
Roadmap for MUTP-IV to boost commuter safety & connectivity
The goal is to boost safety, expand network capacity, and modernise the city's vital suburban rail system.
Mumbai's suburban rail spans 385km across three Central Railway corridors — including the Harbour Line — and one Western Railway corridor. With MUTP-I completed, MUTP-II nearing conclusion, and MUTP-III and IIIA underway, MRVC is setting the stage for a long-term upgrade aligned with its "Mission Zero Death" initiative.
The study, to be carried out by a consultant selected via competitive bidding, will draft Detailed Project Reports (DPRs) for selected schemes and evaluate their financial and operational viability. The consultant will also examine international best practices in suburban transport planning.
You Can Also Check:
Mumbai AQI
|
Weather in Mumbai
|
Bank Holidays in Mumbai
|
Public Holidays in Mumbai
A key focus is forecasting travel demand up to 2047, identifying new corridors, and decongesting existing ones. The feasibility of interoperable train services between Central and Western Railways — aimed at seamless east-west connectivity across the Mumbai Metropolitan Region — will also be assessed.
To ease overcrowding, the study will simulate the deployment of 12- and 15-car rakes, explore faster rake acceleration, and recommend signalling upgrades such as Kavach 5.0 to reduce headways. Increasing the number of air-conditioned EMUs is also on the agenda to improve commuter comfort and drive a shift from road to rail.
With around 2,500 annual fatalities on the suburban network due to falls, trespassing, and poor station access, the study will recommend interventions such as access control, improved pedestrian movement, and upgraded station infrastructure.
Station improvements are a major component. While 17 stations are already being redeveloped under MUTP-IIIA, nearly 40 more are under review for upgrades, including platform extensions, new FOBs, escalators, lifts, and better intermodal connectivity within a 300-metre radius.
MRVC chairman and Managing Director Vilas Wadekar said, "Under MUTP Phase IV, MRVC aims to take a transformative leap towards a safer, smarter, and more resilient urban transport ecosystem. Our vision is anchored in achieving 'Mission Zero Death', eliminating monsoon disruptions, and expanding network coverage to growth centres like the Third Mumbai area."
Hashtags

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


The Hindu
3 hours ago
- The Hindu
HAML reduces property impact in Metro Phase II Old City alignment
Hyderabad Airport Metro Rail Limited (HAML), the Telangana government's special purpose vehicle tasked with planning and executing Phase II of the Hyderabad Metro Rail project, has announced a reduction in the number of affected properties along the 7.5 km stretch — from 1,000 to 900. HAML Managing Director N.V.S. Reddy stated in a press release on Sunday that this was achieved through 'engineering redesign and realignment.' The alignment has been carefully optimized to minimize property impact, he said. Hyderabad Metro Rail Phase II will span 76.4 km across five corridors, including extensions to the existing 69.2 km Phase-I lines, at an estimated cost of ₹24,269 crore. The project is proposed as a joint venture with the Centre and is currently undergoing inter-ministerial appraisal in Delhi. Compensation totalling ₹360 crore has already been disbursed to affected property owners. Awards have been issued for 412 properties, and demolition of 380 has been completed. Daily review meetings are being held with engineering and revenue officials to monitor progress, he said. The MD said a detailed action plan has been prepared to acquire the remaining properties and expedite demolitions with the works gaining momentum. Groundwork for metro works is underway with locations for upcoming metro pillars identified and marking has commenced. The pillars, which will support the viaduct, will be spaced approximately 25 metres (about 82 feet) apart. A geotechnical agency has been appointed to conduct soil bearing capacity tests, which will begin shortly to prepare for metro stations and pillars. A Differential Global Positioning System (DGPS) survey has also been conducted to finalize locations without disturbing historical or sensitive structures. Temporary Bench Mark (TBM) locations have been fixed to aid survey work during construction. Arrangements are being made to shift underground sewerage, water pipelines, stormwater drains, and overhead electricity lines in areas where metro stations and pillars will be located, he explained. All overhead electric lines will be converted to underground cabling as per the directions of Chief Minister A. Revanth Reddy. Departments such as the Water Board, GHMC and TSSPDCL have been asked to submit their estimates in the coming days.


