logo
What Do You Think Of Mumbai Metro-11 From Anik Depot To Gateway Of India? Tell MMRCL By August 20

What Do You Think Of Mumbai Metro-11 From Anik Depot To Gateway Of India? Tell MMRCL By August 20

News183 days ago
Last Updated:
Mumbai Metro 11 will have underground stations covering areas such as Wadala Truck Terminal, Sewri, Byculla, Bhendi Bazaar, and Crawford Market, terminating near Gateway of India
The Mumbai Metro Rail Corporation Limited (MMRCL) has invited suggestions and objections from citizens on the proposed 17.5-km Metro Line-11, which will stretch from Anik Depot to Gateway of India, passing through key locations like Bhendi Bazaar and Nagpada.
The project, financed by the Japan International Cooperation Agency (JICA), is a key part of Mumbai's expanding metro network and aims to enhance connectivity in the city's eastern and southern corridors.
Metro-11: Anik Depot to Gateway of India
Metro Line-11 will have underground stations covering major areas such as Wadala Truck Terminal, Sewri, Byculla, Bhendi Bazaar, and Crawford Market, terminating near Gateway of India. Only Anik Depot will be at ground level.
Metro Line 11 will link with Metro Line 4 (Wadala-Kasarvadavli), the Aqua Line, the Monorail, and major suburban railway stations like Byculla and CSMT, making it a vital interchange route in the city's public transport network.
The MMRCL published the alignment and environmental and social impact assessment report for the proposed Wadala-Gateway of India underground Metro Line 11. According to the report, over 2,200 trees will either be cut or transplanted, and 796 structures are likely to be impacted by the construction work, affecting a total of 801 families.
As per the social impact assessment report for this proposed metro 11, total permanent land requirement for the project is estimated at 24.65 hectares, including 15.85 hectares for the proposed depot at Anik Bus Depot, which will be developed jointly with the existing bus facility.
While most of the alignment is underground, the project will require land for entry/exit points and ancillary services. Temporary land usage of around 17.44 hectares is also planned during the construction phase. Efforts have been made to minimize displacement and land acquisition, with only 2.3 hectares of private land needed. However, the corridor will affect certain residential and commercial structures, including huts, and may result in relocation.
Compensation will be provided as per the Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013, and in accordance with the MMRC and MUTP resettlement policies the report reads.
How and where to give feedback on Metro-11? What happens after that?
The report has been uploaded on MMRC's official website, and the corporation has invited objections and suggestions from citizens and stakeholders till August 20. This public consultation process is expected to guide final decisions and any possible changes to the project design or route.
Written suggestions or objections can be submitted until 6 PM on August 20, 2025 to the Director (Planning & Real Estate Development), MMRC, at the Bandra-Kurla Complex or via email.
A public hearing will be held following the consultation period, with details to be announced through newspapers.
view comments
Disclaimer: Comments reflect users' views, not News18's. Please keep discussions respectful and constructive. Abusive, defamatory, or illegal comments will be removed. News18 may disable any comment at its discretion. By posting, you agree to our Terms of Use and Privacy Policy.
Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

Namma Yatri Launches ‘Namma Transit': Bengaluru's Leap into Building the Future of Mobility Together
Namma Yatri Launches ‘Namma Transit': Bengaluru's Leap into Building the Future of Mobility Together

Hans India

timea day ago

  • Hans India

Namma Yatri Launches ‘Namma Transit': Bengaluru's Leap into Building the Future of Mobility Together

Bengaluru Namma Yatri today launched Namma Transit- a transformative feature in its app that reimagines public mobility by making the entire Metro-plus-first-and- last-mile experience seamless, intelligent, and deeply commuter-centric. More than just connecting rides, Namma Transit offers a fully integrated journey- guiding users at every step, in real time, from their doorstep to destination. With Namma Transit, the Namma Yatri app becomes your personal transit assistant. It shows which Metro station to head to, which platform and gate to use, when to switch modes, and tracks both Metro and auto in real time. Whether it's a countdown for the next train, directions on station exits, or smart nudges to alight at the right stop, the entire journey is in the commuter's control. The result is not just smoother travel - it's faster, more affordable, and greener. At the heart of this innovation is a simple belief: public transport shouldn't feel like a compromise - it should feel like an upgrade. By unifying Metro, auto, and cabs into one app experience, Namma Transit makes Bengaluru's infrastructure accessible, intuitive, and enjoyable for all. Ravishankar J, Managing Director of Namma Metro, set the tone with a powerful vision: 'The Metro's duty is bigger than steel and track. It is to gift every Bengalurean an hour back each day. Our expansion will deliver that promise.' This collaborative, open mobility future envisaged by Beckn open protocol and made possible by the ONDC open network, signals a new era where public infrastructure and citizen-facing technology come together to serve people better. The event was graced by Shri Tejasvi Surya, MP, Bengaluru South, who shared a passionate call to action: 'Namma Bengaluru wins when public transport beats private habit. Let's expand the Metro, electrify every feeder, and prove that Namma Bengaluru can outrun its traffic tales.' Speaking on the occasion, the founders of Namma Yatri, Magizhan and Shan, summed it up with conviction: 'Mobility should feel like magic, not a daily grind. With Namma Transit, we've designed every element, from booking to alerts - to make public transport the first choice. This is our contribution to a Bengaluru that moves with speed, efficiency, and trust.'

