logo
RM1.5 mln allocated for Pantai Siring erosion project in Melaka

RM1.5 mln allocated for Pantai Siring erosion project in Melaka

The Sun22-07-2025
JASIN: The Federal Government has allocated RM1.5 million to address coastal erosion at Pantai Siring in Pulai, Melaka, through the Department of Irrigation and Drainage (DID). The project involves constructing a 120-metre rock revetment, set to begin in October and complete by year-end.
Melaka Chief Minister Datuk Seri Ab Rauf Yusoh stated that the initiative is part of ongoing efforts to mitigate erosion, classified as moderate under the 2024 Integrated Shoreline Management Plan (ISMP). 'Pantai Siring currently experiences an erosion rate of 3.7 metres per year, down from 6.5 metres in 2015. However, three barrier collapses have occurred since September 2024, the latest on June 5,' he said during a site visit.
The high tide phenomenon has also affected nearby shrimp farms and agricultural land, disrupting local livelihoods. Temporary measures, including jumbo bags and mangrove piling, were implemented at a cost of RM100,000. 'The state welcomes this allocation and remains committed to protecting Melaka's coastline for sustainability and economic stability,' Ab Rauf added. - Bernama
Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

Water levels at Bukit Merah Dam rise slightly after cloud seeding
Water levels at Bukit Merah Dam rise slightly after cloud seeding

The Star

time12 hours ago

  • The Star

Water levels at Bukit Merah Dam rise slightly after cloud seeding

IPOH: The recent cloud seeding operation conducted over Bukit Merah Dam has led to a slight improvement in water levels, but irrigation supply to the Kerian Irrigation Scheme remains suspended due to ongoing drought conditions. Perak water committee chairman Datuk Seri Mohammad Nizar Jamaluddin said the operation was carried out on Aug 4 following prolonged dry weather brought on by the Southwest Monsoon, which has severely affected catchment areas in Bagan Serai. 'Bukit Merah Dam had reached its irrigation supply cut-off level of 6.096m (20feet) on July 22 due to the lack of rainfall. 'According to standard operating procedures, irrigation supply was halted to prioritise raw water needs,' he said in a statement Tuesday (Aug 5). Mohammad Nizar said the cloud seeding exercise was led by the National Disaster Management Agency (Nadma), with support from the Malaysian Meteorological Department (MetMalaysia), Royal Malaysian Air Force (RMAF), and other related agencies. He said Deputy Prime Minister and National Disaster Committee chairman Datuk Seri Dr Ahmad Zahid Hamidi was present to observe the operation via an aerial monitoring flight over the dam. 'According to the Drainage and Irrigation Department (DID), the operation brought effective rainfall to several catchment areas between 12pm and 2pm, with increased water inflow recorded at the Pondok Tanjung Station from 3pm onwards. 'As of 8am on Aug 5, the water level at the dam rose from 6.035m to 6.096m. Its storage capacity also increased from 12.2% to 13.31%,' he said. He added that despite the improvement, the dam's status remains at the irrigation cut-off level. 'DID said the increased storage would help extend domestic water supply, but irrigation to padi fields under the Kerian scheme could not yet be resumed. 'The department will continue to closely monitor the situation and coordinate with relevant agencies to ensure water supply remains at a safe and sustainable level,' he added.

Sandakan bushfire extinguished
Sandakan bushfire extinguished

Daily Express

time6 days ago

  • Daily Express

Sandakan bushfire extinguished

Published on: Thursday, July 31, 2025 Published on: Thu, Jul 31, 2025 By: Mardinah Jikur Text Size: The bushfire in Sandakan. SANDAKAN: A bushfire involving six acres was reported near the road at Kampung Tinosa 1, Batu 7, here, on Tuesday. A witness alerted the Sandakan Fire and Rescue Station (BBP) at 7.25pm. Sandakan Fire and Rescue Station Chief Jimmy Lagung said eight personnel were dispatched to the location, some 12km from the station, arriving at 7.38pm. He said the fire team extinguished the blaze using water from the fire engine, portable pumps and fire suppression tools. 'The operation was brought under control at 8.10pm and concluded at 8.28pm,' he added. The firefighters had a tough time because of strong winds, the wide area of bush and inability of their vehicles to get close. Also assisting at the scene were the police and Civil Defence Force (APM) personnel. Jimmy advised the public to cease open burning or engaging in similar activities. Under Section 29(A) of the Environmental Quality Act 1974, a maximum compound of RM2,000 may be imposed for each offence, a fine not exceeding RM500,000, imprisonment of up to five years, or both. * Follow us on our official WhatsApp channel and Telegram for breaking news alerts and key updates! * Do you have access to the Daily Express e-paper and online exclusive news? Check out subscription plans available. Stay up-to-date by following Daily Express's Telegram channel. Daily Express Malaysia

RM1.5 mln allocated for Pantai Siring erosion project in Melaka
RM1.5 mln allocated for Pantai Siring erosion project in Melaka

The Sun

time22-07-2025

  • The Sun

RM1.5 mln allocated for Pantai Siring erosion project in Melaka

JASIN: The Federal Government has allocated RM1.5 million to address coastal erosion at Pantai Siring in Pulai, Melaka, through the Department of Irrigation and Drainage (DID). The project involves constructing a 120-metre rock revetment, set to begin in October and complete by year-end. Melaka Chief Minister Datuk Seri Ab Rauf Yusoh stated that the initiative is part of ongoing efforts to mitigate erosion, classified as moderate under the 2024 Integrated Shoreline Management Plan (ISMP). 'Pantai Siring currently experiences an erosion rate of 3.7 metres per year, down from 6.5 metres in 2015. However, three barrier collapses have occurred since September 2024, the latest on June 5,' he said during a site visit. The high tide phenomenon has also affected nearby shrimp farms and agricultural land, disrupting local livelihoods. Temporary measures, including jumbo bags and mangrove piling, were implemented at a cost of RM100,000. 'The state welcomes this allocation and remains committed to protecting Melaka's coastline for sustainability and economic stability,' Ab Rauf added. - Bernama

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into a world of global content with local flavor? Download Daily8 app today from your preferred app store and start exploring.
app-storeplay-store