up from Rs 65 to Rs 70. You Can Also Check: Bengaluru AQI | Weather in Bengaluru | Bank Holidays in Bengaluru | Public Holidays in Bengaluru Fees have been revised for two-wheelers, too, on certain stretches. For instance, toll for the stretch from Hosur Road to Bannerghatta Road has increased from Rs 25 to Rs 30. However, there are no changes in toll rates for two-wheelers on four other stretches. Recently, toll fees were revised for Electronics City elevated corridor and Kanakapura Road, while NHAI has proposed toll collection for the 70km Bengaluru-Chennai Expressway unofficially opened within Karnataka limits. Get the latest lifestyle updates on Times of India, along with Doctor's Day 2025 , messages and quotes!

NHAI appoints Ceigall India to develop 35.4 km long northern Ayodhya bypass
NHAI appoints Ceigall India to develop 35.4 km long northern Ayodhya bypass

Time of India

time2 days ago

  • Time of India

NHAI appoints Ceigall India to develop 35.4 km long northern Ayodhya bypass

The four-six lane project to be developed under National Highways Development Project (NHDP) Phase-V-II in Uttar Pradesh will be built on hybrid annuity mode (HAM) at an estimated project cost of Rs 1199.30 crore. Tired of too many ads? Remove Ads The National Highways Authority of India NHAI ) has appointed Ceigall Northern Ayodhya Bypass Private Limited, a subsidiary of Ceigall India , for construction of 35.4 km long northern Ayodhya bypass on hybrid annuity mode (HAM) with an estimated project cost of Rs 1199.30 four-six lane project to be developed under National Highways Development Project (NHDP) Phase-V-II in Uttar Pradesh will commence from July 9, 2025.'This is in reference to the NHAl letter dated 01.07.2025 and joint memorandum signed between authority and concessionaire on 25.06.2025, the appointed date of the project is declared w.e.f 09.07.2025 in line with the concession agreement,' NHAI said on Tuesday.'As regard to maintenance of the highway, proper care shall be taken and traffic worthiness and safety shall be ensured at all times as per the provisions of the concession agreement by the concessionaire from the appointed date,' it added.

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into a world of global content with local flavor? Download Daily8 app today from your preferred app store and start exploring.
app-storeplay-store