Noida: 2.6km Metro Extension To Bodaki Gets Central Green Signal, Know More
Noida: 2.6km Metro Extension To Bodaki Gets Central Green Signal, Know More

News18

timea day ago

  • News18

Noida: 2.6km Metro Extension To Bodaki Gets Central Green Signal, Know More

Noida: 2.6km Metro Extension To Bodaki Gets Central Green Signal, Know More Curated By : Last Updated: July 25, 2025, 12:09 IST The new stretch will improve connectivity in deeper parts of Greater Noida, including Junpat village. Advertisement The central government has officially cleared a 2.6-kilometre extension of Noida Metro's Aqua Line from Depot station to Bodaki in Greater Noida. This stretch will be built on standard gauge (1,435mm) with a 15kV AC overhead wire system. (Photo: Swarajya) This crucial link will connect passengers to the proposed multi-modal logistics hub and promises to be ready in three years. The total cost of the project is Rs 416.34 crore, as per Hindustan Times. Recommended Stories Why Does This Matter? This small extension is set to make a big impact. It will take metro access deeper into Greater Noida, reaching areas like Bodaki and Junpat village. With growing residential and industrial developments in these regions, the improved connectivity is expected to boost travel ease and reduce reliance on road transport. Who's Funding the Project? The financial load will be shared among various government agencies. Rs 211.80 crore will come from central institutions like the National Capital Region Planning Board. The Centre will pitch in with Rs 70.59 crore. Uttar Pradesh government will contribute Rs 91.08 crore. Rs 10.44 crore will go towards land acquisition. What's Next on the Cards? While the Bodaki extension is a go, NMRC is now eyeing the green light for two more projects: A major 11.56km link from Botanical Garden to Noida Sector 142 A 5km connection from Sector 51 to Knowledge Park 5 in Greater Noida West top videos View all Swipe Left For Next Video View all The Botanical Garden route is especially crucial, as it will bring seamless integration between Delhi Metro's Blue Line and Noida Metro's Aqua Line, making it easier to reach Noida International Airport in Jewar. NMRC has already completed the topography survey for the 11.56km route, mapping buildings, homes, and markets along the planned track. Once approved, work will begin at full speed. About the Author Samreen Pall Samreen Pall, Senior Sub-Editor at News18, is a Computer Science graduate but a writer at heart, Samreen has one motto that she swears by: 'Everything is dull and useless if it has no drama in it.' This motto c... Read More Samreen Pall, Senior Sub-Editor at News18, is a Computer Science graduate but a writer at heart, Samreen has one motto that she swears by: 'Everything is dull and useless if it has no drama in it.' This motto c... Read More Get the latest updates on car and bike launches in India — including reviews, prices, specs, and performance. Stay informed with breaking auto industry news , EV policies, and more, Also Download the News18 App to stay updated! view comments First Published: July 25, 2025, 12:09 IST News auto Noida: 2.6km Metro Extension To Bodaki Gets Central Green Signal, Know More

Metro Line 3 trial run conducted on 4km stretch; 88% of work completed
Metro Line 3 trial run conducted on 4km stretch; 88% of work completed

Time of India

time2 days ago

  • Time of India

Metro Line 3 trial run conducted on 4km stretch; 88% of work completed

1 2 P une: A second trial run of the Metro Line 3 project, connecting Hinjewadi IT Park with Shivajinagar, was conducted recently on a 4km stretch between Maan Depot and station PMR04. The trial, conducted earlier this week, was carried out at a speed of 40 kmph to test the track and system readiness, said Metro officials. The previous trial run was conducted early this month. "We have achieved 88% progress in project completion and will continue with more trial runs along the stretch," said a senior PMRDA official. Officials said the trial run is part of a series of tests planned in the run-up to the commissioning and marks a major step toward operational readiness. You Can Also Check: Pune AQI | Weather in Pune | Bank Holidays in Pune | Public Holidays in Pune The 23.3km fully elevated corridor is being developed under a public-private partnership (PPP) model between Pune Metropolitan Region Development Authority (PMRDA) and Pune IT City Metro Rail Ltd, led by the Tata Group. The project's appointed date was Nov 25, 2021, with the commercial operation date (COD) being March 2026. "We are speeding up work on the entire stretch with trial runs and more coaches are expected to arrive soon,'' said the official. Once operational, Metro Line 3 will feature 23 stations and offer seamless connectivity with existing Metro lines, aiming to ease traffic congestion and improve urban mobility along the city's bustling IT corridor, added officials. Five modern train sets, manufactured by Alstom, have arrived in Pune. Each set comprises three fully air-conditioned coaches with a total capacity of around 1,000 passengers. The trains can run at speeds of up to 80 kmph and operate on a 750V DC third-rail electrification system, ensuring smooth and energy-efficient transit, said the official. The corridor would be operated using CBTC (communication-based train control) signalling technology, known for enhancing safety, reliability, and frequency of Metro services, added officials.

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into a world of global content with local flavor? Download Daily8 app today from your preferred app store and start exploring.
app-storeplay-store