Mint
a day ago
- Mint
NotebookLM might be Google's coolest AI tool yet: Here are 7 features you'll actually want to use
Google has been aggressive with its AI launches this year and has kept OpenAI and others in the AI field on their toes with the latest Gemini model announcements. However, Google's AI strategy is not just about bringing newer and newer features to Gemini. There are other AI-powered products the tech giant is working on quietly in the background. One Google AI tool that almost always slips under the radar is NotebookLM, the company's research and note-taking tool, which continues to earn praise on social media. NotebookLM first started under the codename 'Project Tailwind' inside Google before the company unveiled it at the I/O 2023 conference. While the AI tool received great reviews from users, Google's focus on Gemini meant that NotebookLM didn't always have the company's full attention. This year, however, things have changed for good. Google has not only announced an Android and iOS app for NotebookLM in May but has also introduced more novel features like video overviews. Project Tailwind In case you don't know about NotebookLM, here's a look at its top features. Unlike a traditional chatbot like Gemini or ChatGPT, users have the ability to upload various types of sources in their 'Notebook' in the app. These sources can include PDFs, Google Docs, Slides, website links, YouTube videos, audio files, and markdown files. The uploaded content then acts as the knowledge base for NotebookLM, which the AI analyzes to answer user queries in natural language. Since NotebookLM does not rely on generic or external information like other AI chatbots, it stays grounded in context and reduces the chances of hallucinations or factual errors. Users are not limited to a single source in NotebookLM. They can upload multiple file formats together, allowing the AI to pull information across different types of content and provide more informed summaries and responses. NotebookLM goes beyond basic summarisation. It can generate insights, identify trends, and suggest new ideas by drawing connections across the documents uploaded by the user. NotebookLM is an excellent study companion. It can summarise lengthy PDFs or slides and generate FAQs, quizzes, key terms, and more from the material. Users can also create and organise manual notes within the notebook. This helps students revisit topics by reviewing both AI-generated and personal notes while using the in-built study tools for better understanding. Perhaps the standout feature of NotebookLM is its ability to turn dry or complex topics—like a product guide or a policy document—into audio overviews. These are styled like a two-person podcast, making the content more engaging. Imagine uploading Plato's Republic or Bertrand Russell's History of Western Philosophy and listening to it as a podcast-style dialogue. Audio overviews in NotebookLM Much like the audio overviews, Google recently rolled out video overviews for NotebookLM. This feature converts source material into AI-narrated slideshows or explainer videos. The AI pulls in images, diagrams, quotes, and figures from the original content. Users can also add custom visuals to highlight key points more effectively. NotebookLM currently supports over 80 languages, including several Indian ones such as Hindi, Urdu, Marathi, Bengali, Gujarati, Kannada, Maithili, Oriya, Punjabi, and Tamil. Users can interact with the assistant in these languages, upload content written in them, and even generate audio overviews natively.


Time of India
2 days ago
- Time of India
India has 29,277 EV charging stations, Karnataka leads: Minister
There are now a total of 29,277 electric vehicle (EV) charging stations across the country, the Parliament was informed on Friday. Karnataka leads with 6,097 EV charging stations, followed by Maharashtra at 4,155 and Uttar Pradesh at 2,326, Minister of State for Steel and Heavy Industries, Bhupathiraju Srinivasa Varma, told the Lok Sabha in a written reply. The Power Ministry issued the 'Guidelines for Installation and Operation of Electric Vehicle Charging Infrastructure-2024', in September last year, and the 'Guidelines for Installation and Operation of Battery Swapping and Charging Stations', in January this year, which lay down standards and protocols for developing a nationwide network of electric vehicle charging infrastructure, battery charging, and battery swapping stations. "An allocation of ₹ 2,000 crore has been made under the PM E-DRIVE Scheme to support the "setting up of adequate public charging infrastructure for various categories of electric vehicles" on a pan-India basis in consultation with ministries, states and other stakeholders," informed the minister. The PM E-DRIVE scheme was launched in October 2024 to accelerate the adoption of electric vehicles (EVs) through demand incentives and expand EV charging infrastructure nationwide. The Centre has allocated ₹ 10,900 crore for subsidies to EVs under this scheme. When it comes to Tier-2 cities, there are as many as 4,625 EV charging stations operational in the country (as on April 1, 2025). Meanwhile, the government has supported a total of 18,84,905 electric vehicles (EVs) under the Faster Adoption and Manufacturing of (Hybrid and) Electric Vehicles in India (FAME India) scheme till June 30 this year. Under the FAME-II scheme, the government supported 16,29,600 vehicles. The FAME-II scheme sanctioned a total of ₹ 912.50 crore for the installation of 9,332 EV PCS, out of which 8,885 EVPCS have been installed (as on June 30), said Varma. The FAME schemes were applicable all across the country, including Tier 2 and Tier 3 cities. The FAME-I Scheme duration was 2015-2019, and the duration of the FAME-II scheme was 2019-2024.